← Back
BuildNYC
Elevator cooperative
Hilltop Village
202-35 FOOTHILL AVENUE · BIN 4434613
💬 Discuss this project
1954Year Built
6Stories
D4Building Class
R4Zoning
185,016 sfGross Floor Area
197Units
LL97 CoveredRent Stabilized31 Active Violations 30 unresolved · 1 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: Hilltop Village Cooperative #3 · 119,552 sf lot · 1.55 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofVerizon telecommunications site antenna and RRH installation2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
8750 204 St103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
APT208/30/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Telcom Engineering GPGeneral Contractor203/21/2026
Jay Helfgott ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Amaracon Testing & Inspec5842108/30/2023
Building Lifecycle
All (41)Filed (2)Permit Issued (1)Signed Off (1)Facade (FISP) (12)Violation (19)Objection (6)
01/04/2025
Violation issued (HPD, open)
B
01/04/2025
Violation issued (HPD, open)
B
01/04/2025
Violation issued (HPD, open)
B
01/04/2025
Violation issued (HPD, open)
C
01/04/2025
Violation issued (HPD, open)
B
01/04/2025
Violation issued (HPD, open)
B
01/04/2025
Violation issued (HPD, open)
B
09/11/2023
Objection resolved — Resolved
09/08/2023
Objection raised — Fire_Protection
09/08/2023
Objection raised — Other
09/08/2023
Objection raised — Fire_Protection
09/08/2023
Objection raised — Scope
09/08/2023
Objection raised — Zoning
08/30/2023
Filed — Alteration
Modification of existing VERIZON site. Install 2 mini microwave dishes on the roof.
Q00901706-I1
02/16/2023
Cycle 9 facade report submitted
02/16/2023
Cycle 9 facade report signed — SWARMP
01/06/2023
Cycle 9 facade inspection completed
07/06/2022
Violation issued (FDNY_NOV, closed)
02/02/2022
Violation issued (HPD, closed)
C
02/02/2022
Violation issued (HPD, open)
B
02/02/2022
Violation issued (HPD, open)
B
02/02/2022
Violation issued (HPD, open)
C
04/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/23/2021
Signed off — Alteration
Modification to existing Verizon telecommunications site. Replace (8) antennas and install (16) related RRH units and retrofit (1) equipment rack in existing equipment shelter on roof. All work in conformance with TPPN#5/98. No change in use, egress, or occupancy.
Q00021053-I1
01/20/2021
Violation issued (ECB, closed)
Construction
01/23/2019
Permit issued — Antenna
Q00021053-I1-AN
11/07/2018
Filed — Alteration
Modification to existing Verizon telecommunications site. Replace (8) antennas and install (16) related RRH units and retrofit (1) equipment rack in existing equipment shelter on roof. All work in conformance with TPPN#5/98. No change in use, egress, or occupancy.
Q00021053-I1
12/21/2017
Cycle 8 facade report submitted
12/17/2017
Cycle 8 facade report signed — SWARMP
12/07/2017
Cycle 8 facade inspection completed
08/16/2012
Cycle 7 facade report submitted
08/10/2012
Cycle 7 facade inspection completed
08/10/2012
Cycle 7 facade report signed — SWARMP
08/30/2010
Violation issued (ECB, closed)
Construction
07/22/2008
Violation issued (ECB, closed)
HPD
07/20/2006
Cycle 6 facade report submitted
05/10/2006
Cycle 6 facade report signed — SWARMP
02/15/2006
Cycle 6 facade inspection completed
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offLined Up Construction01/23/2019
BISOTISSUEDSquan Construction Services12/22/2015
BISOTISSUEDTelcom Engineering GP07/03/2014
BISOTISSUEDAllstate Restoration04/18/2014
BISOTISSUEDAllstate Restoration01/02/2014
BISOTISSUEDTelcom Engineering GP11/25/2013
BISEQISSUEDAdvanced Construction Equipment11/13/2013
BISEQISSUEDAdvanced Construction Equipment09/23/2013
BISOTISSUEDDavrial Enterprises02/23/2011
BISOTISSUEDMisa Plumbing04/18/2008
BISPLISSUEDMisa Plumbing04/18/2008
BISOTISSUEDCross State Construction Co08/02/2005
BISOTISSUEDTech-Nel Electric05/09/2003
3 projects · most recent 12/08/2023
General Wiring
FiledStatusContractorScope
12/08/2023Permit IssuedDVM Electrical Services2 meters, 1 new_meters
08/15/2023CompletePrecision Electrical ContGeneral Wiring
10/04/2018Permit IssuedJubilee Electrical Service CoGeneral Wiring
Nothing on file for this building.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/28/2026Q00021053-I1Request digital key ↗
08/15/2026Q00901706-I1Request digital key ↗
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION11
09/18/2020420302764Open ↗
05/31/2018440229343Open ↗
05/30/2018440229343Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION11
12/22/2015440229343Open ↗
08/07/2015440229343Open ↗
07/14/2014420898416Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications21
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
12/12/2018440229343Open ↗
08/05/2015420596046Open ↗
06/26/2015420898416Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026Q00021053-I1Open ↗
08/24/2026Q00901706-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/21/2013440106154Open ↗
▸BISPC FULL REPORT1
09/14/2007410002946Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/21/2013440106154Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/07/2015440229343Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/19/2013420596046Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/21/2013440106154Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/24/2012420596046Open ↗
▸Trade Schedules & Equipment2
▸BISFA - FDNY APPROVAL : FD-FAA1
06/08/2018440229343Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
06/09/2008410002946Open ↗
▸Environmental & Asbestos6
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
01/19/2011420302764Open ↗
09/14/2007410002946Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026Q00021053-I1Open ↗
08/15/2026Q00901706-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/17/2013420898416Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/08/2014420596046Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/12/2018440229343Open ↗
06/09/2015420898416Open ↗
10/17/2013420898416Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
12/12/2018440229343Open ↗
06/09/2015420898416Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/07/2015440229343Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/21/2013440106154Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/23/2020420302764Open ↗
08/07/2015440229343Open ↗
09/21/2013440106154Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
07/23/2020420302764Open ↗
12/12/2018440229343Open ↗
08/25/2015420596046Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/25/2015420596046Open ↗
11/27/2013420898416Open ↗
03/17/2009410002946Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
01/05/2011420302764Open ↗
09/14/2007410002946Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
12/12/2018440229343Open ↗
05/30/2018440229343Open ↗
08/07/2015440229343Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION3
06/08/2018440229343Open ↗
05/30/2018440229343Open ↗
12/18/2015440229343Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
08/07/2015440229343Open ↗
09/21/2013440106154Open ↗
▸BISEFILING COVER SHEET2
10/17/2013420898416Open ↗
07/24/2012420596046Open ↗