← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2020 GRAND AVENUE
BRONX · BIN 2008630
💬 Discuss this project
1925Year Built
6Stories
D1Building Class
R7-1Zoning
50,400 sfGross Floor Area
55Units
LL97 CoveredRent Stabilized13 Active Violations ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: 2020 Grand Realty · 11,250 sf lot · 4.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Diamond Property Group INC.7p · 3 filings · 9 docs
Site & exteriorParapet wall bricks replacement2p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2020 Grand Realty803/22/2026
Diamond Property Group407/08/2026
2114 Aqueduct Realty303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Asr Engineering210/16/2022
Jose L. Pena, P.E.102/01/2021
Green Design107/10/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
E&A Design and Expediter203/21/2026
Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Harry Construction GroupScaffold403/21/2026
Ghotra General ConstructionGeneral Contractor203/21/2026
RJ Russo ElectricElectrical203/21/2026
N Kofsky SonsPlumbing103/21/2026
Harry Construction GroupGeneral Contractor107/08/2026
Blue USA Construction CompanyGeneral Contractor107/08/2026
N Kofsky SonsGeneral Contractor103/21/2026
Best Energy Power 2015General Contractor205/19/2023
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Asr Engineering8404110/16/2022
Jose L. Pena, P.E.5969102/01/2021
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
05/06/2026
Boiler inspection report filed
Initial · no defects · Accepted
04/30/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
03/23/2026
Elevator Category 1 inspection report filed
11/26/2025
§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF PLYWOOD AT FLOOR (WEST SECTION) AT PUBLIC HALL, 6th STORY
HPD violation · closed
250 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHarry Construction Group10/18/2022
DOB NOWSidewalk ShedSigned-offHarry Construction Group10/17/2022
DOB NOWGeneral ConstructionSigned-offBlue USA Construction Company06/15/2021
DOB NOWSidewalk ShedSigned-offHarry Construction Group07/13/2020
BISOTISSUEDBest Energy Power 201505/19/2023
BISOTISSUEDBest Energy Power 201508/30/2022
BISFSISSUEDAmbassador Fuel & Oil06/08/2007
BISEQISSUEDGhotra General Construction04/25/2005
BISOTISSUEDGhotra General Construction04/25/2005
BISPLISSUEDN. Kofsky & Sons04/13/2005
BISOTISSUEDN. Kofsky & Sons04/13/2005
1 project · most recent 08/30/2023
FiledStatusContractorScope
08/30/2023CompleteRJ Russo Electric—
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
10/16/2022MasonryAKM RAHMANspecial
10/16/2022FinalAKM RAHMANprogress
55 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account