← Back
BuildNYC
Public elementary, junior or senior high
Achievement First Brownsville Charter School
2021 BERGEN STREET · Ocean Hill · BIN 3038939
💬 Discuss this project
1965Year Built
4Stories
W1Building Class
R6Zoning
171,072 sfGross Floor Area
1Units
LL97 Covered2 Active Violations 0 unresolved · 2 paperwork only 2 likely answered ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 128,400 sf lot · 1.33 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 41 filing
Floor 31 filing
Floor 21 filing
Floor 12 filings
Cellar1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Education1103/22/2026
Davis Technolgies Group203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYC School Construction Authority301/22/2026
Eme Consulting Engineering Group201/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC School Construction Authority303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & S ElectricElectrical603/21/2026
Pulsar ElectricElectrical303/21/2026
Charan Electrical Enterp'sElectrical203/22/2026
Anco Electl ContctngElectrical103/22/2026
Dennison ElectricElectrical103/22/2026
R.M.F. ElectricElectrical103/21/2026
Astro Electrical ContngElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC Logistics Dba JPCL EN351201/19/2023
Building Lifecycle
All (152)Filed (5)Violation (104)Objection (4)Special Inspection (25)
08/17/2026
Boiler inspection report filed
Initial · defects found · Accepted
05/22/2026
Reissue ECB#35677570Y exit door not self closing 1ST floor main,exit#2FORTH floor.rem:comply with code.
ECB violation · open
03/02/2026
Objection resolved — Addressed
01/29/2026
Objection raised — Other
01/22/2026
Filed — Alteration
Remove and replace 2 exhaust fans and duct work, installation of 4 gravity ventilators. Removal of 8 ductless split AC systems and 8 radiators serving classrooms. Install of 2 MZVAV (RTU).remove and replace of 2 3-ton and 2 2-ton ductless AC units.
B01314055-I1
01/22/2026
Filed — Alteration
Remove and replace 2 exhaust fans and duct work, installation of 4 gravity ventilators. Removal of 8 ductless split AC systems and 8 radiators serving classrooms. Install of 2 MZVAV (RTU).remove and replace of 2 3-ton and 2 2-ton ductless AC units.
B01314055-S2
01/22/2026
Filed — Alteration
Remove and replace 2 exhaust fans and duct work, installation of 4 gravity ventilators. Removal of 8 ductless split AC systems and 8 radiators serving classrooms. Install of 2 MZVAV (RTU).remove and replace of 2 3-ton and 2 2-ton ductless AC units.
B01314055-S1
01/22/2026
Special inspection requirement — Post-installed Anchors
01/22/2026
Special inspection requirement — Duct leakage testing, insulation and design
01/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
01/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
01/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
01/22/2026
Special inspection requirement — Maintenance information
01/22/2026
Special inspection requirement — Shutoff dampers
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/22/2026
Special inspection requirement — Concrete - Cast-In-Place
01/22/2026
Special inspection requirement — Masonry
01/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/22/2026
Special inspection requirement — Structural Steel - Details
01/22/2026
Special inspection requirement — Structural Steel - High Strength Bolting
01/22/2026
Special inspection requirement — Structural Steel - Welding
01/22/2026
Special inspection requirement — Subgrade Inspections
01/22/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
01/22/2026
Special inspection requirement — Energy Code Compliance Inspections
01/22/2026
Special inspection requirement — Insulation placement and R values
01/22/2026
Special inspection requirement — Electrical motors and elevators
12/08/2025
Boiler inspection report filed
Initial · defects found · Accepted
11/05/2025
E-21-01: Failed to provide and/or maintain required electrical devices/equipment and/or allowed electrical hazards to exist, in violation of FC605.1.
FDNY_ORDER violation · closed
11/05/2025
HK-1: Allowed the storage/accumulation of combustible material, waste and/or vegetation, in violation of FC304.2.
FDNY_ORDER violation · closed
11/05/2025
GP-57: Failed to maintain walls of hallway corridors free of combustible artworks and/or decorations, in violation of FC805.1.
FDNY_ORDER violation · closed
11/05/2025
EG-21-13: Failed to maintain emergency power source for exit lighting, exit signs and/or exit directional signs in good working order, in violation…
FDNY_ORDER violation · closed
11/05/2025
EG-21-10: Failed to maintain means of egress free from obstructions or impediments, in violation of FC1027.2 and 1027.3
FDNY_ORDER violation · closed
11/05/2025
EG-21-03: Failed to maintain means of egress free from obstructions or impediments, in violation of FC1027.2 and 1027.3.
FDNY_ORDER violation · closed
11/05/2025
Special inspection requirement — Mechanical Systems
11/05/2025
Special inspection requirement — Final
10/23/2025
Elevator Category 1 inspection report filed
06/04/2025
ADM-02-03: Failed to produce approval from the Department of Buildings for design and installation of material, device, equipment, system,…
FDNY_ORDER violation · closed
06/04/2025
EG-21-13: Failed to maintain emergency power source for exit lighting, exit signs and/or exit directional signs in good working order, in violation…
FDNY_ORDER violation · closed
05/30/2025
VC19: failed to prepare/produce/submit required documentation: department of buildings certificate of compliance
FDNY_NOV violation · closed
04/28/2025
35677570Y failure to maintain building in code compliant manner:illumination for exits,exit discharges and public corridors per bc…
ECB violation · closed
02/18/2025
C-12-01: Failed to obtain and/or produce a Certificate of Fitness for installation of device, equipment, system; conducting an operation; operation…
FDNY_ORDER violation · closed
02/18/2025
LAB-21-01a: Failed to comply with the provisions of applicable codes, standards, and manufacturers specifications associated with the operation of…
FDNY_ORDER violation · closed
12/18/2024
HK-2: Failed to maintain equipment room(s) free from storage of combustible materials, in violation of FC315.2.
FDNY_ORDER violation · closed
12/18/2024
EG-24-01: Failed to provide and/or maintain required sign for means of egress, in violation of FC1027.1.
FDNY_ORDER violation · closed
12/18/2024
EG-21-10: Failed to maintain means of egress free from obstructions or impediments, in violation of FC1027.2 and 1027.3
FDNY_ORDER violation · closed
12/10/2024
Boiler inspection report filed
Initial · defects found · Accepted
06/06/2024
VC20: failed to conduct required (initial/periodic) inspection or test of water based fire protection system at premises.
FDNY_NOV violation · closed
05/13/2024
Reissue #35674693K. Exit door not self-closing. At time of my inspection, i observed at the 1ST floor main entrance smoke door not working…
ECB violation · open
09/26/2023
Boiler inspection report filed
Initial · no defects · Accepted
04/07/2023
Reissue #35636348M exit door not self-closing.noted:at main entrance 3 door at 1ST fl smoke door next to rm 111, smoke door by exit 2 4TH fl smoke…
ECB violation · closed
04/07/2023
Failure to maintain building in code-compliant manner.illumination for exits,exit discharges & public corridors per 1006.1; 27-381…
ECB violation · closed
04/07/2023
Reissue #35636347K failure to maintain building in code-compliant manner.noted:classroom doors at rm 342, 335, 325, 320 & 255 do not close…
ECB violation · closed
04/07/2023
Reissue #35636349Y failure to maintain building in code-compliant manner.noted:at cellar level electrical rm with excessive storage of misc items…
ECB violation · closed
03/20/2023
Closed: Elevator: elevatorrequired (DOB violation)
DOB violation · closed on the city's record
01/19/2023
Filed — Alteration
DOOR UPGRADE, NEW CONCRETE PADS & CURBS, REGRADE FLOOR WITH CONCRETE SLAB, EXTEND AUDITORIUM STAGE WITH REINFORCED CONCRETE AND COLD FORM STEEL POSTS. EXTEND ROOM 141 STAIRS WITH CONCRETE AND NEW HANDRAILS, AND BUILD OUT WALL. NEW FINISHES.
B00674737-P1
01/19/2023
Special inspection requirement — Structural Cold-Formed Steel
Asma Hashmi
01/19/2023
Special inspection requirement — Post-installed Anchors
Asma Hashmi
01/19/2023
Special inspection requirement — Structural Steel - Details
01/19/2023
Special inspection requirement — Final
Asma Hashmi
06/17/2022
Boiler inspection report filed
Initial · defects found · Accepted
Latest 60 of 152 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—Varsity Plumbing and Heating—
BIS—Gridspan—
BIS—Gridspan—
BIS—Gridspan—
BIS—Kanta Electric—
BIS—R.A.M.S. Mechanical—
BIS—R.A.M.S. Mechanical—
BIS—Adam's European Contracting—
BIS—Adam's European Contracting—
BIS—R.A.M.S. Mechanical—
BIS—R.A.M.S. Mechanical—
BIS—R.A.M.S. Mechanical—
BIS—R.A.M.S. Mechanical—
BIS—Chapman & Evans Contracting—
BIS—Adam's European Contracting—
BIS—Adam's European Contracting—
BIS—Adam's European Contracting—
BIS—R.A.M.S. Mechanical—
BIS—Lafata Corallo P & H—
BIS—R.A.M.S. Mechanical—
BIS—Adam's European Contracting—
BIS—Adam's European Contracting—
BIS—Adam's European Contracting—
BIS—Adam's European Contracting—
BIS—Robert S. Interiors—
BIS—CC Controlled Plumbing Co—
BIS—B.G. National P & H—
BIS—BG National Plumbing & Heating—
BIS—BG National Plumbing & Heating—
BIS—BG National Plumbing & Heating—
BIS—BG National PL & Heating—
BIS—BG National PL & Heating—
BIS—BG National PL & Heating—
BIS—Doriel Scaffolding—
BIS—Peter Agliardo, JR—
BIS—Keyspan Energy Associates—
BIS—Doriel Scaffolding—
BIS—Doriel Scaffolding—
BIS—A Berwind Plumbing & Heating Co—
BIS—Emb Contracting—
+ 7 more permits on file
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/31/2026B00674737-P1Request the plans ↗
08/15/2026B01314055-S1Request the plans ↗
08/15/2026B01314055-S2Request the plans ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
04/01/2009320000048Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
03/27/2009320000048Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/31/2026B00674737-P1Open ↗
08/31/2026B00674737-I1Open ↗
08/18/2026B01314055-S2Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
03/04/2011320000048Open ↗
03/04/2011320000048Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/27/2009320000048Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/27/2009320000048Open ↗
▸Trade Schedules & Equipment2
▸BISSELF-CERT PLUMBING NOTICE1
07/14/2009320000048Open ↗
▸BISSCHEDULE B - PLUMBING1
03/27/2009320000048Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/27/2009320000048Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/31/2026B00674737-P1Open ↗
08/15/2026B01314055-S1Open ↗
08/15/2026B01314055-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)5
08/31/2026B00674737-P1Open ↗
08/15/2026B00674737-I1Open ↗
08/13/2026B01314055-S2Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/04/2011320000048Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/27/2009320000048Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/04/2011320000048Open ↗
03/27/2009320000048Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/27/2009320000048Open ↗
▸Other Documents5
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal5
08/31/2026B00674737-P1Open ↗
08/15/2026B00674737-I1Open ↗
08/13/2026B01314055-S2Open ↗
Showing 3 of 5 on file for this type