← Back
Training school
Saint Thomas Choir School
202 WEST 58 STREET · Midtown-Times Square · BIN 1024905
💬 Discuss this project
1986Year Built
16Stories
W4Building Class
C5-1Zoning
76,883 sfGross Floor Area
0Units
LL97 CoveredRent Stabilized3 Open Violations ▸FISP: SAFE
Training school · Owner of record: ST. THOMAS CHURCH/ ETC. · 7,532 sf lot · 10.21 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof20p · 3 filings · 20 docs
Floor 1518p · 3 filings · 20 docs
Floor 1411p · 1 filing · 20 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 412p · 1 filing · 20 docs
Floor 3
Floor 212p · 1 filing · 20 docs
Floor 115p · 2 filings · 20 docs
Mezzanine1p · 1 filing · 5 docs
Cellar12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAINT THOMAS CHURCH1909/13/2026
ST. THOMAS CHURCH/ ETC.103/22/2026
ST THOMAS CHURCH903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALTIERI SEBOR WIEBER LLC907/29/2026
FZAD304/01/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FZAD ARCHITECTURE + DESIGN803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ELITE HYDRA INCGeneral Contractor207/08/2026
LOCKER, WAYNEElectrical103/21/2026
WAYNE LOCKERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CDG ARCHITECTS LLC /DBA:1327207/29/2026
FZAD ARCHITECTURE + DESIG2041507/29/2026
Building Lifecycle
All (134)Filed (13)Permit Issued (3)Signed Off (1)Facade (FISP) (15)Violation (46)Objection (26)Special Inspection (30)
08/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH YOUNG
08/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
Frederic Zonsius
08/25/2026
Special inspection requirement — Final
JOSEPH YOUNG
08/25/2026
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH YOUNG
08/25/2026
Special inspection requirement — Post-installed Anchors
Yongho Kim
08/25/2026
Special inspection requirement — Maintenance information
JOSEPH YOUNG
08/25/2026
Special inspection requirement — Mechanical Systems
Yongho Kim
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yongho Kim
08/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH YOUNG
08/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH YOUNG
07/29/2026
Filed — Alteration
Replace existing fans in existing location with new Greenheck units throughout building and on roof. Install new ventilation ductwork for gas meter room and emergency generator room. No change to use, egress, or occupancy.
M00935518-P2
04/06/2026
Cycle 10 facade report signed — SWARMP
03/28/2026
Cycle 10 facade inspection completed
01/20/2026
Special inspection requirement — Post-installed Anchors
Yongho Kim
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yongho Kim
01/20/2026
Special inspection requirement — Mechanical Systems
Yongho Kim
01/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
Frederic Zonsius
01/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH YOUNG
01/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH YOUNG
01/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH YOUNG
01/20/2026
Special inspection requirement — Final
JOSEPH YOUNG
01/20/2026
Special inspection requirement — Maintenance information
JOSEPH YOUNG
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH YOUNG
11/25/2025
Cycle 10 facade report submitted
11/24/2025
Signed off — Alteration
Hands-on FISP inspection using industrial rope access
M01236474-I1
07/03/2025
Permit issued — Mechanical Systems
M00935518-I1-MS
07/01/2025
Permit issued — Suspended Scaffold
M01236474-I1-SC
06/26/2025
Permit issued — General Construction
M00984626-I1-GC
06/09/2025
Objection raised — Admin
06/09/2025
Objection resolved — Addressed
06/08/2025
Filed — Alteration
Hands-on FISP inspection using industrial rope access
M01236474-I1
06/04/2025
Violation issued (HPD, closed)
A
05/20/2025
Special inspection requirement — Insulation placement and R values
Frederic Zonsius
05/20/2025
Special inspection requirement — Lighting controls
Frederic Zonsius
05/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
Frederic Zonsius
05/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Frederic Zonsius
05/20/2025
Special inspection requirement — Final
Frederic Zonsius
05/20/2025
Special inspection requirement — Interior lighting power
Frederic Zonsius
05/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
Frederic Zonsius
05/19/2025
Objection resolved — Addressed
04/29/2025
Filed — Alteration
Replace existing fans in existing location with new Greenheck units throughout building and on roof. Install new ventilation ductwork for gas meter room and emergency generator room. No change to use, egress, or occupancy.
M00935518-P1
04/09/2025
Objection raised — Scope
04/01/2025
Filed — Alteration
New boilers and fans on 15th floor and roof. New lighting on 15th floor as per plans. New roof installation. Install new louver on facade. No change in use, egress, or occupancy.
M00984626-P1
03/04/2025
Filed — Alteration
REPLACEMENT OF (3) AIR HANDLING UNITS AS WELL AS FOR OTHER MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS
M01106279-I1
02/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
02/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/05/2025
Special inspection requirement — Interior lighting power
Frederic Zonsius
12/18/2024
Objection resolved — Addressed
12/16/2024
Objection resolved — Addressed
12/13/2024
Objection raised — Other
12/12/2024
Filed — Alteration
Install 1 new gas boiler to replace existing boilers on 15th floor. No change to use, egress, or occupancy.
M00960993-S8
12/11/2024
Objection raised — Other
11/22/2024
Objection resolved — Addressed
10/18/2024
Objection raised — Other
10/18/2024
Objection resolved — Resolved
10/18/2024
Objection raised — Other
10/18/2024
Objection raised — Admin
10/18/2024
Objection raised — Admin
10/15/2024
Objection raised — Accessibility
10/15/2024
Objection resolved — Addressed
Latest 60 of 134 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedELITE HYDRA INC07/03/2025
DOB NOWSuspended ScaffoldSigned-offVERTICAL ACCESS LLC07/01/2025
DOB NOWGeneral ConstructionPermit IssuedELITE HYDRA INC06/26/2025
BISFPISSUEDSENTINEL FIRE SAFETY CORP10/24/2016
BISEQISSUEDCOLGATE SCAFFOLDING06/19/1997
2 projects · most recent 07/29/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/29/2026Permit IssuedELITE HYDRA INCHeating Systems, Ventilation Systems
Heating
Marley IUH-724 75 kW · Unit Heater ×6
IUH-1020 10 kW · Unit Heater ×3
Ventilation
Greenheck SQ-80-VG 150 CFM · Exhaust Fan ×6
USF-24 7,000 CFM · Kitchen Exhaust ×6
CUE-100-VG 1,468 CFM · Exhaust Fan ×3
CUE-100HP-VG 250 CFM · Exhaust Fan ×3
G-090-VG 665 CFM · Exhaust Fan ×3
G-098-VG 400 CFM · Exhaust Fan ×3
G-099-VG 591 CFM · Kitchen Exhaust ×3
G-130-VG 1,761 CFM · Exhaust Fan ×3
G-140-VG 1,930 CFM · Exhaust Fan ×3
G-160-VG 3,800 CFM · Exhaust Fan ×3
G-90-VG 420 CFM · Exhaust Fan ×3
QEID-12 800 CFM · Exhaust Fan ×3
03/04/2025——Heating Systems, Ventilation Systems
Heating
Trane D5WB 244,000 BTU ×3
Ventilation
Greenheck G-090-VG 420 CFM · Exhaust Fan ×1
G-143-VG 1,775 CFM · Exhaust Fan ×1
G-180-20 3,800 CFM · Exhaust Fan ×1
SWB-222-30 6,000 CFM · Exhaust Fan ×1
Trane PCC-08 3,000 CFM · Ahu ×1
PCC-12 5,240 CFM · Ahu ×1
PCC-17 7,000 CFM · Ahu ×1
Loren Cook 20CV 5,000 CFM · Exhaust Fan ×1
1 project · most recent 10/01/2024
Gas
FiledStatusContractorScope
10/01/2024——Gas
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
08/25/2026Post-installed AnchorsYongho Kimspecial
08/25/2026HVAC-R and service water piping design and insulationJOSEPH YOUNGenergy_progress
08/25/2026HVAC-R and service water heating system controlsJOSEPH YOUNGenergy_progress
08/25/2026Maintenance informationJOSEPH YOUNGenergy_progress
08/25/2026HVAC-R and service water heating equipmentJOSEPH YOUNGenergy_progress
08/25/2026Energy Code Compliance InspectionsJOSEPH YOUNGprogress
08/25/2026FinalJOSEPH YOUNGprogress
08/25/2026Tenant Protection Plan ComplianceFrederic Zonsiusspecial
08/25/2026Fire-Resistant Penetrations and JointsYongho Kimspecial
08/25/2026Mechanical SystemsYongho Kimspecial
01/20/2026Fire-Resistant Penetrations and JointsYongho Kimspecial
01/20/2026HVAC-R and service water heating equipmentJOSEPH YOUNGenergy_progress
01/20/2026HVAC-R and service water heating system controlsJOSEPH YOUNGenergy_progress
01/20/2026HVAC-R and service water piping design and insulationJOSEPH YOUNGenergy_progress
01/20/2026Maintenance informationJOSEPH YOUNGenergy_progress
01/20/2026FinalJOSEPH YOUNGprogress
01/20/2026Energy Code Compliance InspectionsJOSEPH YOUNGprogress
01/20/2026Tenant Protection Plan ComplianceFrederic Zonsiusspecial
01/20/2026Post-installed AnchorsYongho Kimspecial
01/20/2026Mechanical SystemsYongho Kimspecial
05/20/2025Fire-Resistance Rated ConstructionFrederic Zonsiusprogress
05/20/2025Tenant Protection Plan ComplianceFrederic Zonsiusspecial
05/20/2025FinalFrederic Zonsiusprogress
05/20/2025Energy Code Compliance InspectionsFrederic Zonsiusprogress
05/20/2025Interior lighting powerFrederic Zonsiusenergy_progress
Latest 25 of 66.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
St. Thomas Choir SchoolEducation—
Project M01236474 Alteration · LOC Issued · 06/08/2025
Project M01076349 Alteration · Approved · 10/01/2024
Project M00620276 Alteration · Approved · 10/29/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 157 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/03/2026M00620276-I1Request digital key ↗
08/27/2026M00935518-P2Request digital key ↗
08/27/2026M00935518-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION12
09/17/2024140293126Open ↗
01/29/2020121205329Open ↗
12/26/2019121205329Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION2
10/26/2016122761519Open ↗
05/09/2011120663816Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/28/2020121205329Open ↗
▸BISZONING DIAGRAM1
01/28/2020121205329Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
01/28/2020121205329Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION1
01/28/2020121205329Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
01/28/2020121205329Open ↗
▸BISZONING EXHIBIT V: CERTIFICATION1
01/28/2020121205329Open ↗
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature22
09/01/2026M00935518-P1Open ↗
08/28/2026M00935518-I1Open ↗
08/28/2026M00935518-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/26/2026M01057378-I1Open ↗
08/26/2026M00960993-S8Open ↗
08/26/2026M00960993-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M00935518-P1Open ↗
09/01/2026M00935518-P1Open ↗
08/28/2026M00935518-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
10/26/2016122761519Open ↗
04/20/2016122761519Open ↗
12/29/2014122236295Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/20/2015140293126Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING1
04/20/2011120663816Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
11/21/2016122117743Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/20/2016122761519Open ↗
▸Safety & Tenant Protection14
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist12
08/13/2026M01076349-I1Open ↗
08/13/2026M00984626-I1Open ↗
08/13/2026M00620276-I1Open ↗
Showing 3 of 12 on file for this type
▸BISSTREET TREE CHECKLIST1
01/28/2020121205329Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
01/20/2015140293126Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/26/2026M00960993-I1Open ↗
08/24/2026M01106279-I1Open ↗
08/24/2026M00984626-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
04/20/2016122761519Open ↗
08/04/2015122117743Open ↗
01/20/2015140293126Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/20/2011120663816Open ↗
04/20/2011120663816Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
02/02/2015122236295Open ↗
02/02/2015122236295Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/04/2015140293126Open ↗
04/14/2015140293126Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/04/2015140293126Open ↗
01/20/2015140293126Open ↗
▸Approvals, Objections & Sign-offs18
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/26/2026M00960993-I1Open ↗
08/24/2026M00984626-I1Open ↗
08/14/2026M00960993-S8Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
01/29/2020121205329Open ↗
01/07/2020121205329Open ↗
03/17/2017121331512Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/20/2011120663816Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/15/2017122117743Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
02/15/2017122117743Open ↗
04/20/2016122761519Open ↗
08/04/2015122117743Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET4
04/20/2016122761519Open ↗
08/04/2015122117743Open ↗
12/29/2014122236295Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
01/28/2020121205329Open ↗
06/04/2015140293126Open ↗
04/07/2015140293126Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/20/2015140293126Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/20/2016122761519Open ↗
12/29/2014122236295Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01236474-I1Open ↗