← Back
Elevator apt, semi-fireproof without stores
2020 GRAND AVENUE
💬 Discuss this project
1925Year Built
6Stories
D1Building Class
R7-1Zoning
50,400 sfGross Floor Area
55Units
LL97 CoveredRent Stabilized15 Open Violations ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: 2020 GRAND REALTY LLC. · 11,250 sf lot · 4.48 FAR built · Flood zone X
Locations of Work
General
Floor 11p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DIAMOND PROPERTY GROUP407/08/2026
HARRY CONSTRUCTION GROUP707/08/2026
2020 GRAND REALTY1303/22/2026
2020 GRAND AVENUE LLC103/22/2026
DIAMOND ROSENBERG CORP103/22/2026
ASSOCIATES ARDEE103/22/2026
ADREE ASSOCIATES103/22/2026
2114 AQUEDUCT REALTY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC210/16/2022
JOSE L. PENA,P.E.102/01/2021
GREEN DESIGN107/10/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
E&A DESIGN AND EXPEDITER CORP.203/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HARRY CONSTRUCTION GROUPGeneral Contractor507/08/2026
RALPH RUSSOElectrical203/21/2026
BLUE USA CONSTR COMP INC*General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASR ENGINEERING PC8404110/16/2022
JOSE L. PENA, P.E5969102/01/2021
Building Lifecycle
All (85)Filed (4)Permit Issued (4)Signed Off (3)Facade (FISP) (12)Violation (60)Special Inspection (2)
04/30/2026
Violation issued (HPD, closed)
A
11/26/2025
Violation issued (HPD, closed)
B
10/02/2025
Violation issued (HPD, closed)
B
10/02/2025
Violation issued (HPD, closed)
B
10/02/2025
Violation issued (HPD, closed)
A
10/02/2025
Violation issued (HPD, closed)
B
05/12/2025
Violation issued (HPD, closed)
B
05/12/2025
Violation issued (HPD, closed)
B
05/12/2025
Violation issued (HPD, closed)
A
05/12/2025
Violation issued (HPD, closed)
A
02/26/2025
Violation issued (HPD, closed)
A
02/26/2025
Violation issued (HPD, closed)
A
02/26/2025
Violation issued (HPD, closed)
B
02/26/2025
Violation issued (HPD, closed)
B
02/26/2025
Violation issued (HPD, closed)
B
02/26/2025
Violation issued (HPD, closed)
B
02/26/2025
Violation issued (HPD, closed)
B
08/07/2024
Violation issued (HPD, open)
B
08/07/2024
Violation issued (HPD, closed)
A
08/07/2024
Violation issued (HPD, closed)
C
06/20/2024
Violation issued (HPD, closed)
A
06/20/2024
Violation issued (HPD, closed)
A
06/20/2024
Violation issued (HPD, closed)
A
06/20/2024
Violation issued (HPD, open)
C
06/05/2024
Violation issued (HPD, closed)
C
06/05/2024
Violation issued (HPD, open)
B
06/05/2024
Violation issued (HPD, closed)
A
06/05/2024
Violation issued (HPD, open)
C
06/05/2024
Violation issued (HPD, closed)
C
06/05/2024
Violation issued (HPD, open)
C
06/05/2024
Violation issued (HPD, open)
C
12/19/2023
Violation issued (HPD, closed)
C
12/19/2023
Violation issued (HPD, closed)
C
11/06/2023
Violation issued (HPD, closed)
C
11/06/2023
Violation issued (HPD, closed)
C
11/06/2023
Violation issued (HPD, closed)
C
11/06/2023
Violation issued (HPD, closed)
B
11/06/2023
Violation issued (HPD, closed)
B
11/06/2023
Violation issued (HPD, closed)
C
11/06/2023
Violation issued (HPD, closed)
C
11/06/2023
Violation issued (HPD, closed)
B
11/06/2023
Violation issued (HPD, closed)
B
11/06/2023
Violation issued (HPD, closed)
B
11/06/2023
Violation issued (HPD, closed)
B
10/24/2023
Violation issued (HPD, closed)
A
10/24/2023
Violation issued (HPD, closed)
B
10/24/2023
Violation issued (HPD, open)
C
10/24/2023
Violation issued (HPD, closed)
B
10/24/2023
Violation issued (HPD, closed)
B
10/24/2023
Violation issued (HPD, closed)
B
10/24/2023
Violation issued (HPD, open)
C
10/05/2023
Violation issued (HPD, closed)
C
10/05/2023
Violation issued (HPD, closed)
B
10/05/2023
Violation issued (HPD, closed)
B
10/05/2023
Violation issued (HPD, closed)
C
10/05/2023
Violation issued (HPD, closed)
C
10/05/2023
Violation issued (HPD, closed)
B
09/14/2023
Signed off — Alteration
PROPOSED BRICKS REPLACEMENT OF PARAPET WALL AS SHOWN AS PER PLANS NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION
X08021755-I1
09/14/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X08021658-I1
05/30/2023
Cycle 9 facade report signed — SAFE
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHARRY CONSTRUCTION GROUP10/18/2022
DOB NOWSidewalk ShedSigned-offHARRY CONSTRUCTION GROUP10/17/2022
DOB NOWGeneral ConstructionSigned-offBLUE USA CONSTR COMP INC*06/15/2021
DOB NOWSidewalk ShedSigned-offHARRY CONSTRUCTION GROUP07/13/2020
BISOTISSUEDBEST ENERGY POWER 2015 LL05/19/2023
BISOTISSUEDBEST ENERGY POWER 2015 LL08/30/2022
BISFSISSUEDAMBASSADOR FUEL & OIL CORP06/08/2007
BISEQISSUEDGHOTRA GENERAL CONSTRUCTION INC04/25/2005
BISOTISSUEDGHOTRA GENERAL CONSTRUCTION INC04/25/2005
BISPLISSUEDN. KOFSKY & SONS INC04/13/2005
BISOTISSUEDN. KOFSKY & SONS INC04/13/2005
1 project · most recent 08/30/2023
FiledStatusContractorScope
08/30/2023CompleteRJ RUSSO ELECTRIC CO.—
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
10/16/2022MasonryAKM RAHMANspecial
10/16/2022FinalAKM RAHMANprogress
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch2
08/23/2026X08021658-I1Request digital key ↗
08/23/2026X08021755-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00367599-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/25/2026X00445178-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
07/23/2022240332751Open ↗
08/21/2020240282966Open ↗
▸BISWORK PERMIT APPLICATION2
08/30/2022240332751Open ↗
08/28/2020240282966Open ↗
▸DOB NOWHPD - Permit Notice1
08/13/2026X00445178-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026X00367599-I1Open ↗
08/23/2026X08021755-I1Open ↗
08/13/2026X08021658-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/21/2020240282966Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/23/2022240332751Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/21/2020240282966Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/21/2020240282966Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/29/2026X08021755-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026X08021755-I1Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES1
08/21/2020240282966Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
08/30/2022240332751Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026X00367599-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/23/2022240332751Open ↗
08/21/2020240282966Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
09/29/2023240332751Open ↗
08/30/2022240332751Open ↗
08/27/2022240332751Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
09/29/2023240332751Open ↗
09/29/2023240332751Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/10/2020240282966Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/21/2020240282966Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
07/23/2022240332751Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
09/29/2023240332751Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
09/29/2023240332751Open ↗
08/30/2022240332751Open ↗
08/27/2022240332751Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/02/2023240332751Open ↗
09/10/2020240282966Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
07/23/2022240332751Open ↗
09/10/2020240282966Open ↗
08/21/2020240282966Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/29/2023240332751Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
08/27/2022240332751Open ↗
08/17/2022240332751Open ↗
07/23/2022240332751Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
07/23/2022240332751Open ↗
08/21/2020240282966Open ↗
▸Other Documents2
▸BISTax Abatement Miscellaneous1
10/02/2023240332751Open ↗
▸DOB NOWDHCR Document1
08/13/2026X00445178-I1Open ↗