← Back
One story retail building
202-87 ROCKY HILL ROAD
QUEENS · Auburndale · BIN 4125571
💬 Discuss this project
1925Year Built
1Stories
K1Building Class
R3-1Zoning
4,480 sfGross Floor Area
4Units
1 Open Violation ▸FDNY Report ↗
One story retail building · Owner of record: GVA ROCKY HILL ROAD, INC. · 5,965 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneralOther
Floor 18p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GVA ROCKY HILL ROAD INC C103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRIME ZONE BUILDING CONSULTING402/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L CONSTRUCTION DEVELOPGeneral Contractor303/21/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM AND CO CONSULTING LLC8864202/05/2025
Building Lifecycle
All (37)Filed (4)Permit Issued (2)Signed Off (2)Violation (5)Inspection (6)Special Inspection (18)
10/30/2025
Signed off — Alteration
PLUMBING WORK ON FIRST FLOOR OF EXISTING 1 STORY COMMERCIAL BUILDING WITH CELLAR IN CONJUNCTION WITH ALT 2 APPLICATION # Q01145957-I1
Q01145979-I1
09/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/22/2025
Signed off — Alteration
INTERIOR RENOVATION IN EXISTING COMMERCIAL STORE. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION
Q01145957-I1
04/18/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/26/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/14/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JICHEN SUN
02/06/2025
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
02/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
JICHEN SUN
02/06/2025
Special inspection requirement — Fenestration air leakage
JICHEN SUN
02/06/2025
Special inspection requirement — Insulation placement and R values
JICHEN SUN
02/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JICHEN SUN
02/06/2025
Special inspection requirement — Interior lighting power
JICHEN SUN
02/06/2025
Special inspection requirement — Fenestration areas
JICHEN SUN
02/06/2025
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
02/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
JICHEN SUN
02/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
02/06/2025
Special inspection requirement — Maintenance information
JICHEN SUN
02/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
JICHEN SUN
02/05/2025
Filed — Alteration
INTERIOR RENOVATION IN EXISTING COMMERCIAL STORE. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION
Q01145957-P1
02/05/2025
Filed — Alteration
PLUMBING WORK ON FIRST FLOOR OF EXISTING 1 STORY COMMERCIAL BUILDING WITH CELLAR IN CONJUNCTION WITH ALT 2 APPLICATION # Q01145957-I1
Q01145979-P1
02/05/2025
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
02/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
02/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
JICHEN SUN
02/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
JICHEN SUN
02/05/2025
Special inspection requirement — Maintenance information
JICHEN SUN
01/06/2025
Permit issued — Plumbing
Q01145979-I1-PL
12/30/2024
Permit issued — General Construction
Q01145957-I1-GC
11/27/2024
Filed — Alteration
PLUMBING WORK ON FIRST FLOOR OF EXISTING 1 STORY COMMERCIAL BUILDING WITH CELLAR IN CONJUNCTION WITH ALT 2 APPLICATION # Q01145957-I1
Q01145979-I1
11/27/2024
Filed — Alteration
INTERIOR RENOVATION IN EXISTING COMMERCIAL STORE. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION
Q01145957-I1
03/24/2021
Violation issued (ECB, closed)
Construction
10/09/2008
Violation issued (ECB, closed)
Plumbing
04/14/1999
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
04/12/1999
Violation issued (ECB, closed)
Construction
01/07/1997
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC01/06/2025
DOB NOWGeneral ConstructionSigned-offL&L CONSTRUCTION DEVELOP12/30/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/26/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/14/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
02/06/2025Fire-Resistant Penetrations and JointsJICHEN SUNspecial
02/06/2025Energy Code Compliance InspectionsJICHEN SUNprogress
02/06/2025Fire-Resistance Rated ConstructionJICHEN SUNprogress
02/06/2025Fenestration air leakageJICHEN SUNenergy_progress
02/06/2025Insulation placement and R valuesJICHEN SUNenergy_progress
02/06/2025Fenestration and door U-factor and product ratingsJICHEN SUNenergy_progress
02/06/2025Interior lighting powerJICHEN SUNenergy_progress
02/06/2025Fenestration areasJICHEN SUNenergy_progress
02/06/2025Energy Code Compliance InspectionsJICHEN SUNprogress
02/06/2025HVAC-R and service water heating equipmentJICHEN SUNenergy_progress
02/06/2025HVAC-R and service water piping design and insulationJICHEN SUNenergy_progress
02/06/2025Maintenance informationJICHEN SUNenergy_progress
02/06/2025HVAC-R and service water heating system controlsJICHEN SUNenergy_progress
02/05/2025Energy Code Compliance InspectionsJICHEN SUNprogress
02/05/2025HVAC-R and service water piping design and insulationJICHEN SUNenergy_progress
02/05/2025HVAC-R and service water heating system controlsJICHEN SUNenergy_progress
02/05/2025HVAC-R and service water heating equipmentJICHEN SUNenergy_progress
02/05/2025Maintenance informationJICHEN SUNenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026Q01145979-P1Request digital key ↗
08/21/2026Q01145979-I1Request digital key ↗
08/21/2026Q01145957-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature6
09/30/2026Q01145957-I1Open ↗
09/30/2026Q01145957-I1Open ↗
08/24/2026Q01145979-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026Q01145979-P1Open ↗
08/21/2026Q01145979-I1Open ↗
08/21/2026Q01145957-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/30/2026Q01145957-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026Q01145979-I1Open ↗
08/21/2026Q01145979-P1Open ↗
08/21/2026Q01145957-I1Open ↗
Showing 3 of 4 on file for this type