← Back
Two family brick
202-36 46 ROAD
QUEENS · BIN 4552466
💬 Discuss this project
2023Year Built
2.5Stories
B1Building Class
R3XZoning
2,690 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family brick · Owner of record: 202-38 46TH ROAD LLC · 4,000 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
Architecture
Floor 13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FMN REALTY LLC1103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/16/2024$1.8M—— → —$658/sf building
05/26/2022$988K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC206/10/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WINSON CONSTRUCTION INCGeneral Contractor203/21/2026
MPS PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506206/10/2023
Building Lifecycle
All (22)Filed (2)Permit Issued (2)Signed Off (2)Inspection (3)Special Inspection (13)
04/01/2024
Signed off — New Building
PROPOSE A NEW ACCESSORY GARAGE AT REAR YARD. OBTAIN NEW C OF O.
Q08013892-I1
11/29/2023
Signed off — New Building
PROPOSE A NEW ACCESSORY GARAGE AT REAR YARD. OBTAIN NEW C OF O.
Q08013892-S1
11/14/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/08/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
11/03/2023
Permit issued — Plumbing
Q08013892-S1-PL
10/03/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/10/2023
Filed — New Building
PROPOSE A NEW ACCESSORY GARAGE AT REAR YARD. OBTAIN NEW C OF O.
Q08013892-S1
06/10/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
06/10/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
XIAOHONG ZHAO
12/29/2022
Permit issued — General Construction
Q08013892-I1-GC-CX
10/01/2022
Filed — New Building
PROPOSE A NEW ACCESSORY GARAGE AT REAR YARD. OBTAIN NEW C OF O.
Q08013892-I1
10/01/2022
Special inspection requirement — Concrete - Cast-In-Place
XIAOHONG ZHAO
10/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
10/01/2022
Special inspection requirement — Masonry
XIAOHONG ZHAO
10/01/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
10/01/2022
Special inspection requirement — Subgrade Inspections
XIAOHONG ZHAO
10/01/2022
Special inspection requirement — Final
XIAOHONG ZHAO
10/01/2022
Special inspection requirement — Footing and Foundation
XIAOHONG ZHAO
10/01/2022
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
10/01/2022
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
10/01/2022
Special inspection requirement — Electric vehicle service equipment requirements
XIAOHONG ZHAO
10/01/2022
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING IN11/03/2023
DOB NOWGeneral ConstructionPermit IssuedWINSON CONSTRUCTION INC12/29/2022
BIS—ISSUEDWINSON CONSTRUCTION INC11/01/2022
1 project · most recent 06/10/2023
Storm
FiledStatusContractorScope
06/10/2023Signed-offMPS PLUMBING & HEATING INStorm
1 project · most recent 11/16/2023
General Wiring
FiledStatusContractorScope
11/16/2023CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 06/10/2023
FiledStatusContractorScope
06/10/2023Signed-offMPS PLUMBING & HEATING IN1 scope_items
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/14/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/08/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/03/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
06/10/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
06/10/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesXIAOHONG ZHAOspecial
10/01/2022Concrete - Cast-In-PlaceXIAOHONG ZHAOspecial
10/01/2022Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
10/01/2022MasonryXIAOHONG ZHAOspecial
10/01/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
10/01/2022Subgrade InspectionsXIAOHONG ZHAOspecial
10/01/2022FinalXIAOHONG ZHAOprogress
10/01/2022Footing and FoundationXIAOHONG ZHAOprogress
10/01/2022Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
10/01/2022Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
10/01/2022Electric vehicle service equipment requirementsXIAOHONG ZHAOenergy_progress
10/01/2022Interior lighting powerXIAOHONG ZHAOenergy_progress
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026Q08013892-I1Request digital key ↗
08/25/2026Q08013892-S1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/21/2022421809378Open ↗
▸BISWORK PERMIT APPLICATION1
01/10/2023421809378Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q08013892-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08013892-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026Q08013892-I1Open ↗
08/25/2026Q08013892-S1Open ↗
08/25/2026Q08013892-S1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026Q08013892-I1Open ↗
08/25/2026Q08013892-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q08013892-I1Open ↗
08/25/2026Q08013892-I1Open ↗
▸Trade Schedules & Equipment3
▸BISGAS CUT-OFF1
01/10/2023421809378Open ↗
▸BISSEWER CUT-OFF1
01/10/2023421809378Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q08013892-I1Open ↗
▸Safety & Tenant Protection8
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
01/10/2023421809378Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
01/10/2023421809378Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
01/10/2023421809378Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
01/10/2023421809378Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q08013892-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q08013892-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q08013892-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q08013892-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/10/2023421809378Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION4
01/10/2023421809378Open ↗
01/10/2023421809378Open ↗
01/10/2023421809378Open ↗
Showing 3 of 4 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
01/10/2023421809378Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
01/10/2023421809378Open ↗
▸Filing & Intake Forms3
▸BISBOROUGH INTAKE FORM2
01/10/2023421809378Open ↗
06/21/2022421809378Open ↗
▸BISEFILING COVER SHEET1
06/21/2022421809378Open ↗
▸Other Documents5
▸DOB NOWFinal Survey1
08/13/2026Q08013892-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q08013892-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08013892-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/25/2026Q08013892-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q08013892-I1Open ↗