Whole building & multi-floor projectsDelancey Street Associates LLC c/o Taconic Investment Partne2 filings
FILING HEREWITH GENERATOR INSTALLATION IN CONJUNCTION WITH NB #121203937. NO CHANGE IN OCCUPANCY, USE OR EGRESS UNDER THIS APPLICATION.
On file for this project
8 documents · 1 drawing sheet
FILING HEREWITH FUEL OIL TANK INSTALLATION IN CONJUNCTION WITH NB #121203937. NO CHANGE IN OCCUPANCY, USE OR EGRESS UNDER THIS APPLICATION.
On file for this project
6 documents · 1 drawing sheet
RoofUnder Construction1p · 2 filings · 7 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing
PASSIVE RECREATION ROOF TERRACE RENOVATIONS FOR APARTMENT PH3. INSTALL PLANTERS, NEW PAVERS, OUTDOOR GRILLE, SINK, COOKTOP, OUTDOOR SHOWER, SPA, VENTLESS GAS FIRE PLACE AND MOVABLE SHADE FRAME
On file for this project
7 documents · 1 drawing sheet
Project M00258632Permit Issued · 03/31/2021
FILING HEREWITH NEW BOILER INSTALLATION AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
BulkheadNew boiler installation1p · 1 filing · 6 docs
Structural
FILING HEREWITH NEW BOILER INSTALLATION AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Floor 151 filing
GeneralMechanical
Issued Permit Scope
Boiler Equipment · Mechanical Systems
Project M00258632Permit Issued · 03/31/2021
FILING HEREWITH NEW BOILER INSTALLATION AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Floor 14New boiler installation2p · 2 filings · 6 docs
ArchitectureGeneralMechanical
Issued Permit Scope
Boiler Equipment · Mechanical Systems
FILING HEREWITH NEW BOILER INSTALLATION AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
Project M00258632Permit Issued · 03/31/2021
FILING HEREWITH NEW BOILER INSTALLATION AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 61 filing · 2 docs
ArchitectureGeneralMechanical
Issued Permit Scope
Boiler Equipment · Mechanical Systems
No filed description on record for this project.
On file for this project
2 documents
Floor 5Vibecon2p · 2 filings · 6 docs
ArchitectureGeneralMechanical
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems
Install of temp platforms, no alt to exist structures for Vibecon. A TPA is required. Producer is responsible to monitor site safety. All production equipment removed upon event completion
On file for this project
4 documents
No filed description on record for this project.
On file for this project
2 documents · 2 drawing sheets
Floor 4Rosenkranz FoundationUnder Construction1 filing · 20 docs
ArchitectureMechanicalStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Structural
NEW CONCRETE SLAB AND WALLS AT CELLAR LEVEL. NEW STEEL FRAMING AT AUDITORIUM CEILING TO SUPPORT AUDITORIUM EQUIPMENT. NEW STEEL CANTILEVERS TO SUPPORT NEW LED SIGNS AS PER PLANS.
On file for this project
28 documents
Floor 3Rosenkranz FoundationUnder Construction21p · 6 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
NEW CONCRETE SLAB AND WALLS AT CELLAR LEVEL. NEW STEEL FRAMING AT AUDITORIUM CEILING TO SUPPORT AUDITORIUM EQUIPMENT. NEW STEEL CANTILEVERS TO SUPPORT NEW LED SIGNS AS PER PLANS.
On file for this project
28 documents
Plumbing modifications at existing offices.
On file for this project
24 documents · 8 drawing sheets
HEREWITH FILING PLUMBING, SPRINKLER & STANDPIPE WORK FOR FIT OUT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 2Rosenkranz Foundation, Blue Revolver +1Under Construction41p · 25 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Filling herewith plumbing modifications to the existing system as per plans. No change to use, egress or occupancy.
On file for this project
15 documents · 13 drawing sheets
FILING HEREWITH CHANGE OF USE FROM MERCANTILE TO MUSEUM AND ASSOCIATED CONSTRUCTION WORK AS PER PLANS.
On file for this project
4 documents · 1 drawing sheet
NEW CONCRETE SLAB AND WALLS AT CELLAR LEVEL. NEW STEEL FRAMING AT AUDITORIUM CEILING TO SUPPORT AUDITORIUM EQUIPMENT. NEW STEEL CANTILEVERS TO SUPPORT NEW LED SIGNS AS PER PLANS.
On file for this project
28 documents · 6 drawing sheets
Latest 3 of 25 filings on this floor.
Floor 1Rosenkranz Foundation, Chase Bank +1Under Construction25p · 21 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers
FILING HEREWITH CHANGE OF USE FROM MERCANTILE TO MUSEUM AND ASSOCIATED CONSTRUCTION WORK AS PER PLANS.
On file for this project
4 documents · 1 drawing sheet
NEW CONCRETE SLAB AND WALLS AT CELLAR LEVEL. NEW STEEL FRAMING AT AUDITORIUM CEILING TO SUPPORT AUDITORIUM EQUIPMENT. NEW STEEL CANTILEVERS TO SUPPORT NEW LED SIGNS AS PER PLANS.
On file for this project
28 documents · 5 drawing sheets
Tenant fit out for Chase bank. No change to use, egress or occupancy.
On file for this project
13 documents · 4 drawing sheets
Latest 3 of 21 filings on this floor.
CellarRosenkranz Foundation, Chase BankUnder Construction4p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Sprinklers · Structural
NEW CONCRETE SLAB AND WALLS AT CELLAR LEVEL. NEW STEEL FRAMING AT AUDITORIUM CEILING TO SUPPORT AUDITORIUM EQUIPMENT. NEW STEEL CANTILEVERS TO SUPPORT NEW LED SIGNS AS PER PLANS.
On file for this project
28 documents · 1 drawing sheet
Tenant fit out for Chase bank. No change to use, egress or occupancy.
On file for this project
13 documents · 1 drawing sheet
HEREWITH FILING SPRINKLER WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Sub-CellarRosenkranz Foundation, Blue Revolver +2Under Construction15p · 25 filings · 20 docs
ArchitectureCivilElectricalFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
FILING HEREWITH CHANGE OF USE FROM MERCANTILE TO MUSEUM AND ASSOCIATED CONSTRUCTION WORK AS PER PLANS.
On file for this project
4 documents · 2 drawing sheets
NEW CONCRETE SLAB AND WALLS AT CELLAR LEVEL. NEW STEEL FRAMING AT AUDITORIUM CEILING TO SUPPORT AUDITORIUM EQUIPMENT. NEW STEEL CANTILEVERS TO SUPPORT NEW LED SIGNS AS PER PLANS.
On file for this project
28 documents · 9 drawing sheets
Install of temp scenic walls, no alt to exist structures for Simkhai SS26 Fashion Show. TPA required. Producer is responsible to monitor site safety. All production equipment removed upon event completion
On file for this project
2 documents
Latest 3 of 25 filings on this floor.
Site & exteriorChase BankUnder Construction6 filings · 20 docs
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Curb Cut · Sidewalk Shed · Sign · Supported Scaffold
Tenant fit out for Chase bank. No change to use, egress or occupancy.
On file for this project
13 documents · 12 drawing sheets
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Proposed steel faced concrete curb cut 30' wide with (2) 2.5 splays, a total of 35' (NYCDOT H-1015).
On file for this project
2 documents · 4 drawing sheets