Predominantly retail with other uses
202 BROADWAY
BROOKLYN · BIN 3059548
💬 Discuss this project
1910Year Built
4Stories
K4Building Class
C4-3Zoning
6,560 sfGross Floor Area
4Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · 1,530 sf lot · 4.29 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 13 docs
Floor 33p · 1 filing · 13 docs
Floor 21p · 1 filing · 13 docs
Floor 1
Cellar1p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HART GROUP USA309/01/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VASILIOS ARTEMIOU PE307/09/2026
AG ENGINEERING PLLC107/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)103/21/2026
XPDITE GROUP 103103/21/2026
Building Lifecycle
All (116)Filed (4)Violation (6)Objection (76)Special Inspection (30)
08/20/2026
Objection resolved — Resolved
07/27/2026
Objection resolved — Open
07/16/2026
Objection raised — Cost
07/16/2026
Objection resolved — Resolved
07/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/13/2026
Objection raised — Cost
07/13/2026
Objection raised — Cost
07/09/2026
Filed — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING FOUR STORY + CELLAR COMMERCIAL BUILDING INTO A MIXED-USE BUIDLING WITH SEVEN (7) RESIDENTIAL UNITS
B01260583-S2
07/09/2026
Filed — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING FOUR STORY + CELLAR COMMERCIAL BUILDING INTO A MIXED-USE BUIDLING WITH SEVEN (7) RESIDENTIAL UNITS
B01260583-S4
07/09/2026
Filed — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING FOUR STORY + CELLAR COMMERCIAL BUILDING INTO A MIXED-USE BUIDLING WITH SEVEN (7) RESIDENTIAL UNITS
B01260583-S3
07/06/2026
Special inspection requirement — Sprinkler Systems
07/06/2026
Special inspection requirement — Post-installed Anchors
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/24/2026
Special inspection requirement — Post-installed Anchors
06/24/2026
Special inspection requirement — Energy Code Compliance Inspections
06/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/24/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/24/2026
Special inspection requirement — Maintenance information
06/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/24/2026
Special inspection requirement — Shutoff dampers
06/22/2026
Special inspection requirement — Final
06/22/2026
Special inspection requirement — Mechanical Systems
04/22/2026
Objection resolved — Resolved
04/22/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Special inspection requirement — Air barrier - visual inspection
04/20/2026
Special inspection requirement — Insulation placement and R values
04/20/2026
Special inspection requirement — Lighting controls
04/20/2026
Special inspection requirement — Protection of exposed foundation insulation
04/20/2026
Special inspection requirement — Exterior lighting power
04/06/2026
Objection raised — Scope
04/06/2026
Objection raised — Scope
04/06/2026
Objection raised — Scope
04/06/2026
Objection raised — Zoning
04/06/2026
Objection raised — Other
04/06/2026
Objection raised — Scope
03/19/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/16/2026
Objection resolved — Addressed
03/16/2026
Objection resolved — Addressed
03/16/2026
Objection resolved — Addressed
02/09/2026
Objection resolved — Addressed
02/09/2026
Objection resolved — Addressed
Latest 60 of 116 events.
Nothing on file for this building.
1 project · most recent 07/09/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/09/2026——Heating and Air Conditioning Systems
Heat / Cool
Daikin RXTA24AAVJU 25,000 BTU · Vrf Outdoor ×6
RXTA36AAVJU 37,000 BTU · Vrf Outdoor ×2
1 project · most recent 07/09/2026
Sprinkler System
FiledStatusContractorScope
07/09/2026——Sprinkler System
1 project · most recent 07/09/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/09/2026——Storm, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
07/16/2026Structural Stability – Alterations of existing buildings—special
07/06/2026Sprinkler Systems—special
07/06/2026Post-installed Anchors—special
07/06/2026Fire-Resistant Penetrations and Joints—special
06/24/2026HVAC-R and service water heating system controls—energy_progress
06/24/2026Fire-Resistant Penetrations and Joints—special
06/24/2026Post-installed Anchors—special
06/24/2026Energy Code Compliance Inspections—progress
06/24/2026HVAC-R and service water piping design and insulation—energy_progress
06/24/2026Duct leakage testing, insulation and design—energy_progress
06/24/2026Maintenance information—energy_progress
06/24/2026HVAC-R and service water heating equipment—energy_progress
06/24/2026Shutoff dampers—energy_progress
06/22/2026Final—progress
06/22/2026Mechanical Systems—special
04/20/2026Air barrier - visual inspection—energy_progress
04/20/2026Insulation placement and R values—energy_progress
04/20/2026Lighting controls—energy_progress
04/20/2026Protection of exposed foundation insulation—energy_progress
04/20/2026Exterior lighting power—energy_progress
07/23/2025Fenestration areas—energy_progress
07/23/2025Fire-Resistance Rated Construction—progress
07/23/2025Fire-Resistant Penetrations and Joints—special
07/23/2025Structural Stability – Alterations of existing buildings—special
07/23/2025Energy Code Compliance Inspections—progress
Latest 25 of 32.
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026B01260583-S4Request digital key ↗
08/21/2026B01260583-S2Request digital key ↗
08/21/2026B01260583-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/21/2026B01260583-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026B01260583-S4Open ↗
08/21/2026B01260583-S3Open ↗
08/21/2026B01260583-S2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/21/2026B01260583-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/21/2026B01260583-I1Open ↗