Elevator cooperative
202 SEELEY STREET
BROOKLYN · Windsor Terrace-South Slope · BIN 3122187
💬 Discuss this project
1931Year Built
6Stories
D4Building Class
R5BZoning
44,424 sfGross Floor Area
42Units
LL97 CoveredRent Stabilized4 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · 15,000 sf lot · 2.96 FAR built · Flood zone X
Locations of Work
Architecture
Roof3p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EBMG1107/08/2026
PLATINUM SERVICES NY407/08/2026
TRIERA CONTRACTING607/08/2026
OWNER OF PREMISES103/22/2026
202 SEELEY ST OWNERS403/22/2026
202 SEELEY OWNER INC203/22/2026
T-MOBILE103/21/2026
202-212 SEELEY STREET OWNERS COR503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KAMEN TALL ARCHITECTS P.C.407/31/2025
MARTOS ENGINEERING109/26/2024
ASHRAF CORP106/03/2024
ROYAL ENGINEERING, P.C103/05/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GEORGE E BERGER ASS203/21/2026
PROFESSIONAL DESIGN CONSULTANTS LL403/21/2026
GREEN STUDIO203/21/2026
GEORGE E BERGER ASSOCIATES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIERA CONTRACTING INCGeneral Contractor407/08/2026
PEAQ RESTORATION LLCGeneral Contractor207/08/2026
MICHAEL MURPHYElectrical103/21/2026
MP & L METAL INCElectrical103/21/2026
MURPHY, MICHAELElectrical103/21/2026
BEKKERMAN, MIKHAILElectrical103/21/2026
PLATINUM SERVICES NY LLCGeneral Contractor107/08/2026
SKYLINE RESTORATION INCGeneral Contractor107/08/2026
SULLIVAN, JAMESElectrical103/21/2026
CAMBRIA, JElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KAMEN TALL ARCHITECTS P.C3606407/31/2025
ADVANCED ENGINEERING & IN1224202/26/2025
CHRISTIAN L. MARTOS ENGIN5965209/26/2024
MT GROUP798109/04/2024
Building Lifecycle
All (88)Filed (9)Permit Issued (8)Signed Off (4)Facade (FISP) (13)Violation (39)Special Inspection (15)
11/06/2025
Signed off — Alteration
Added Additional Suspended Scaffold Installation For Facade Restoration And Inspection
B01038123-I1
09/30/2025
Special inspection requirement — Masonry
Scott Kamen
09/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/30/2025
Special inspection requirement — Final
MICHAEL KALINOWSKI
07/31/2025
Filed — Alteration
IT IS PROPOSED LIMITED REPAIR TO FAADE, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00934013-P1
07/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/17/2025
Special inspection requirement — Masonry
Scott Kamen
07/17/2025
Special inspection requirement — Final
MICHAEL KALINOWSKI
04/14/2025
Permit issued — Suspended Scaffold
B01038123-I1-SC
03/26/2025
Permit issued — General Construction
B00934013-I1-GC
03/19/2025
Signed off — Alteration
B00552845-I1
02/27/2025
Special inspection requirement — Post-installed Anchors
Jerry Pitera
02/27/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Jerry Pitera
02/26/2025
Filed — Alteration
Added Additional Suspended Scaffold Installation For Facade Restoration And Inspection
B01038123-P1
02/24/2025
Special inspection requirement — Post-installed Anchors
Jerry Pitera
02/24/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Jerry Pitera
10/01/2024
Signed off — Alteration
B01037993-I1
09/26/2024
Filed — Alteration
PROPOSED MAINTENANCE STRUCTURAL REPAIR TO RETAINING WALL. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01090119-S1
09/04/2024
Filed — Alteration
PROPOSED MAINTENANCE STRUCTURAL REPAIR TO RETAINING WALL. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01090119-I1
08/28/2024
Special inspection requirement — Concrete - Cast-In-Place
Christian Martos
08/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
CHRISTOPHER BEHLE
08/01/2024
Special inspection requirement — Final
Scott Kamen
08/01/2024
Special inspection requirement — Post-installed Anchors
Scott Kamen
08/01/2024
Special inspection requirement — Masonry
Scott Kamen
06/04/2024
Permit issued — Sidewalk Shed
B01037993-I1-SH
06/03/2024
Filed — Alteration
B01037993-I1
05/08/2024
Permit issued — Suspended Scaffold
B01038123-I1-SC
04/23/2024
Filed — Alteration
Added Additional Suspended Scaffold Installation For Facade Restoration And Inspection
B01038123-I1
04/22/2024
Permit issued — General Construction
B00934013-I1-GC
03/12/2024
Violation issued (FDNY_NOV, closed)
10/16/2023
Filed — Alteration
IT IS PROPOSED LIMITED REPAIR TO FAADE, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00934013-I1
05/17/2023
Signed off — Alteration
B00024365-I1
02/17/2023
Cycle 9 facade report submitted
02/17/2023
Cycle 9 facade inspection completed
02/16/2023
Cycle 9 facade report signed — SWARMP
09/28/2021
Permit issued — General Construction
B00552845-I1-GC
08/09/2021
Filed — Alteration
B00552845-I1
08/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/27/2018
Permit issued — Sidewalk Shed
B00024365-I1-SH
05/21/2018
Violation issued (FDNY_NOV, closed)
03/05/2018
Filed — Alteration
B00024365-I1
03/05/2018
Permit issued — Sidewalk Shed
B00024365-I1-SH
02/21/2018
Cycle 8 facade report submitted
02/09/2018
Cycle 8 facade report signed — SWARMP
02/01/2018
Cycle 8 facade inspection completed
12/08/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/15/2016
Violation issued (HPD, closed)
I
11/14/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/14/2015
Violation issued (HPD, closed)
I
07/31/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/05/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/19/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/20/2012
Cycle 7 facade report submitted
08/20/2012
Cycle 7 facade report signed — SWARMP
08/06/2012
Cycle 7 facade inspection completed
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/13/2010
Violation issued (ECB, closed)
Construction
06/29/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offPEAQ RESTORATION, LLC04/14/2025
DOB NOWGeneral ConstructionPermit IssuedPEAQ RESTORATION LLC03/26/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC06/04/2024
DOB NOWSuspended ScaffoldSigned-offPEAQ RESTORATION, LLC05/08/2024
DOB NOWGeneral ConstructionPermit IssuedPEAQ RESTORATION LLC04/22/2024
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC09/28/2021
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC06/27/2018
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC03/05/2018
BISOTISSUEDCAMI CONSTRUCTION CORP01/30/2019
BISOTISSUEDFUTURA BUILDERS GROUP INC.07/19/2018
BISOTISSUEDFUTURA BUILDERS GROUP INC.02/06/2018
BISPLISSUEDSCARPONI&SON PLBG&HTG COR10/11/2017
BISOTISSUEDNY CLASS CONSTRUCTION LLC10/10/2017
BISOTISSUEDFUTURA BUILDERS GROUP INC.09/26/2017
BISOTISSUEDSQUAN CONSTRUCTION SERVIC10/19/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC06/12/2015
BISPLISSUEDBIG APPLE SEWER & DRAIN I05/15/2014
BISOTISSUEDNY CLASS CONSTRUCTION LLC04/28/2014
BISOTISSUEDSQUAN CONSTRUCTION SERVIC10/23/2012
BISEQISSUEDG & M EQUIPMENT LEASING L09/20/2012
BISOTISSUEDLEXXUS CONTRACTING AND DE08/10/2012
BISEQISSUEDG & M EQUIPMENT LEASING L06/18/2012
BISOTISSUEDLEXXUS CONTRACTING AND DE12/01/2008
BISOTISSUEDTRI-STATE TELECOMMUNICATIONS INC07/29/2005
4 projects · most recent 04/18/2024
General Wiring Lighting
FiledStatusContractorScope
04/18/2024CompleteILLUMINOUS ELECTRIC CORP.—
02/13/2023Permit IssuedAMERICAN POWER ELECT CONSGeneral Wiring
03/05/2018Permit IssuedMEO ELECTRIC CORP—
01/11/2018CompleteELPO ELECTRICAL CONTG INCGeneral Wiring, Lighting
1 project · most recent 09/26/2024
Concrete
FiledStatusContractorScope
09/26/2024——Concrete
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
09/30/2025MasonryScott Kamenspecial
09/30/2025Tenant Protection Plan Compliance—special
09/30/2025FinalMICHAEL KALINOWSKIprogress
07/25/2025Tenant Protection Plan Compliance—special
07/17/2025MasonryScott Kamenspecial
07/17/2025FinalMICHAEL KALINOWSKIprogress
02/27/2025Post-installed AnchorsJerry Piteraspecial
02/27/2025Alternative Materials - OTCR Buildings Bulletin NumberJerry Piteraspecial
02/24/2025Post-installed AnchorsJerry Piteraspecial
02/24/2025Alternative Materials - OTCR Buildings Bulletin NumberJerry Piteraspecial
08/28/2024Concrete - Cast-In-PlaceChristian Martosspecial
08/27/2024Tenant Protection Plan ComplianceCHRISTOPHER BEHLEspecial
08/01/2024FinalScott Kamenprogress
08/01/2024Post-installed AnchorsScott Kamenspecial
08/01/2024MasonryScott Kamenspecial
▾Documents — 180 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/03/2026B00024365-I1Request digital key ↗
09/01/2026B00552845-I1Request digital key ↗
08/25/2026B01038123-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits32
▸BISPLAN / WORK APPROVAL APPLICATION16
04/12/2022321651529Open ↗
04/04/2022321651529Open ↗
12/09/2021321651529Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION14
01/16/2019340655142Open ↗
10/12/2017321570901Open ↗
10/11/2017321570901Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
08/09/2018321126214Open ↗
11/11/2017321570901Open ↗
▸Seals & Professional Certifications46
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
03/11/2019340655142Open ↗
10/29/2018321126214Open ↗
09/25/2017321651529Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026B00024365-I1Open ↗
09/01/2026B00552845-I1Open ↗
08/25/2026B01037993-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B01038123-P1Open ↗
09/23/2026B01038123-P1Open ↗
09/01/2026B01038123-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/15/2017321651529Open ↗
06/22/2017321570901Open ↗
06/21/2012320494906Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/16/2019340655142Open ↗
06/22/2017321570901Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026B00934013-P1Open ↗
08/29/2026B00934013-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/21/2012320494906Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/16/2019340655142Open ↗
▸BISProfessional and Owner Certification (POC3)1
09/15/2017321651529Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/16/2019340655142Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
11/30/2017321570901Open ↗
06/22/2017321570901Open ↗
05/29/2014320959995Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
12/11/2014320959995Open ↗
10/06/2014320959995Open ↗
▸BISSCHEDULE B - PLUMBING1
04/10/2014320959995Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES3
05/16/2022321651529Open ↗
01/16/2019340655142Open ↗
06/22/2017321570901Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
08/13/2012320490991Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/13/2012320490991Open ↗
▸Environmental & Asbestos14
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
01/16/2019340655142Open ↗
09/19/2017321651529Open ↗
06/22/2017321570901Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026B01090119-I1Open ↗
08/24/2026B01090119-S1Open ↗
08/21/2026B00934013-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
10/15/2009320081512Open ↗
11/10/2008310216520Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
04/10/2014320959995Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
03/11/2019340655142Open ↗
10/29/2018321126214Open ↗
09/25/2017321651529Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
03/11/2019340655142Open ↗
10/29/2018321126214Open ↗
11/03/2014320959995Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/12/2022321651529Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/11/2022321651529Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/16/2019340655142Open ↗
▸BISTR8: Energy Code Progress Inspections1
04/10/2014320959995Open ↗
▸Inspections & Test Reports2
▸BISSTRUCTURAL STEEL - WELDING1
05/10/2022321651529Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/16/2019340655142Open ↗
▸Approvals, Objections & Sign-offs14
▸BISADMINISTRATIVE OBJECTIONS6
05/29/2014320959995Open ↗
10/16/2012320560727Open ↗
07/27/2012320490991Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
05/16/2022321651529Open ↗
10/29/2018321126214Open ↗
03/20/2009310216520Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/03/2014320959995Open ↗
04/30/2014320959995Open ↗
▸BISSHED LETTER1
09/24/2012320494906Open ↗
▸BISFINAL1
05/12/2022321651529Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT14
03/11/2019340655142Open ↗
01/16/2019340655142Open ↗
10/29/2018321126214Open ↗
Showing 3 of 14 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/10/2022321651529Open ↗
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET6
10/16/2017321651529Open ↗
06/22/2017321570901Open ↗
05/06/2015321126214Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION4
10/01/2018321126214Open ↗
05/04/2018321651529Open ↗
11/30/2017321570901Open ↗
Showing 3 of 4 on file for this type
▸BISeFiling Job Application Cover Sheet2
04/10/2014320959995Open ↗
01/16/2019340655142Open ↗
▸BISBOROUGH INTAKE FORM1
10/29/2018321126214Open ↗
▸Other Documents7
▸DOB NOWManufacturer's Specifications2
08/13/2026B01038123-I1Open ↗
08/13/2026B01038123-P1Open ↗
▸DOB NOWCalculations2
08/13/2026B01038123-P1Open ↗
08/13/2026B01038123-I1Open ↗
▸BISDHCR DOCUMENT1
01/16/2019340655142Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/20/2016321126214Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026B00024365-I1Open ↗