← Back
Miscellaneous commercial condo
Fordham-tremont Comm Mntl Health Center
2021 GRAND CONCOURSE · BIN 2007694
💬 Discuss this project
1927Year Built
9Stories
R5Building Class
R8Zoning
53,883 sfGross Floor Area
12Units
LL97 Covered9 Open Violations 7 unresolved · 2 paperwork only ▸FISP: SWARMP
Miscellaneous commercial condo · Owner of record: BST 2021 GRAND CONCOURSE OWNER LLC · 6,625 sf lot · 8.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
Floor 9Under Construction30p · 1 filing · 20 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4Under Construction9p · 1 filing · 12 docs
Floor 3
Floor 2Under Construction15p · 1 filing · 9 docs
Floor 110p · 1 filing · 4 docs
Cellar1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VERV CAPITAL1109/13/2026
SCHUR MANAGEMENT807/08/2026
GARA REALTY COMPANY1503/22/2026
BST 2021 GRAND CONCOURSE OWNER803/22/2026
METRO CONTRACTING INC303/21/2026
HEALTH INSURANCE PLAN103/21/2026
SCHUR REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CS BRIDGE CORPGeneral Contractor807/08/2026
ZE CONTRACTING INCGeneral Contractor303/21/2026
K-FOUR CONSTRUCTION CORPGeneral Contractor207/08/2026
CLUNE CONSTRUCTION CO LPGeneral Contractor207/08/2026
AQUA PLUMBING & HTNG CORPPlumbing207/08/2026
WIESLAW MAKSIMElectrical103/21/2026
CAPITOL FIRE SPRINKLER COFire Protection107/16/2026
LIVOTI ENTERPRISE LLCGeneral Contractor107/08/2026
E.C. ELECL CONTRACTOR INCElectrical103/22/2026
BYPASS MECHANICAL CORPPlumbing107/22/2026
RATHDURAGE, DAMITHElectrical103/21/2026
RICOTTA, THOMASElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHERICO KING ARCHITECT PC5674108/21/2026
GOLDMAN COPELAND ASSOCIAT2826106/05/2026
JAMES JH CHAI & ASSOCIATE6481706/05/2026
R MARSAC CONSULTING LLC329103/23/2022
Building Lifecycle
All (177)Filed (17)Permit Issued (14)Signed Off (4)Facade (FISP) (12)Violation (60)Inspection (2)Objection (38)Special Inspection (30)
08/21/2026
Filed — Alteration
Proposed to renovate existing commercial space on 9th floor (West side space). Install non load bearing partitions, ceiling, and finishes. No change in use, egress, nor occupancy under this application.
X01447102-I1
08/21/2026
Special inspection requirement — Metering
LAWRENCE MAREK
08/21/2026
Special inspection requirement — Maintenance information
LAWRENCE MAREK
08/17/2026
Special inspection requirement — Interior lighting power
LAWRENCE MAREK
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
LAWRENCE MAREK
08/17/2026
Special inspection requirement — Final
LAWRENCE MAREK
08/17/2026
Special inspection requirement — Lighting controls
LAWRENCE MAREK
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
LAWRENCE MAREK
08/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/20/2026
Permit issued — Plumbing
X01388776-S1-PL
07/15/2026
Permit issued — Sprinklers
X01388776-S3-EW-SP
07/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2026
Permit issued — General Construction
X01388776-I1-GC
06/05/2026
Filed — Alteration
Subsequent filing SP work for modification of SP heads at Suite 901 , no change in use, egress or occuancy
X01388776-S3
06/05/2026
Permit issued — Mechanical Systems
X01388776-S2-MS
06/02/2026
Permit issued — Plumbing
X01390943-S1-PL
05/26/2026
Permit issued — General Construction
X01390943-I1-GC
05/19/2026
Filed — Alteration
PLUMBING WORK FOR MEDICAL OFFICE AT 2ND FLR; NO CHANGE USE, EGRESS OR OCCUPANCY
X01390943-I1
05/19/2026
Filed — Alteration
PLUMBING WORK FOR MEDICAL OFFICE AT 2ND FLR; NO CHANGE USE, EGRESS OR OCCUPANCY
X01390943-S1
05/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joon Ho Chai
05/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joon Ho Chai
05/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Joon Ho Chai
05/19/2026
Special inspection requirement — Maintenance information
Joon Ho Chai
05/11/2026
Filed — Alteration
Subsequent filing SP work for modification of SP heads at Suite 901 , no change in use, egress or occuancy
X01388776-S2
05/11/2026
Filed — Alteration
Subsequent filing SP work for modification of SP heads at Suite 901 , no change in use, egress or occuancy
X01388776-S1
05/07/2026
Filed — Alteration
Subsequent filing SP work for modification of SP heads at Suite 901 , no change in use, egress or occuancy
X01388776-I1
05/07/2026
Special inspection requirement — Ventilation and air distribution system
Joon Ho Chai
05/07/2026
Special inspection requirement — Duct leakage testing, insulation and design
Joon Ho Chai
05/06/2026
Special inspection requirement — Mechanical Systems
Joon Ho Chai
05/06/2026
Special inspection requirement — Sprinkler Systems
DANIEL COLOMBINI
05/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Joon Ho Chai
05/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joon Ho Chai
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joon Ho Chai
05/06/2026
Special inspection requirement — Final
JIN WOO LEE
04/16/2026
Permit issued — Plumbing
X01143109-S1-PL
04/16/2026
Special inspection requirement — Lighting controls
Joon Ho Chai
04/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joon Ho Chai
04/16/2026
Special inspection requirement — Final
JIN WOO LEE
04/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Joon Ho Chai
04/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
Joon Ho Chai
04/16/2026
Special inspection requirement — Interior lighting power
Joon Ho Chai
03/19/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
02/20/2026
Permit issued — General Construction
X01143109-I1-GC
02/04/2026
Objection raised — Zoning
02/04/2026
Objection raised — Other
02/04/2026
Objection raised — Scope
02/04/2026
Objection raised — Energy
01/26/2026
Objection raised — Zoning
01/26/2026
Objection raised — Mechanical
01/26/2026
Objection raised — Mechanical
01/22/2026
Filed — Alteration CO
Renovate & change use of ext'g 9th Fl space from treatment health care facility to 2 medical office with proposed interior renovation to replace all non-load bearing walls, ceiling, & floor finishes. No change in egress, const. class, bld'g bulk nor heigh
X01336091-I1
01/08/2026
Filed — Alteration
MECHANICAL WORK FOR EXISTING DOCTOR'S OFFICES AND NURSES RESTROOMS AT 4TH FLOOR ; NO CHANGE TO USE, EGRESS OR OCCUPANCY
X01143109-S2
01/08/2026
Special inspection requirement — Maintenance information
01/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
01/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
01/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
01/06/2026
Objection resolved — Addressed
01/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBYPASS MECHANICAL CORP07/20/2026
DOB NOWSprinklersPermit IssuedCAPITOL FIRE SPRINKLER CO07/15/2026
DOB NOWGeneral ConstructionPermit IssuedCLUNE CONSTRUCTION CO LP06/09/2026
DOB NOWMechanical SystemsPermit IssuedCLUNE CONSTRUCTION CO LP06/05/2026
DOB NOWPlumbingPermit IssuedAQUA PLUMBING & HTNG CORP06/02/2026
DOB NOWGeneral ConstructionPermit IssuedK-FOUR CONSTRUCTION CORP05/26/2026
DOB NOWPlumbingPermit IssuedAQUA PLUMBING & HTNG CORP04/16/2026
DOB NOWGeneral ConstructionPermit IssuedK-FOUR CONSTRUCTION CORP02/20/2026
DOB NOWGeneral ConstructionSigned-offZE CONTRACTING INC04/10/2024
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP06/02/2022
DOB NOWAntennaSigned-offLIVOTI ENTERPRISE LLC04/08/2022
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP06/23/2020
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP06/09/2020
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP04/26/2019
BISOTISSUEDAG CONSTRUCTION GROUP INC10/01/2021
BISOTISSUEDRSG CONSTRUCTION CORP11/02/2020
BISOTISSUEDRSG CONSTRUCTION CORP04/10/2020
BISOTISSUEDDPC NEW YORK, INC05/14/2015
BISEQISSUEDARSENAL SCAFFOLD INC04/10/2015
BISOTISSUEDDPC NEW YORK, INC01/29/2014
BISEQISSUEDMETRO CONTRACTING NY, INC.07/11/2013
BISOTISSUEDDPC NEW YORK, INC06/28/2013
BISEQISSUEDMETRO CONTRACTING NY, INC.05/15/2013
BISOTISSUEDD.P. CONSULTING, CORP05/03/2013
BIS—ISSUEDSMC GENERAL CONTRACTING I03/21/2013
BIS—ISSUEDSMC GENERAL CONTRACTING I04/12/2012
BIS—ISSUEDSMC GENERAL CONTRACTING I08/12/2011
BISEQISSUEDCOLGATE SCAFFOLDING06/30/1998
BISFPISSUEDFIRE FOE CORP.09/01/1993
1 project · most recent 01/08/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/08/2026Permit IssuedK-FOUR CONSTRUCTION CORPHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAMHZ2-U1 48,000 BTU · Condensing Unit ×3
1 project · most recent 06/05/2026
FiledStatusContractorScope
06/05/2026Permit IssuedCAPITOL FIRE SPRINKLER CO—
3 projects · most recent 06/05/2026
Water/Sanitary
FiledStatusContractorScope
06/05/2026Permit IssuedPLUMBING WORKS CORPWater/Sanitary
05/19/2026Permit IssuedAQUA PLUMBING & HTNG CORPWater/Sanitary
01/08/2026Permit IssuedAQUA PLUMBING & HTNG CORPWater/Sanitary
8 projects · most recent 08/05/2026
General Wiring
FiledStatusContractorScope
08/05/2026Permit IssuedGATSONS ELECTRIC INCGeneral Wiring
07/16/2026Permit IssuedEPIC ELECTRIC INCGeneral Wiring
06/21/2026Permit IssuedOMD ELECTRICAL CORPGeneral Wiring
08/10/2023Permit IssuedE.C. ELECL CONTRACTOR INCGeneral Wiring
08/04/2022CompleteMARTINEZ ELECTRICAL CONT—
10/05/2021CompleteDENMAR ELECTRIC CORPGeneral Wiring
06/17/2021Permit IssuedCAPUTEK ELEC'L SERVICES,—
04/24/2019CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/14/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
08/21/2026MeteringLAWRENCE MAREKenergy_progress
08/21/2026Maintenance informationLAWRENCE MAREKenergy_progress
08/17/2026Interior lighting powerLAWRENCE MAREKenergy_progress
08/17/2026Energy Code Compliance InspectionsLAWRENCE MAREKprogress
08/17/2026FinalLAWRENCE MAREKprogress
08/17/2026Lighting controlsLAWRENCE MAREKenergy_progress
08/17/2026Fire-Resistant Penetrations and JointsLAWRENCE MAREKspecial
05/19/2026HVAC-R and service water piping design and insulationJoon Ho Chaienergy_progress
05/19/2026Fire-Resistant Penetrations and JointsJoon Ho Chaispecial
05/19/2026Energy Code Compliance InspectionsJoon Ho Chaiprogress
05/19/2026Maintenance informationJoon Ho Chaienergy_progress
05/07/2026Ventilation and air distribution systemJoon Ho Chaienergy_progress
05/07/2026Duct leakage testing, insulation and designJoon Ho Chaienergy_progress
05/06/2026Mechanical SystemsJoon Ho Chaispecial
05/06/2026Sprinkler SystemsDANIEL COLOMBINIspecial
05/06/2026Energy Code Compliance InspectionsJoon Ho Chaiprogress
05/06/2026HVAC-R and service water piping design and insulationJoon Ho Chaienergy_progress
05/06/2026Fire-Resistant Penetrations and JointsJoon Ho Chaispecial
05/06/2026FinalJIN WOO LEEprogress
04/16/2026Lighting controlsJoon Ho Chaienergy_progress
04/16/2026Fire-Resistant Penetrations and JointsJoon Ho Chaispecial
04/16/2026FinalJIN WOO LEEprogress
04/16/2026Energy Code Compliance InspectionsJoon Ho Chaiprogress
04/16/2026Fire-Resistance Rated ConstructionJoon Ho Chaiprogress
04/16/2026Interior lighting powerJoon Ho Chaienergy_progress
Latest 25 of 42.
▾Documents — 213 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch14
08/22/2026X01447102-I1Request digital key ↗
08/22/2026X00953838-I1Request digital key ↗
08/22/2026X00953838-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
08/26/2026X00158449-I1Request digital key ↗
08/24/2026X00361244-I1Request digital key ↗
08/24/2026X00361244-P1Request digital key ↗
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION16
12/07/2022240294828Open ↗
10/03/2022240294828Open ↗
03/24/2022220745665Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION11
10/01/2021240294828Open ↗
04/10/2020240270103Open ↗
04/11/2015220450651Open ↗
Showing 3 of 11 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
08/22/2014220061224Open ↗
▸Seals & Professional Certifications64
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/24/2026X00361244-I1Open ↗
08/24/2026X00696218-I1Open ↗
08/22/2026X01447102-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026X01447102-I1Open ↗
09/23/2026X01447102-I1Open ↗
09/01/2026X01143109-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
04/12/2016220450651Open ↗
08/11/2015240094107Open ↗
08/10/2015240094107Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026X01447102-I1Open ↗
09/02/2026X01388776-S3Open ↗
09/02/2026X01388776-S3Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
11/18/2020240294828Open ↗
03/31/2020240270103Open ↗
04/11/2015220450651Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
11/18/2020240294828Open ↗
03/31/2020240270103Open ↗
03/27/2015240094107Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
11/18/2020240294828Open ↗
03/31/2020240270103Open ↗
05/15/2013240025432Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/11/2015220450651Open ↗
08/19/2011220136430Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/19/2011220136430Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
03/25/2015220149569Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
05/07/2010220061224Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026X01336091-I1Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/22/2026X01447102-I1Open ↗
08/18/2026X01143109-I1Open ↗
08/18/2026X01143109-S2Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
11/19/2011220149569Open ↗
08/19/2011220136430Open ↗
05/07/2010220061224Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/18/2020240294828Open ↗
03/27/2015240094107Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
09/23/2020240270103Open ↗
03/31/2020240270103Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/02/2022240294828Open ↗
10/01/2021240294828Open ↗
08/23/2021240270103Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/11/2015240094107Open ↗
03/18/2015220136430Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/18/2020240294828Open ↗
03/31/2020240270103Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
08/10/2015240094107Open ↗
03/18/2015220136430Open ↗
▸BISNYCECC ANALYSIS2
11/18/2020240294828Open ↗
03/31/2020240270103Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/07/2022240294828Open ↗
08/23/2021240270103Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/07/2022240294828Open ↗
▸BISLIGHTING CONTROLS1
12/07/2022240294828Open ↗
▸BISTECHNICAL REPORT: ENERGY1
08/19/2011220136430Open ↗
▸BISINTERIOR LIGHTING POWER1
12/07/2022240294828Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY9
10/02/2022240294828Open ↗
10/01/2021240294828Open ↗
08/23/2021240270103Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: PHOTOLUMINESCENCE1
05/17/2016220149569Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/07/2022240294828Open ↗
▸Approvals, Objections & Sign-offs19
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
12/12/2022240294828Open ↗
08/23/2021240270103Open ↗
07/18/2016220149569Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/30/2020240270103Open ↗
04/12/2016220450651Open ↗
04/11/2015220450651Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
07/15/2010220061224Open ↗
05/07/2010220061224Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
08/19/2011220136430Open ↗
05/07/2010220061224Open ↗
▸BISFINAL1
12/07/2022240294828Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT12
08/23/2021240270103Open ↗
08/18/2021240270103Open ↗
11/18/2020240294828Open ↗
Showing 3 of 12 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
04/01/2022220745665Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/07/2022240294828Open ↗
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET5
03/24/2022220745665Open ↗
04/11/2015220450651Open ↗
11/19/2011220149569Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
12/12/2022240294828Open ↗
12/07/2022240294828Open ↗
04/28/2022220745665Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
11/18/2020240294828Open ↗
03/31/2020240270103Open ↗
03/27/2015240094107Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
09/23/2020240270103Open ↗
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/01/2022220745665Open ↗
04/01/2022220745665Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
04/28/2022220745665Open ↗
▸BISPLOT DIAGRAM1
05/07/2010220061224Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026X01336091-I1Open ↗