Amusement place, bath house, boat house
2020 WHITE PLAINS ROAD
BRONX · Pelham Parkway-Van Nest · BIN 2047885
💬 Discuss this project
1930Year Built
2Stories
P6Building Class
C8-1Zoning
20,000 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Amusement place, bath house, boat house · Owner of record: ENOS REALTY LLC · 10,000 sf lot · 2 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionGeneral
Roof9p · 4 filings · 20 docs
Floor 32p · 1 filing · 10 docs
Floor 213p · 4 filings · 20 docs
Floor 113p · 4 filings · 20 docs
Cellar10p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ENOS REALTY5507/08/2026
OWNER OF 2020 WHITE PLAIN103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VELOCITY ARCHITECTURAL SERVICES PLL1105/11/2023
AK CONSULTING SERVICES, INC312/02/2022
YSRAEL A. SEINUK, P.C.208/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES2203/21/2026
RA203/21/2026
AK CONSULTING SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EAGLE 1 MECHANICAL, INCPlumbing2407/08/2026
ASHNU INTERNATIONAL INCGeneral Contractor807/08/2026
BAY RIDGE P & H INCPlumbing303/22/2026
ACS SYSTEM ASSOCIATES INC.General Contractor203/21/2026
EAGLE 1 MECHANICAL, INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.3171405/11/2023
Building Lifecycle
All (90)Filed (16)Permit Issued (8)Signed Off (7)Violation (23)Inspection (6)Special Inspection (30)
02/09/2026
Violation issued (FDNY_NOV, closed)
09/23/2025
Violation issued (FDNY_NOV, closed)
02/20/2025
Violation issued (FDNY_NOV, closed)
02/20/2025
Violation issued (FDNY_NOV, closed)
10/01/2024
Violation issued (FDNY_NOV, closed)
10/01/2024
Violation issued (FDNY_NOV, closed)
07/22/2024
Violation issued (FDNY_NOV, closed)
07/22/2024
Violation issued (FDNY_NOV, closed)
08/04/2023
Signed off — Alteration
Selective removals, new stairs, new non bearing partitions, doors, window replacement, roof covering replacement, masonry repair, new roof barrier, new finishes, millwork.
X00660091-I1
08/03/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 2020 WHITE PLAINS ROAD, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X08037724-I1
07/27/2023
Signed off — Alteration
X492 - 3K: Selective removals, new roof top units, ac units, ductwork and controls, HVAC piping. Lighting fixtures and controls.
X00664244-I1
07/26/2023
Permit issued — Mechanical Systems
X00664244-I1-GC
05/12/2023
Special inspection requirement — HVAC-R and service water heating system controls
MIKHAIL ZEYGMAN
05/12/2023
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
05/12/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MIKHAIL ZEYGMAN
05/12/2023
Special inspection requirement — Duct leakage testing, insulation and design
MIKHAIL ZEYGMAN
05/12/2023
Special inspection requirement — Final
MIKHAIL ZEYGMAN
05/12/2023
Special inspection requirement — Interior lighting power
MIKHAIL ZEYGMAN
05/12/2023
Special inspection requirement — Maintenance information
MIKHAIL ZEYGMAN
05/12/2023
Special inspection requirement — Lighting controls
MIKHAIL ZEYGMAN
05/12/2023
Special inspection requirement — Exterior lighting power
MIKHAIL ZEYGMAN
05/12/2023
Special inspection requirement — Metering
MIKHAIL ZEYGMAN
05/12/2023
Special inspection requirement — Mechanical Systems
MIKHAIL ZEYGMAN
05/12/2023
Special inspection requirement — Shutoff dampers
MIKHAIL ZEYGMAN
05/11/2023
Filed — Alteration
X492 - 3K: Selective removals, new roof top units, ac units, ductwork and controls, HVAC piping. Lighting fixtures and controls.
X00664244-P2
05/08/2023
Signed off — Alteration
Steel dunnage, steel stairs, concrete pits, misc. steel support
X00660851-I1
05/05/2023
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
05/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
MIKHAIL ZEYGMAN
05/05/2023
Special inspection requirement — Shutoff dampers
MIKHAIL ZEYGMAN
05/05/2023
Special inspection requirement — Exterior lighting power
MIKHAIL ZEYGMAN
05/05/2023
Special inspection requirement — Duct leakage testing, insulation and design
MIKHAIL ZEYGMAN
05/05/2023
Special inspection requirement — Metering
MIKHAIL ZEYGMAN
05/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MIKHAIL ZEYGMAN
05/05/2023
Special inspection requirement — Interior lighting power
MIKHAIL ZEYGMAN
05/05/2023
Special inspection requirement — Maintenance information
MIKHAIL ZEYGMAN
05/05/2023
Special inspection requirement — Mechanical Systems
MIKHAIL ZEYGMAN
05/05/2023
Special inspection requirement — Lighting controls
MIKHAIL ZEYGMAN
05/05/2023
Special inspection requirement — Final
MIKHAIL ZEYGMAN
05/02/2023
Signed off — Alteration
Selective removals, new piping, new fixtures, hot water heater.
X00660836-I1
05/02/2023
Signed off — Alteration
New Sprinklers
X00660859-I1
04/17/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
04/13/2023
Filed — Alteration
Selective removals, new piping, new fixtures, hot water heater.
X00660836-P2
04/12/2023
Special inspection requirement — Sprinkler Systems
MIKHAIL ZEYGMAN
04/11/2023
Filed — Alteration
New Sprinklers
X00660859-P2
04/10/2023
Special inspection requirement — Sprinkler Systems
MIKHAIL ZEYGMAN
04/01/2023
Signed off — Alteration
X08038006-I1
03/23/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/23/2023
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
03/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
12/02/2022
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 2020 WHITE PLAINS ROAD, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X08037724-P1
11/30/2022
Permit issued — Support of Excavation
X08038006-I1-SE
11/22/2022
Filed — Alteration
X08038006-I1
11/22/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
MIKHAIL ZEYGMAN
11/16/2022
Permit issued — Construction Fence
X08037724-I1-FN
11/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/10/2022
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 2020 WHITE PLAINS ROAD, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X08037724-I1
11/10/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MIKHAIL ZEYGMAN
10/21/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offERNEST KURIQI07/26/2023
DOB NOWSupport of ExcavationSigned-offERNEST KURIQI11/30/2022
DOB NOWConstruction FenceSigned-offERNEST KURIQI11/16/2022
DOB NOWStructuralSigned-offERNEST KURIQI09/21/2022
DOB NOWGeneral ConstructionSigned-offACS SYSTEM ASSOCIATES INC.09/21/2022
DOB NOWGeneral ConstructionSigned-offERNEST KURIQI09/07/2022
DOB NOWPlumbingSigned-offEAGLE 1 MECHANICAL, INC09/01/2022
DOB NOWSprinklersSigned-offEAGLE 1 MECHANICAL, INC09/01/2022
BIS—ISSUEDASHNU INTERNATIONAL INC03/21/2023
BISOTISSUEDALL TECHNICAL ART04/21/2006
BISFPISSUEDFIRE FOE SYSTEM CORP05/22/2003
BISFPISSUEDALL-BORO FIRE & SAFETY EQUIP. CO12/15/1995
BIS—ISSUEDGK CONSTRUCTION07/19/1995
1 project · most recent 05/17/2023
General Wiring
FiledStatusContractorScope
05/17/2023CompleteTRIBECA ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/23/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/23/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
11/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/21/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/21/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
05/12/2023HVAC-R and service water heating system controlsMIKHAIL ZEYGMANenergy_progress
05/12/2023Lighting controlsMIKHAIL ZEYGMANenergy_progress
05/12/2023Maintenance informationMIKHAIL ZEYGMANenergy_progress
05/12/2023Interior lighting powerMIKHAIL ZEYGMANenergy_progress
05/12/2023MeteringMIKHAIL ZEYGMANenergy_progress
05/12/2023Exterior lighting powerMIKHAIL ZEYGMANenergy_progress
05/12/2023HVAC-R and service water piping design and insulationMIKHAIL ZEYGMANenergy_progress
05/12/2023Duct leakage testing, insulation and designMIKHAIL ZEYGMANenergy_progress
05/12/2023Shutoff dampersMIKHAIL ZEYGMANenergy_progress
05/12/2023Mechanical SystemsMIKHAIL ZEYGMANspecial
05/12/2023FinalMIKHAIL ZEYGMANprogress
05/12/2023Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
05/05/2023Duct leakage testing, insulation and designMIKHAIL ZEYGMANenergy_progress
05/05/2023HVAC-R and service water heating system controlsMIKHAIL ZEYGMANenergy_progress
05/05/2023Lighting controlsMIKHAIL ZEYGMANenergy_progress
05/05/2023Maintenance informationMIKHAIL ZEYGMANenergy_progress
05/05/2023Interior lighting powerMIKHAIL ZEYGMANenergy_progress
05/05/2023MeteringMIKHAIL ZEYGMANenergy_progress
05/05/2023Shutoff dampersMIKHAIL ZEYGMANenergy_progress
05/05/2023FinalMIKHAIL ZEYGMANprogress
05/05/2023Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
05/05/2023Mechanical SystemsMIKHAIL ZEYGMANspecial
05/05/2023HVAC-R and service water piping design and insulationMIKHAIL ZEYGMANenergy_progress
05/05/2023Exterior lighting powerMIKHAIL ZEYGMANenergy_progress
04/14/2023Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
Latest 25 of 65.
▾Documents — 144 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/24/2026X00660091-P1Request digital key ↗
08/24/2026X00660091-I1Request digital key ↗
08/24/2026X00660851-P1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION12
01/29/2026220755608Open ↗
01/09/2026220755608Open ↗
12/06/2023201047544Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/01/2023220741883Open ↗
▸BISWORK PERMIT APPLICATION1
03/21/2023220741883Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM2
12/12/2023220741883Open ↗
12/12/2023220741883Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/16/2023220741883Open ↗
▸BISVERIFY TAX LOT1
10/16/2023220741883Open ↗
▸Seals & Professional Certifications78
▸DOB NOWProgress Inspector Seal & Signature44
08/31/2026X00664244-P1Open ↗
08/31/2026X00664244-P1Open ↗
08/31/2026X00664244-P1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/02/2026X08038006-I1Open ↗
09/02/2026X08038006-I1Open ↗
09/01/2026X00660836-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/24/2026X00660091-P1Open ↗
08/24/2026X00660091-I1Open ↗
08/24/2026X00660859-I1Open ↗
Showing 3 of 16 on file for this type
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
12/13/2022220741883Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/24/2026X00660091-I1Open ↗
08/13/2026X00664244-I1Open ↗
08/13/2026X00660851-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026X00664244-I1Open ↗
08/13/2026X00660091-I1Open ↗
▸Approvals, Objections & Sign-offs16
▸BISSCHEDULE A - OCCUPANCY / USE9
01/09/2026220755608Open ↗
01/09/2026220755608Open ↗
08/09/2023220741883Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP Variance (V5) letter5
08/24/2026X00660091-I1Open ↗
08/13/2026X00660851-I1Open ↗
08/13/2026X00660836-I1Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/12/2023220741883Open ↗
12/12/2023220741883Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT (FINAL): PW31
09/28/2023220741883Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
01/29/2026220755608Open ↗
01/09/2026220755608Open ↗
04/19/2023220741883Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
01/09/2026220755608Open ↗
01/27/2022220741883Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM1
12/13/2022220741883Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/13/2022220741883Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X08038006-I1Open ↗