Walk-up apt, over six families with stores
Williamsburg Houses
202 GRAHAM AVENUE · East Williamsburg · BIN 3327888
💬 Discuss this project
1938Year Built
4Stories
C7Building Class
R6Zoning
345,248 sfGross Floor Area
486Units
LL97 CoveredRent Stabilized1 Open Violation ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: WILLIAMSBURG PACT LLC · 283,200 sf lot · 1.22 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivil
Roof5p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 14 docs
Floor 11p · 1 filing · 16 docs
Cellar3p · 3 filings · 20 docs
Basement1p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YARKS NYC INC503/22/2026
WILLIAMSBURG PACT LLC WAV103/22/2026
NYC HOUSING AUTHORITY2103/22/2026
MDG DESIGN CONSTR103/22/2026
NYCHA103/21/2026
NYC HOUSING AUTH303/21/2026
MDG DESIGN + CONSTRUCTION103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DIBARI ENGINEERING, P.C.709/10/2024
JOEL PHAGOO P.E. PLLC106/09/2023
NEWMAN DESIGN ARCHITECTS PLLC305/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CHARIS CONSULTING1203/21/2026
WILLIAM VITACCO ASSOCIATES603/21/2026
DVA Advisors103/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRADELINE PLUMBING INCPlumbing507/08/2026
SNS ORGNIZATION LTDGeneral Contractor407/08/2026
YARKS NYC INCGeneral Contractor303/21/2026
ZONE PLUMBING & HEATING CPlumbing307/08/2026
MDG DESIGN & CONSTR LLCGeneral Contractor207/08/2026
KTB ELECTRIC INC.Electrical203/22/2026
A1 EXPEDITING SERVICE CORElectrical103/21/2026
KTB ELECTRIC INC 003305General Contractor103/22/2026
MIGUEL HAMILTONElectrical103/21/2026
JEMCO ELECT. CONTRS INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LORJAN AGALLIU ARCHITECT6104909/10/2024
Building Lifecycle
All (108)Filed (11)Permit Issued (10)Signed Off (7)Violation (44)Inspection (4)Objection (10)Special Inspection (22)
10/01/2025
Violation issued (ECB, closed)
Boilers
03/14/2025
Signed off — Alteration
New 30' wide curb cut to access trash enclosure.
B00678242-I1
02/27/2025
Signed off — Alteration
Replacement of boilers & associated ducts/piping as shown on drawings. No change in use, egress, or occupancy.
B00479261-I1
11/09/2024
Violation issued (HPD, closed)
B
11/09/2024
Violation issued (HPD, closed)
B
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/18/2024
Signed off — Alteration
All plumbing work in tank room of boiler room associated plumbing piping (Domestic Hot & Cold Valves) install (3) new Turbo Max, (2) HWCP (Hot Water Circulating Pumps), Mixing Valves (TMV1 & TMV2) & Water submeter. No change in use, egress / occupancy.
B00727252-I1
09/10/2024
Filed — Alteration
Replacement of boilers & associated ducts/piping as shown on drawings. No change in use, egress, or occupancy.
B00479261-P1
09/10/2024
Special inspection requirement — Maintenance information
lorjan agalliu
09/10/2024
Special inspection requirement — Heating Systems
lorjan agalliu
09/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
lorjan agalliu
09/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
lorjan agalliu
08/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
lorjan agalliu
08/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
lorjan agalliu
08/28/2024
Special inspection requirement — Maintenance information
lorjan agalliu
08/28/2024
Special inspection requirement — Heating Systems
lorjan agalliu
08/23/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/19/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/02/2024
Signed off — Alteration
B00493454-I1
05/14/2024
Signed off — Alteration
B00492698-I1
05/07/2024
Permit issued — Curb Cut
B00678242-I1-CC
04/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
03/27/2024
Filed — Alteration
B00493454-P3
03/26/2024
Signed off — Alteration
B00491962-I1
03/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
02/28/2024
Violation issued (ECB, closed)
Construction
02/15/2024
Signed off — Alteration
B00849789-I1
02/02/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/22/2024
Permit issued — Plumbing
B00727252-I1-PL
01/08/2024
Permit issued — Plumbing
B00493454-I1-PL
01/02/2024
Permit issued — Mechanical Systems
B00492698-I1-MS
10/17/2023
Objection resolved — Addressed
09/20/2023
Objection resolved — Addressed
09/20/2023
Objection resolved — Addressed
09/18/2023
Permit issued — Mechanical Systems
B00492698-I1-MS
08/08/2023
Permit issued — General Construction
B00491962-I1-GC
07/26/2023
Filed — Alteration
All plumbing work in tank room of boiler room associated plumbing piping (Domestic Hot & Cold Valves) install (3) new Turbo Max, (2) HWCP (Hot Water Circulating Pumps), Mixing Valves (TMV1 & TMV2) & Water submeter. No change in use, egress / occupancy.
B00727252-I1
06/29/2023
Permit issued — Boiler Equipment
B00479261-I1-BE
06/09/2023
Filed — Alteration
B00849789-I1
06/09/2023
Permit issued — Sidewalk Shed
B00849789-I1-SH
06/06/2023
Objection resolved — Addressed
05/15/2023
Objection raised — Other
05/10/2023
Special inspection requirement — Final
lorjan agalliu
05/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
05/10/2023
Special inspection requirement — Masonry
lorjan agalliu
05/10/2023
Special inspection requirement — Fire-Resistance Rated Construction
lorjan agalliu
05/10/2023
Special inspection requirement — Energy Code Compliance Inspections
lorjan agalliu
05/10/2023
Special inspection requirement — Exterior lighting power
lorjan agalliu
05/10/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
lorjan agalliu
05/10/2023
Special inspection requirement — Lighting controls
lorjan agalliu
05/10/2023
Special inspection requirement — Lighting in dwelling units
lorjan agalliu
05/10/2023
Special inspection requirement — Interior lighting power
lorjan agalliu
05/09/2023
Filed — Alteration
B00491962-P1
03/09/2023
Special inspection requirement — Tenant Protection Plan Compliance
lorjan agalliu
02/28/2023
Objection resolved — Addressed
12/27/2022
Objection raised — Other
12/27/2022
Objection raised — Scope
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMDG DESIGN & CONSTR LLC05/07/2024
DOB NOWPlumbingSigned-offTRADELINE PLUMBING INC01/22/2024
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C01/08/2024
DOB NOWMechanical SystemsSigned-offSNS ORGNIZATION LTD01/02/2024
DOB NOWMechanical SystemsSigned-offSNS ORGNIZATION LTD09/18/2023
DOB NOWGeneral ConstructionSigned-offMDG DESIGN & CONSTR LLC08/08/2023
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ06/29/2023
DOB NOWSidewalk ShedSigned-offYARKS NYC INC06/09/2023
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ12/14/2022
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ07/07/2022
BISEQISSUEDUTB-UNITED TECHNOLOGY INC12/21/2006
BISEQISSUEDUTB-UNITED TECHNOLOGY INC09/27/2006
BISOTISSUEDUTB-UNITED TECHNOLOGY INC06/13/2006
BISFSISSUEDJACK PICCINI, INC03/09/2006
BISPLISSUEDRAYTONE PLUMBING SPEC, INC03/02/2006
BISOTISSUEDUTB-UNITED TECHNOLOGY INC12/28/2005
BISBLISSUEDDOUGLAS SIMMONS10/21/2005
BISFBISSUEDDOUGLAS SIMMONS10/21/2005
BISPLISSUEDNY PLUMBING & SPKLER CORP02/15/2005
BISSPISSUEDV. C. VITANZA SONS INC04/16/2003
BISFBISSUEDMARIC PLBG & HTG INC05/03/2002
BISFBISSUEDDOUGLAS SIMMONS05/04/1999
BISPLISSUEDNY PLUMBING & SPKLER CORP04/30/1999
BISBLISSUEDMARIC MECHANICAL INC04/19/1999
BISFBISSUEDB.G. NATIONAL PLUMBING & HEATING02/03/1995
BISPLISSUEDB.G. NATIONAL PLUMBING & HEATING02/03/1995
6 projects · most recent 07/20/2026
General Wiring
FiledStatusContractorScope
07/20/2026CompleteDELCO ELECTRICAL CORP.General Wiring
07/20/2026CompleteDELCO ELECTRICAL CORP.General Wiring
10/29/2025CompleteKTB ELECTRIC INC.General Wiring
10/29/2025CompleteKTB ELECTRIC INC.General Wiring
01/16/2024CompleteDELCO ELECTRICAL CORP.General Wiring
10/09/2020CompleteJEMCO ELECT. CONTRS INC—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/23/2024Pass-Final Boiler Equipment InspectionPassView ↗
08/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/02/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
09/10/2024Maintenance informationlorjan agalliuenergy_progress
09/10/2024Heating Systemslorjan agalliuspecial
09/10/2024HVAC-R and service water heating equipmentlorjan agalliuenergy_progress
09/10/2024HVAC-R and service water heating system controlslorjan agalliuenergy_progress
08/28/2024HVAC-R and service water heating system controlslorjan agalliuenergy_progress
08/28/2024HVAC-R and service water heating equipmentlorjan agalliuenergy_progress
08/28/2024Maintenance informationlorjan agalliuenergy_progress
08/28/2024Heating Systemslorjan agalliuspecial
04/03/2024Fire-Resistant Penetrations and Jointslorjan agalliuspecial
03/13/2024Fire-Resistant Penetrations and Jointslorjan agalliuspecial
05/10/2023Finallorjan agalliuprogress
05/10/2023Fire-Resistant Penetrations and Jointslorjan agalliuspecial
05/10/2023Masonrylorjan agalliuspecial
05/10/2023Fire-Resistance Rated Constructionlorjan agalliuprogress
05/10/2023Energy Code Compliance Inspectionslorjan agalliuprogress
05/10/2023Exterior lighting powerlorjan agalliuenergy_progress
05/10/2023Fenestration and door U-factor and product ratingslorjan agalliuenergy_progress
05/10/2023Lighting controlslorjan agalliuenergy_progress
05/10/2023Lighting in dwelling unitslorjan agalliuenergy_progress
05/10/2023Interior lighting powerlorjan agalliuenergy_progress
03/09/2023Tenant Protection Plan Compliancelorjan agalliuspecial
07/08/2022Fire-Resistant Penetrations and Jointslorjan agalliuspecial
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/31/2026B00492698-I1Request digital key ↗
08/31/2026B00493454-P3Request digital key ↗
08/31/2026B00493454-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit8
08/13/2026B00727252-I1Open ↗
08/13/2026B00492698-I1Open ↗
08/13/2026B00491962-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
02/05/2021302223038Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/31/2026B00492698-I1Open ↗
08/31/2026B00493454-P3Open ↗
08/31/2026B00493454-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B00479261-P1Open ↗
09/01/2026B00479261-P1Open ↗
09/01/2026B00479261-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00479261-P1Open ↗
08/30/2026B00493454-I1Open ↗
08/26/2026B00493454-P3Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026B00479261-P1Open ↗
08/31/2026B00479261-I1Open ↗
08/13/2026B00727252-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/31/2026B00492698-I1Open ↗
08/31/2026B00493454-I1Open ↗
08/31/2026B00491962-I1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
08/31/2026B00479261-I1Open ↗
08/13/2026B00491962-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/31/2026B00479261-I1Open ↗
▸Approvals, Objections & Sign-offs15
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/31/2026B00492698-I1Open ↗
08/31/2026B00493454-P3Open ↗
08/31/2026B00493454-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/31/2026B00492698-I1Open ↗
08/31/2026B00493454-I1Open ↗
08/31/2026B00491962-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/21/2020301493355Open ↗