Bungalow colony - cooperatively owned land
202-30 ROCKAWAY POINT BLVD
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
460,000 sfGross Floor Area
539Units
LL97 Covered11 Open Violations 2 unresolved · 9 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 3,589,344 sf lot · 0.13 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE, INC.1007/08/2026
BREEZY POINT COOP203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TPG ARCHITECTURE, LLP312/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
195 BROADWAY PROPERTY603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BIG APPLE PLBG CORPPlumbing307/08/2026
G.E.O. ELECTRIC CORPElectrical103/22/2026
Building Lifecycle
All (11)Filed (3)Permit Issued (3)Signed Off (1)Inspection (4)
02/02/2026
Signed off — Alteration
HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES. APPLICATION IS FILED TO SUPERSEDE APPLICATION 400522877, WORK WAS APPROVED AND PERMITTED BUT NOT SIGNED OFF. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q00885069-I1
12/16/2025
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES. APPLICATION IS FILED TO SUPERSEDE APPLICATION 400522877, WORK WAS APPROVED AND PERMITTED BUT NOT SIGNED OFF. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q00885069-P2
09/26/2025
Permit issued — Plumbing
Q00885069-I1-PL
07/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/09/2025
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES. APPLICATION IS FILED TO SUPERSEDE APPLICATION 400522877, WORK WAS APPROVED AND PERMITTED BUT NOT SIGNED OFF. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q00885069-P1
01/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/12/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/17/2024
Permit issued — Plumbing
Q00885069-I1-PL
11/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/14/2023
Permit issued — Plumbing
Q00885069-I1-PL
07/26/2023
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES. APPLICATION IS FILED TO SUPERSEDE APPLICATION 400522877, WORK WAS APPROVED AND PERMITTED BUT NOT SIGNED OFF. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q00885069-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBIG APPLE PLBG CORP09/26/2025
DOB NOWPlumbingSigned-offBIG APPLE PLBG CORP10/17/2024
DOB NOWPlumbingSigned-offBIG APPLE PLBG CORP09/14/2023
BISPLISSUEDJOSEPH BATTISTA PLG.02/06/1996
BIS—ISSUEDFERRARA CUSTOM CONSTRUCTION CORP01/03/1996
1 project · most recent 04/06/2022
General Wiring
FiledStatusContractorScope
04/06/2022CompleteG.E.O. ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/12/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026Q00885069-I1Request digital key ↗
08/20/2026Q00885069-P2Request digital key ↗
08/20/2026Q00885069-P1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
08/24/2022400522877Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026Q00885069-I1Open ↗
08/20/2026Q00885069-P1Open ↗
08/13/2026Q00885069-P2Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026Q00885069-I1Open ↗
08/20/2026Q00885069-P1Open ↗
08/13/2026Q00885069-P2Open ↗