← Back
Multi-story retail building (2+)
202 CONOVER STREET
BROOKLYN · BIN 3426136
💬 Discuss this project
2019Year Built
2Stories
K2Building Class
M2-1Zoning
4,153 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Multi-story retail building (2+) · Owner of record: 202 CONOVER STREET LLC · 2,500 sf lot · 1.66 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalMechanical
Roof3p · 1 filing · 4 docs
Cellar1p · 1 filing · 9 docs
2 jobs · most recent 06/26/2023
General Wiring
FiledStatusContractorScope
06/26/2023CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
06/25/2018CompleteV. VASS ELECTRIC CORP—
Building Lifecycle
All (38)Filed (8)Permit Issued (9)Signed Off (5)Violation (10)Inspection (1)Special Inspection (5)
05/13/2026
Signed off — Alteration
TEMPORARY ROOF/OVERHEAD PROTECTION DURING NB CONSTRUCTION AT THE ADJOINING PROPERTY (176 DIKEMAN ST), FILED SEP. TEMPORARY ROOF/OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01343330-I1
04/20/2026
Filed — Alteration
TEMPORARY ROOF/OVERHEAD PROTECTION DURING NB CONSTRUCTION AT THE ADJOINING PROPERTY (176 DIKEMAN ST), FILED SEP. TEMPORARY ROOF/OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01343330-P1
04/14/2026
Permit issued — Protection and Mechanical Methods
B01343330-I1-PMM
04/13/2026
Filed — Alteration
TEMPORARY ROOF/OVERHEAD PROTECTION DURING NB CONSTRUCTION AT THE ADJOINING PROPERTY (176 DIKEMAN ST), FILED SEP. TEMPORARY ROOF/OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01343330-I1
08/12/2025
Signed off — Alteration
Install Boiler and equipment as needed. No Change to egress, occupancy or use.
B00398653-I1
12/20/2022
Signed off — Alteration
B00041326-I1
08/30/2022
Filed — Alteration
Install Boiler and equipment as needed. No Change to egress, occupancy or use.
B00398653-P1
08/19/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/19/2022
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Thomas Barry
08/19/2022
Special inspection requirement — Heating Systems
WAYNE CLARKE
08/19/2022
Special inspection requirement — HVAC and service water heating system controls
WAYNE CLARKE
08/19/2022
Special inspection requirement — Maintenance information
WAYNE CLARKE
08/19/2022
Special inspection requirement — HVAC and service water heating equipment
WAYNE CLARKE
06/23/2022
Permit issued — Boiler Equipment
B00398653-I1-BE
11/30/2021
Signed off — Alteration
B00055475-I1
10/18/2021
Filed — Alteration
Install Boiler and equipment as needed. No Change to egress, occupancy or use.
B00398653-I1
05/10/2021
Permit issued — Construction Fence
B00041326-I1-FN
07/31/2020
Signed off — Alteration
B00089780-I1
10/02/2019
Violation issued (ECB, closed)
Construction
10/02/2019
Violation issued (ECB, closed)
Construction
10/02/2019
Violation issued (ECB, closed)
Construction
09/27/2019
Permit issued — Construction Fence
B00041326-I1-FN
08/19/2019
Violation issued (ECB, closed)
Construction
07/29/2019
Filed — No Work
B00174129-I1
07/15/2019
Violation issued (ECB, closed)
Construction
07/15/2019
Violation issued (ECB, closed)
Construction
05/03/2019
Violation issued (ECB, closed)
Construction
05/03/2019
Violation issued (ECB, closed)
Site Safety
05/03/2019
Violation issued (ECB, closed)
Construction
05/03/2019
Violation issued (ECB, closed)
Construction
03/29/2019
Permit issued — Sidewalk Shed
B00055475-I1-SH
10/18/2018
Filed — Alteration
B00089780-I1
10/18/2018
Permit issued — Supported Scaffold
B00089780-I1-SF
08/01/2018
Permit issued — Sidewalk Shed
B00055475-I1-SH
06/26/2018
Filed — Alteration
B00055475-I1
06/26/2018
Permit issued — Sidewalk Shed
B00055475-I1-SH
05/10/2018
Filed — Alteration
B00041326-I1
05/10/2018
Permit issued — Construction Fence
B00041326-I1-FN
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW AMERICAN CONSTRUCTION INC503/22/2026
202 CONOVER ST1303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/23/2017$1.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL PERDEK, PROF. ENG. PLLC204/20/2026
THOMAS BARRY ARCHITECT408/30/2022
GREEN DESIGN110/18/2018
PATUXENT ENGINEERING LLC106/26/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PRO EXPEDITING203/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
PATUXENT ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW AMSTERDAM BUILDING SOGeneral Contractor707/08/2026
SILVERCUP SCFFLDNG I LLCGeneral Contractor507/08/2026
JOHN EVAN CONTRACTING CORGeneral Contractor503/22/2026
NEW AMERICAN CONSTRUCTION INCGeneral Contractor303/21/2026
AAA TOTAL PLUMBINGGeneral Contractor103/22/2026
ARSENAL SCAFFOLD INCGeneral Contractor107/08/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WGC SOLUTIONS4673108/30/2022
OPERA STUDIO ARCHITECTURE5970110/18/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsSigned-offARSENAL SCAFFOLD INC04/14/2026
DOB NOWBoiler EquipmentSigned-offJVR PLBG AND HEATING INC06/23/2022
DOB NOWConstruction FenceSigned-offNEW AMSTERDAM BUILDING SO05/10/2021
DOB NOWConstruction FenceSigned-offNEW AMSTERDAM BUILDING SO09/27/2019
DOB NOWSidewalk ShedSigned-offSILVERCUP SCFFLDNG I LLC03/29/2019
DOB NOWSupported ScaffoldSigned-offNEW AMERICAN CONSTRUCTION10/18/2018
DOB NOWSidewalk ShedSigned-offSILVERCUP SCFFLDNG I LLC08/01/2018
DOB NOWSidewalk ShedSigned-offSILVERCUP SCFFLDNG I LLC06/26/2018
DOB NOWConstruction FenceSigned-offNEW AMSTERDAM BUILDING SO05/10/2018
BIS—ISSUEDJOHN EVAN CONTRACTING COR01/27/2025
BISPLISSUEDAAA TOTAL PLUMBING, INC11/02/2023
BISPLISSUEDPLUMB-IT MECHANICAL INC05/10/2023
BIS—ISSUEDDAVID CONSTRUCTING NY, IN06/08/2022
BIS—ISSUEDDAVID CONSTRUCTING NY, IN03/31/2022
BIS—ISSUEDSUPERB CONSTRUCTION MGT01/19/2022
BISPLISSUEDPLUMB-IT MECHANICAL INC09/02/2021
BIS—ISSUEDSUPERB CONSTRUCTION MGT08/30/2021
BIS—ISSUEDSUPERB CONSTRUCTION MGT09/15/2020
BISPLISSUEDPLUMB-IT MECHANICAL INC09/23/2019
BISOTISSUEDNEW AMSTERDAM BUILDING SO09/14/2018
BIS—ISSUEDNEW AMSTERDAM BUILDING SO09/14/2018
BISPLISSUEDRITE WAY PLUMBING & HEATING08/22/2018
BISPLISSUEDROM PIPING & HTG INC08/07/2018
BIS—ISSUEDNEW AMSTERDAM BUILDING SO06/26/2018
BIS—ISSUEDNEW AMSTERDAM BUILDING SO06/26/2018
BISEQISSUEDNEW AMSTERDAM BUILDING SO06/26/2018
BISOTISSUEDNEW AMSTERDAM BUILDING SO06/26/2018
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/19/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/19/2022Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Thomas Barryspecial
08/19/2022Heating SystemsWAYNE CLARKEspecial
08/19/2022HVAC and service water heating system controls WAYNE CLARKEenergy_progress
08/19/2022Maintenance informationWAYNE CLARKEenergy_progress
08/19/2022HVAC and service water heating equipment WAYNE CLARKEenergy_progress
▾Documents — 253 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch5
09/03/2026B00041326-I1Request digital key ↗
09/03/2026B00055475-I1Request digital key ↗
09/02/2026B00089780-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/01/2026B00398653-I1Request digital key ↗
08/15/2026B00398653-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
09/02/2026B00174129-I1Request digital key ↗
▸Applications & Permits50
▸BISPLAN / WORK APPROVAL APPLICATION32
12/16/2025321615935Open ↗
12/03/2025321615935Open ↗
05/28/2025321615935Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION15
02/06/2025321615935Open ↗
11/03/2023321615935Open ↗
08/28/2020321615935Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
09/06/2019321615935Open ↗
08/15/2019321615935Open ↗
02/21/2019321615935Open ↗
▸Zoning, Tax Lot & Property Records11
▸BISZONING EXHIBIT I: CERTIFICATION3
05/03/2018321719725Open ↗
Showing 1 of 3 on file for this type
▸BISZONING DIAGRAM2
11/19/2020321615935Open ↗
05/14/2018321615935Open ↗
▸BISZONING RESOLUTION DETERMINATION2
01/10/2020321615935Open ↗
01/10/2020321615935Open ↗
▸BISVERIFY TAX LOT1
11/22/2022321615935Open ↗
▸BISFLOOD ZONE COMPLIANCE1
12/14/2022321615935Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/03/2018321615935Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/22/2022321615935Open ↗
▸Seals & Professional Certifications28
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
11/15/2021321615935Open ↗
11/15/2021321615935Open ↗
06/27/2018321615935Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026B00041326-I1Open ↗
09/03/2026B00055475-I1Open ↗
09/02/2026B00089780-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00398653-P1Open ↗
09/01/2026B00398653-P1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B00398653-P1Open ↗
▸Trade Schedules & Equipment19
▸BISSCHEDULE B - PLUMBING7
02/27/2024321615935Open ↗
02/08/2024321615935Open ↗
04/04/2022321615935Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS4
03/16/2023321615935Open ↗
03/15/2023321615935Open ↗
03/15/2023321615935Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
09/18/2019321615935Open ↗
09/14/2019321615935Open ↗
Showing 2 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
01/09/2023321615935Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/18/2023321615935Open ↗
▸BISSPRINKLER SYSTEMS1
11/09/2021321615935Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/14/2026321615935Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
02/14/2026321615935Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST4
01/06/2022321742735Open ↗
09/19/2019321615935Open ↗
05/03/2018321615935Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE SIGNOFF2
11/30/2022321615935Open ↗
11/30/2022321742735Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/30/2022321742735Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
06/22/2018321615935Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
12/23/2019321615935Open ↗
06/22/2018321615935Open ↗
06/22/2018321615935Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/13/2026321615935Open ↗
02/02/2026321615935Open ↗
▸BIS* DUCT LEAKAGE TESTING1
01/18/2023321615935Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/18/2023321615935Open ↗
▸BISFENESTRATION AREAS1
01/18/2023321615935Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
03/01/2023321615935Open ↗
▸BISEMERGENCY LIGHTING - PA1
01/18/2023321615935Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/01/2023321615935Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/03/2023321615935Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00398653-I1Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY7
02/13/2026321615935Open ↗
12/14/2022321615935Open ↗
12/14/2022321615935Open ↗
Showing 3 of 7 on file for this type
▸BISSOIL REPORT2
06/27/2018321615935Open ↗
03/22/2018321615935Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
03/11/2025321615935Open ↗
06/27/2018321615935Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/14/2022321615935Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/01/2023321615935Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/14/2022321615935Open ↗
▸BISPOST-INSTALLED ANCHORS1
12/14/2022321615935Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
12/14/2022321615935Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE5
12/03/2025321615935Open ↗
07/31/2019321615935Open ↗
03/19/2019321615935Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER3
02/06/2025321615935Open ↗
08/28/2020321615935Open ↗
08/23/2018321615935Open ↗
▸Cost, Insurance & Ownership14
▸BISPROJECT-SPECIFIC GL INSURANCE5
02/06/2025321615935Open ↗
10/01/2019321615935Open ↗
09/17/2018321615935Open ↗
Showing 3 of 5 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)4
02/06/2025321615935Open ↗
09/17/2018321615935Open ↗
09/17/2018321719725Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT4
06/13/2022321719725Open ↗
04/06/2018321719725Open ↗
Showing 2 of 4 on file for this type
▸BISSTEEL AFFIDAVIT- FINAL1
11/30/2022321615935Open ↗
▸Filing & Intake Forms26
▸BISADDITIONAL INFORMATION21
12/17/2025321615935Open ↗
06/17/2025321615935Open ↗
03/12/2025321615935Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING COVER SHEET5
04/16/2018321742735Open ↗
04/06/2018321719725Open ↗
Showing 2 of 5 on file for this type
▸Other Documents13
▸BISPLOT DIAGRAM2
05/03/2018321615935Open ↗
Showing 1 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/22/2018321615935Open ↗
05/03/2018321615935Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)2
01/04/2023321615935Open ↗
08/30/2022321719725Open ↗
▸BISLOWEST FLOOR ELEVATION1
12/27/2022321615935Open ↗
▸BISVESTIBULES1
04/03/2023321615935Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
12/14/2022321615935Open ↗
▸BISMAINTENANCE INFORMATION1
01/18/2023321615935Open ↗
▸BISPERMANENT CERTIFICATE1
01/18/2023321615935Open ↗
▸BISVIOLATIONS SEARCH1
12/19/2022321615935Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026B00398653-I1Open ↗