← Back
STATEN ISLAND
202 BRYANT AVENUE
STATEN ISLAND · New Dorp-Midland Beach · BIN 5176545
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructural
Floor 23p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Basement4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MONELLO ENTERPRISES1707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT404/10/2025
A TECH ENGINEERING NYC, PLLC.110/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L GASS803/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MONELLO ENTERPRISES INCGeneral Contractor204/09/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738112/14/2023
Building Lifecycle
All (54)Filed (5)Permit Issued (5)Signed Off (3)Inspection (11)Objection (2)Special Inspection (28)
05/19/2025
Signed off — New Building
PPROPOSED DETACHED TWO FAMILY RESIDENCE WITH BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S00969668-S2
04/28/2025
Signed off — New Building
PPROPOSED DETACHED TWO FAMILY RESIDENCE WITH BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S00969668-S1
04/24/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/18/2025
Signed off — Alteration
S01085674-I1
04/15/2025
Permit issued — Curb Cut
S00969668-S1-CC
04/11/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
04/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/10/2025
Filed — New Building
PPROPOSED DETACHED TWO FAMILY RESIDENCE WITH BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S00969668-S1
04/10/2025
Filed — New Building
PPROPOSED DETACHED TWO FAMILY RESIDENCE WITH BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S00969668-P1
04/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/27/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
11/20/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/07/2024
Permit issued — Plumbing
S01085674-I1-PL
10/25/2024
Filed — Alteration
S01085674-I1
09/26/2024
Permit issued — Plumbing
S21535487-S2-PL
08/06/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/24/2024
Permit issued — Plumbing
S00969668-S2-PL
07/08/2024
Filed — New Building
PPROPOSED DETACHED TWO FAMILY RESIDENCE WITH BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S00969668-S2
06/24/2024
Permit issued — Foundation
S00969668-I1-GC-CX
06/18/2024
Objection resolved — Addressed
06/18/2024
Special inspection requirement — Air barrier - visual inspection
anthony santoro
01/23/2024
Objection raised — Scope
12/14/2023
Filed — New Building
PPROPOSED DETACHED TWO FAMILY RESIDENCE WITH BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S00969668-I1
12/14/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
12/14/2023
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
12/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
12/14/2023
Special inspection requirement — Subgrade Inspections
anthony santoro
12/14/2023
Special inspection requirement — Wood – Prefabricated I-Joists
anthony santoro
12/14/2023
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
12/14/2023
Special inspection requirement — Insulation placement and R values
anthony santoro
12/14/2023
Special inspection requirement — Lighting in dwelling units
anthony santoro
12/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
12/14/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/14/2023
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
12/14/2023
Special inspection requirement — Structural Wood Frame
anthony santoro
12/14/2023
Special inspection requirement — Interior lighting power
anthony santoro
12/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
12/14/2023
Special inspection requirement — Permanent certificate
anthony santoro
12/14/2023
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
12/14/2023
Special inspection requirement — Maintenance information
anthony santoro
12/14/2023
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
12/14/2023
Special inspection requirement — Fenestration air leakage
anthony santoro
12/14/2023
Special inspection requirement — Fenestration areas
anthony santoro
12/14/2023
Special inspection requirement — Ventilation and air distribution system
anthony santoro
12/14/2023
Special inspection requirement — Air barrier — testing
anthony santoro
12/14/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
12/14/2023
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
11/30/2023
Special inspection requirement — Footing and Foundation
anthony santoro
11/30/2023
Special inspection requirement — Final
anthony santoro
11/30/2023
Special inspection requirement — Mechanical Systems
anthony santoro
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMONELLO ENTERPRISES INC04/15/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR11/07/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC09/26/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR07/24/2024
DOB NOWFoundationPermit IssuedMONELLO ENTERPRISES INC06/24/2024
1 project · most recent 04/10/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/10/2025Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
1 project · most recent 10/09/2024
General Wiring
FiledStatusContractorScope
10/09/2024CompleteK-10 ELECTRIC CORPGeneral Wiring
1 project · most recent 04/10/2025
Concrete Wood
FiledStatusContractorScope
04/10/2025Signed-offMONELLO ENTERPRISES INCConcrete, Wood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/24/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
04/11/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
04/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/27/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/06/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
06/18/2024Air barrier - visual inspectionanthony santoroenergy_progress
12/14/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
12/14/2023Concrete - Cast-In-Placeanthony santorospecial
12/14/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
12/14/2023Subgrade Inspectionsanthony santorospecial
12/14/2023Wood – Prefabricated I-Joistsanthony santorospecial
12/14/2023HVAC-R and service water heating system controlsanthony santoroenergy_progress
12/14/2023Insulation placement and R valuesanthony santoroenergy_progress
12/14/2023Lighting in dwelling unitsanthony santoroenergy_progress
12/14/2023HVAC-R and service water heating equipmentanthony santoroenergy_progress
12/14/2023Energy Code Compliance Inspectionsanthony santoroprogress
12/14/2023Fire-Resistance Rated Constructionanthony santoroprogress
12/14/2023Structural Wood Frameanthony santoroprogress
12/14/2023Interior lighting poweranthony santoroenergy_progress
12/14/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
12/14/2023Permanent certificateanthony santoroenergy_progress
12/14/2023Duct leakage testing, insulation and designanthony santoroenergy_progress
12/14/2023Maintenance informationanthony santoroenergy_progress
12/14/2023Protection of exposed foundation insulationanthony santoroenergy_progress
12/14/2023Fenestration air leakageanthony santoroenergy_progress
12/14/2023Fenestration areasanthony santoroenergy_progress
12/14/2023Ventilation and air distribution systemanthony santoroenergy_progress
12/14/2023Air barrier — testing anthony santoroenergy_progress
12/14/2023Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
12/14/2023Electric vehicle service equipment requirementsanthony santoroenergy_progress
Latest 25 of 28.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026S01085674-I1Request digital key ↗
08/19/2026S00969668-I1Request digital key ↗
08/19/2026S00969668-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00969668-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00969668-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00969668-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026S01085674-I1Open ↗
08/19/2026S00969668-I1Open ↗
08/19/2026S00969668-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/25/2026S00969668-I1Open ↗
09/25/2026S00969668-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/25/2026S00969668-I1Open ↗
09/25/2026S00969668-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00969668-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00969668-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00969668-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00969668-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00969668-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00969668-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00969668-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00969668-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/19/2026S00969668-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00969668-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00969668-I1Open ↗