← Back
Walk-up apt, over six families with stores
202 EAST 6 STREET
MANHATTAN · East Village · BIN 1006611
💬 Discuss this project
1930Year Built
6Stories
C7Building Class
C6-1Zoning
14,075 sfGross Floor Area
19Units
Rent Stabilized1 Open Violation ▸
Walk-up apt, over six families with stores · Owner of record: 202 EAST 6TH STREET LLC · 3,946 sf lot · 3.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Floor 113p · 3 filings · 13 docs
Cellar5p · 3 filings · 19 docs
Filed — no permit issued6p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HKS CONSTRUCTION807/08/2026
202 EAST 6TH STREET LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BODNAR ARCHITECT PC507/17/2026
BLUE SKY DESIGN, INC.108/25/2021
ENTHINK ENGINEERS LLC210/02/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN403/21/2026
BODNAR ARCHITECTURE P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HKS CONSTRUCTION CORPGeneral Contractor407/08/2026
JBUILD LLCGeneral Contractor303/21/2026
BODIA INCGeneral Contractor203/21/2026
WATER DYNAMIC P & H CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COLBERG ARCHITECTURE7683107/17/2026
BLUE SKY DESIGN, INC.1908108/25/2021
Building Lifecycle
All (95)Filed (8)Permit Issued (5)Signed Off (4)Violation (60)Inspection (2)Objection (4)Special Inspection (12)
07/17/2026
Filed — Alteration
Installation of fire rated metal covered lockable doors into opening of abandoned existing dumbwaiter shaft as required to secure same in public hallways on 1-6 floors. No change in occupancy, use or egress.
M01431640-I1
07/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
Eugene Colberg
07/16/2026
Special inspection requirement — Final
Theodore Bodnar
05/08/2024
Signed off — Alteration
Removal of plumbing fixtures and same in front and rear cellar spaces. No change in occupancy use or egress.
M00771851-I1
02/27/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/27/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/13/2024
Permit issued — Plumbing
M00771851-I1-PL
02/12/2024
Violation issued (ECB, closed)
Construction
02/12/2024
Violation issued (ECB, closed)
Construction
12/13/2023
Violation issued (ECB, closed)
Construction
12/13/2023
Violation issued (ECB, closed)
Construction
12/13/2023
Violation issued (ECB, closed)
Construction
07/27/2023
Filed — Alteration
Removal of interior non-load bearing partitions, wall, ceiling and floor finishes. No change in occupancy use or egress.
M00771652-P2
01/30/2023
Filed — Alteration
Removal of interior non-load bearing partitions, wall, ceiling and floor finishes. No change in occupancy use or egress.
M00771652-P1
01/27/2023
Special inspection requirement — Final
Theodore Bodnar
11/02/2022
Violation issued (HPD, closed)
I
10/11/2022
Permit issued — General Construction
M00771652-I1-GC
08/12/2022
Signed off — Alteration
Removal and replacement of existing steel stairs and platform from CEL to First Floor in interior court. No Change in Occupancy or Use.
M00583353-I1
07/25/2022
Filed — Alteration
Removal of plumbing fixtures and same in front and rear cellar spaces. No change in occupancy use or egress.
M00771851-I1
07/25/2022
Filed — Alteration
Removal of interior non-load bearing partitions, wall, ceiling and floor finishes. No change in occupancy use or egress.
M00771652-I1
02/23/2022
Permit issued — Structural
M00583353-I1-ST
02/15/2022
Violation issued (HPD, closed)
I
02/15/2022
Violation issued (HPD, closed)
A
12/09/2021
Objection resolved — Addressed
12/09/2021
Objection resolved — Addressed
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/30/2021
Objection raised — Fire_Protection
08/27/2021
Objection raised — Scope
08/25/2021
Filed — Alteration
Removal and replacement of existing steel stairs and platform from CEL to First Floor in interior court. No Change in Occupancy or Use.
M00583353-I1
08/25/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANDREW RENFROE
08/25/2021
Special inspection requirement — Structural Steel - High Strength Bolting
ANDREW RENFROE
08/25/2021
Special inspection requirement — Structural Steel - Welding
ANDREW RENFROE
08/25/2021
Special inspection requirement — Structural Cold-Formed Steel
ANDREW RENFROE
08/25/2021
Special inspection requirement — Final
ANDREW RENFROE
08/25/2021
Special inspection requirement — Structural Steel - Details
ANDREW RENFROE
08/25/2021
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREW RENFROE
08/25/2021
Special inspection requirement — Post-installed Anchors
ANDREW RENFROE
08/03/2021
Violation issued (ECB, closed)
Construction
06/18/2021
Violation issued (ECB, closed)
Construction
06/18/2021
Violation issued (ECB, closed)
Construction
06/18/2021
Violation issued (ECB, closed)
Plumbing
06/18/2021
Violation issued (ECB, closed)
Unknown
06/18/2021
Violation issued (ECB, closed)
Unknown
04/05/2021
Violation issued (ECB, closed)
Construction
04/05/2021
Violation issued (ECB, closed)
Construction
03/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/12/2021
Violation issued (ECB, closed)
Construction
02/12/2021
Violation issued (ECB, closed)
Construction
12/01/2020
Violation issued (ECB, closed)
Construction
12/01/2020
Violation issued (ECB, closed)
Construction
09/28/2020
Violation issued (ECB, closed)
Construction
09/28/2020
Violation issued (ECB, closed)
Construction
09/11/2020
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00237616-I1
09/10/2020
Signed off — Alteration
M00237624-I1
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/05/2020
Violation issued (HPD, closed)
B
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHYDRO PLBG & HTG CORP02/13/2024
DOB NOWGeneral ConstructionPermit IssuedBODIA10/11/2022
DOB NOWStructuralSigned-offJBUILD LLC02/23/2022
DOB NOWSidewalk ShedSigned-offHKS CONSTRUCTION CORP10/02/2019
DOB NOWSupported ScaffoldSigned-offHKS CONSTRUCTION CORP10/02/2019
BISOTISSUEDBODIA INC11/01/2013
BISOTISSUEDBODIA INC01/11/2013
BISOTISSUEDBODIA INC10/05/2012
BISOTISSUEDBODIA INC09/01/2010
BISOTISSUEDRAMAPO COMMUNICATION CORP06/25/2010
BISOTISSUEDBODIA INC05/07/2010
BISOTISSUEDBODIA INC09/25/2009
BISOTISSUEDBCI COMMUNICATIONS INC01/20/2009
BISOTISSUEDBCI CPMMUNICATION INC03/05/2008
BISBLISSUEDUNFLAT & ASSOCIATES INC02/22/2008
BISPLISSUEDUNFLAT & ASSOCIATES INC02/22/2008
BISOTISSUEDBODIA INC06/06/2007
BISOTISSUEDTEMAX CONSTRUCTION02/03/1999
BISOTISSUEDTEMAX CONSTRUCTION02/12/1998
8 projects · most recent 12/14/2022
General Wiring
FiledStatusContractorScope
12/14/2022CompleteTRIZA ELECTRICAL CORPGeneral Wiring
12/14/2022CompleteTRIZA ELECTRICAL CORPGeneral Wiring
10/25/2022CompleteTRIZA ELECTRICAL CORPGeneral Wiring
08/15/2022CompleteTRIZA ELECTRICAL CORP—
07/19/2021Permit IssuedENTERPRISE ELEC'L SYSTEMSGeneral Wiring
02/24/2021CompleteENTERPRISE ELEC'L SYSTEMSGeneral Wiring
10/17/2019CompleteWCK ELECTRIC CORP.—
09/30/2019CancelledRICHARD NEU—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/27/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/16/2026Tenant Protection Plan ComplianceEugene Colbergspecial
07/16/2026FinalTheodore Bodnarprogress
01/27/2023FinalTheodore Bodnarprogress
08/25/2021Structural Stability – Alterations of existing buildingsANDREW RENFROEspecial
08/25/2021Structural Steel - High Strength BoltingANDREW RENFROEspecial
08/25/2021Structural Steel - WeldingANDREW RENFROEspecial
08/25/2021Structural Cold-Formed SteelANDREW RENFROEspecial
08/25/2021FinalANDREW RENFROEprogress
08/25/2021Structural Steel - DetailsANDREW RENFROEspecial
08/25/2021Alternative Materials - OTCR Buildings Bulletin NumberANDREW RENFROEspecial
08/25/2021Post-installed AnchorsANDREW RENFROEspecial
09/30/2019FinalSunil Saigalprogress
▾Documents — 105 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch6
09/02/2026M00771851-I1Request digital key ↗
08/29/2026M00771652-P1Request digital key ↗
08/29/2026M00771652-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00237616-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00237624-I1Request digital key ↗
▸Applications & Permits21
▸BISWORK PERMIT APPLICATION12
12/06/2013121824945Open ↗
11/04/2013121824945Open ↗
10/09/2012121377642Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
11/05/2013121824945Open ↗
10/09/2012121377642Open ↗
08/19/2010120445214Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications28
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
11/05/2013121824945Open ↗
10/09/2012121377642Open ↗
09/08/2011110284237Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/05/2026M00237624-I1Open ↗
09/03/2026M00583353-I1Open ↗
09/02/2026M00771851-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M00237616-I1Open ↗
08/28/2026M00583353-I1Open ↗
08/28/2026M01431640-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026M00583353-I1Open ↗
08/28/2026M00583353-I1Open ↗
08/28/2026M01431640-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/20/2008110102139Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/20/2008110102139Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING3
05/07/2010120335360Open ↗
07/12/2008110230330Open ↗
02/20/2008110102139Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
02/20/2008110102139Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/13/2026M00237616-I1Open ↗
08/13/2026M00237624-I1Open ↗
▸Environmental & Asbestos15
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
08/19/2010120445214Open ↗
05/07/2010120335360Open ↗
09/22/2009120159363Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/02/2026M00771851-I1Open ↗
08/29/2026M00771652-P1Open ↗
08/29/2026M00771652-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/05/2013121824945Open ↗
10/09/2012121377642Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/05/2013121824945Open ↗
10/09/2012121377642Open ↗
▸Inspections & Test Reports1
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
02/20/2008110102139Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS6
10/09/2012121377642Open ↗
05/07/2010120335360Open ↗
09/22/2009120159363Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/08/2011110284237Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT10
11/05/2013121824945Open ↗
10/09/2012121377642Open ↗
09/08/2011110284237Open ↗
Showing 3 of 10 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
09/25/2009120159363Open ↗
09/25/2009120159363Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET4
11/05/2013121824945Open ↗
10/09/2012121377642Open ↗
08/19/2010120445214Open ↗
Showing 3 of 4 on file for this type
▸BISeFiling Job Application Cover Sheet1
05/07/2010120335360Open ↗