← Back
Two family brick
202-36 46 ROAD
QUEENS · BIN 4624620
💬 Discuss this project
2023Year Built
2.5Stories
B1Building Class
R3XZoning
2,690 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family brick · Owner of record: 202-38 46TH ROAD LLC · 4,000 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 23p · 2 filings · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FMN REALTY2707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/16/2024$1.8M—— → —$658/sf building
05/26/2022$988K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT102/25/2024
AMERILAND BROOK LLC609/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERGY SOLAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WINSON CONSTRUCTION INCGeneral Contractor907/08/2026
AMERGY SOLAR INCGeneral Contractor303/21/2026
W.JAKE CONSTRUCTION CORPGeneral Contractor303/21/2026
MPS PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802102/25/2024
AMERILAND BROOK LLC1506409/07/2023
Building Lifecycle
All (64)Filed (7)Permit Issued (8)Signed Off (5)Inspection (12)Objection (2)Special Inspection (30)
04/03/2024
Signed off — New Building
PROPOSE A NEW TWO STORY WITH TWO FAMILY HOUSE. OBTAIN NEW C OF O.
Q00785398-I1
03/27/2024
Signed off — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01009200-I1
03/07/2024
Permit issued — Solar
Q01009200-I1-SL
02/25/2024
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01009200-I1
02/21/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chun Feng
02/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
02/21/2024
Special inspection requirement — Final
Chun Feng
02/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
02/21/2024
Special inspection requirement — Air barrier - visual inspection
Chun Feng
01/26/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/30/2023
Signed off — Alteration
INSTALL 10' DROP CURB INCLUDING 1'-6" SPLAYS ON BOTH SIDE.
Q00785421-I1
11/22/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/16/2023
Signed off — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH NB JOB#Q00785398
Q00785417-I1
11/08/2023
Permit issued — Curb Cut
Q00785421-I1-CC
10/31/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/19/2023
Signed off — Alteration
Q00785420-I1
09/29/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/26/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/14/2023
Permit issued — Mechanical Systems
Q00785398-I1-ST
09/14/2023
Permit issued — Structural
Q00785398-I1-GC
09/14/2023
Permit issued — General Construction
Q00785398-I1-MS
09/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2023
Special inspection requirement — Duct leakage testing, insulation and design
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Chimneys and vents
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Fenestration areas
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Fenestration air leakage
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Air barrier — testing
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Final
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Subgrade Inspections
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Structural Steel - Details
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Heating Systems
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Masonry
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Lighting controls
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Electric vehicle service equipment requirements
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Insulation placement and R values
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Permanent certificate
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
09/09/2023
Special inspection requirement — Mechanical Systems
XIAOHONG ZHAO
09/07/2023
Filed — New Building
PROPOSE A NEW TWO STORY WITH TWO FAMILY HOUSE. OBTAIN NEW C OF O.
Q00785398-P1
09/05/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/29/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
08/15/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/10/2023
Filed — Alteration
INSTALL 10' DROP CURB INCLUDING 1'-6" SPLAYS ON BOTH SIDE.
Q00785421-I1
06/10/2023
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH NB JOB#Q00785398
Q00785417-P1
05/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/05/2023
Permit issued — Plumbing
Q00785417-I1-PL
11/25/2022
Permit issued — Mechanical Systems
Q00785398-I1-FO-EA
10/18/2022
Permit issued — Construction Fence
Q00785420-I1-FN
08/15/2022
Objection raised — Scope
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offAMERGY SOLAR INC03/07/2024
DOB NOWCurb CutSigned-offWINSON CONSTRUCTION INC11/08/2023
DOB NOWMechanical SystemsSigned-offWINSON CONSTRUCTION INC09/14/2023
DOB NOWStructuralPermit IssuedWINSON CONSTRUCTION INC09/14/2023
DOB NOWGeneral ConstructionSigned-offWINSON CONSTRUCTION INC09/14/2023
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING IN01/05/2023
DOB NOWMechanical SystemsSigned-offW.JAKE CONSTRUCTION CORP11/25/2022
DOB NOWConstruction FenceSigned-offWINSON CONSTRUCTION INC10/18/2022
1 project · most recent 09/07/2023
Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/07/2023Signed-offWINSON CONSTRUCTION INCAssociated Ducts and Piping, Heating Systems
Heating
Williamson GWA-140 140,000 BTU · Boiler ×4
Ducts & Piping
Delta Breeze SLIM50 50 CFM · Exhaust Fan ×14
Air King EB30BL 130 CFM · Kitchen Exhaust ×4
2 projects · most recent 02/25/2024
General Wiring
FiledStatusContractorScope
02/25/2024CompleteI.P. ELECTRIC INC—
02/24/2023CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 09/07/2023
Wood
FiledStatusContractorScope
09/07/2023Signed-offWINSON CONSTRUCTION INCWood
1 project · most recent 09/07/2023
Earthwork
FiledStatusContractorScope
09/07/2023Signed-offWINSON CONSTRUCTION INCEarthwork
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
01/26/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/22/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
10/31/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/26/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/29/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
08/15/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
02/21/2024Fire-Resistant Penetrations and JointsChun Fengspecial
02/21/2024Air barrier - visual inspectionChun Fengenergy_progress
02/21/2024FinalChun Fengprogress
02/21/2024Energy Code Compliance InspectionsChun Fengprogress
02/21/2024Structural Stability – Alterations of existing buildingsChun Fengspecial
09/09/2023Fenestration air leakageXIAOHONG ZHAOenergy_progress
09/09/2023Concrete - Cast-In-PlaceXIAOHONG ZHAOspecial
09/09/2023Mechanical SystemsXIAOHONG ZHAOspecial
09/09/2023Structural Steel - High Strength BoltingXIAOHONG ZHAOspecial
09/09/2023Structural Steel - DetailsXIAOHONG ZHAOspecial
09/09/2023Subgrade InspectionsXIAOHONG ZHAOspecial
09/09/2023Excavations - Sheeting, Shoring, and BracingXIAOHONG ZHAOspecial
09/09/2023Structural Steel - WeldingXIAOHONG ZHAOspecial
09/09/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
09/09/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
09/09/2023Chimneys and ventsXIAOHONG ZHAOspecial
09/09/2023Heating SystemsXIAOHONG ZHAOspecial
09/09/2023MasonryXIAOHONG ZHAOspecial
09/09/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
09/09/2023FinalXIAOHONG ZHAOprogress
09/09/2023Footing and FoundationXIAOHONG ZHAOprogress
09/09/2023Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
09/09/2023Lighting controlsXIAOHONG ZHAOenergy_progress
09/09/2023Fenestration areasXIAOHONG ZHAOenergy_progress
09/09/2023HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
Latest 25 of 89.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00785420-I1Request digital key ↗
08/24/2026Q00785417-P1Request digital key ↗
08/24/2026Q00785417-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
10/13/2022440746533Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/13/2022440746533Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00785398-I1Open ↗
08/13/2026Q00785398-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00785398-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026Q00785417-P1Open ↗
09/02/2026Q00785417-P1Open ↗
09/01/2026Q00785398-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026Q00785417-P1Open ↗
09/01/2026Q00785398-I1Open ↗
09/01/2026Q00785398-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026Q00785420-I1Open ↗
08/24/2026Q00785421-I1Open ↗
08/24/2026Q00785398-P1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/13/2022440746533Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/13/2022440746533Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00785398-I1Open ↗
08/13/2026Q00785398-P1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00785398-P1Open ↗
08/13/2026Q00785398-I1Open ↗
▸BISSTREET TREE CHECKLIST1
10/13/2022440746533Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00785398-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00785398-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00785398-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01009200-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00785417-I1Open ↗
08/13/2026Q00785398-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/16/2023440746533Open ↗
▸BISCURB CUT (CC) SIGNOFF1
11/30/2023440746533Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01009200-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
10/13/2022440746533Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/13/2022440746533Open ↗
▸Other Documents9
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00785398-P1Open ↗
08/13/2026Q00785398-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/24/2026Q00785398-P1Open ↗
08/15/2026Q00785398-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00785398-I1Open ↗
08/13/2026Q00785398-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
10/13/2022440746533Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00785398-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00785398-I1Open ↗