DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
ECB11/27/2017WORK W/O A PERMIT. NOTED STORE AT 202 PUT UP AWNING & ELECTRICAL WORK FOR LIGHTS WAS DONE NO PEMRITS ON FILE. REMEDY: OBTAIN ALL REQUIRED PERMITS.Nothing owed — awaiting certificate of correction
ECB01/28/2005BQ9/50A/50B FULTON VT BOILER 10HP NB37785,OIL,1998 BQ9)REFERENCE REPLACEMENT HIGH PRESSURE BOILER WAS INSTALLED AND PLACED IN OPERATION W/OUT A PERMIT PROVIDE SIGNED OFF SCHEDUCE C AND 900A APPLICATION AS PROOFNothing owed — awaiting certificate of correction
ECB12/10/2001FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. NOTED: PARAPET WALL LEANING INWARD OVER OF PARAMET WALL. LOCATION: 1ST FL ROOF LEVEL. REMEDY: REPAIR DEFECTIVE PARAPET WALL UNDER PERMIT + APPLICATION AND MAINTAIN BNothing owed — awaiting certificate of correction