Bungalow colony - cooperatively owned land
202-30 ROCKAWAY POINT BLVD
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
460,000 sfGross Floor Area
539Units
LL97 Covered11 Open Violations 2 unresolved · 9 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 3,589,344 sf lot · 0.13 FAR built · Flood zone AE
Locations of Work
ArchitecturePlumbingEquipmentGeneral
Floor 32p · 1 filing · 2 docs
Floor 22p · 1 filing · 2 docs
Floor 16p · 1 filing · 4 docs
Site & exterior2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE, INC.1104/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEON SKVIRSKY PE211/18/2025
NORMAN C. LOK, PE102/12/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BARNEY REILLY CORPORATIONGeneral Contractor304/09/2026
JOSEPH O'GRADY P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NORMAN C. LOK818102/09/2025
Building Lifecycle
All (23)Filed (3)Permit Issued (3)Violation (3)Inspection (12)Special Inspection (2)
03/31/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/31/2026
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
03/31/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/27/2026
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
03/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/12/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/09/2026
Permit issued — Plumbing
Q01320518-I1-PL
01/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/18/2025
Filed — Alteration
Q01320518-I1
10/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/22/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/26/2025
Permit issued — Construction Fence
Q01179221-I1-FN
09/26/2025
Permit issued — General Construction
Q01172530-I1-GC
02/12/2025
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE
Q01179221-I1
02/09/2025
Filed — Alteration
PROPOSED ONE STORY ADDITION
Q01172530-I1
02/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NORMAN LOK
01/27/2025
Special inspection requirement — Final
LEON SKVIRSKY
11/13/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/19/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/19/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOSEPH O'GRADY P & H INC01/09/2026
DOB NOWConstruction FenceSigned-offBARNEY REILLY CORPORATION09/26/2025
DOB NOWGeneral ConstructionSigned-offBARNEY REILLY CORPORATION09/26/2025
2 projects · most recent 12/15/2025
General Wiring
FiledStatusContractorScope
12/15/2025CompleteG.E.O. ELECTRIC CORPGeneral Wiring
11/18/2025Permit IssuedG.E.O. ELECTRIC CORP1 meters
1 project · most recent 02/12/2025
Fence
FiledStatusContractorScope
02/12/2025Signed-offBARNEY REILLY CORPORATIONFence
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/31/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/31/2026Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
03/31/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2026Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
03/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/12/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
02/09/2025Structural Stability – Alterations of existing buildingsNORMAN LOKspecial
01/27/2025FinalLEON SKVIRSKYprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026Q01172530-I1Request digital key ↗
08/20/2026Q01179221-I1Request digital key ↗
08/18/2026Q01320518-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026Q01179221-I1Open ↗
08/18/2026Q01320518-I1Open ↗
08/13/2026Q01172530-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026Q01172530-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q01172530-I1Open ↗