HPD05/19/2004SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING WINDOW GLASS-- ALL ROOMS-- 3RD STY APT.
HPD05/19/2004SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING WINDOW GLASS-- ALL ROOMS-- 2ND STY APT.
HPD05/19/2004SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE CHARRED CEILING --BEAMS-2ND ROOM FROM REAR--2ND STY APT.
HPD05/19/2004SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE CHARRED WOOD ROOF BEAMS-- ROOF REAR.
HPD05/19/2004SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE CHARRED WOOD STUDS & SIDING ---2ND & 3RD LEVELS AT BUILDING REAR.
DOB10/12/2001WORK WITHOUT A PERMIT: WORK NOTED: HAVING RENOVATED ENTIRE BUILDING BEFORE FIRST OBTAINING APPROVAL APPLICATION #301226028 ALT (1) 301138122 ALT(2) FILED 925 01 & 9/28/00 DISSAPPROVED ALSO NB APPLICATION #301132995 PRE FILED 022001 NO PERMIT OBTAIN. REMEDY: STOP.ALL WORK OBTAIN APPROVAL AND PERMIT. CALL FOR INSP.(718) 802-3686
DOB10/12/2001ECB
DOB09/20/2001ECB
DOB09/20/2001ECB
DOB09/20/2001WITHOUT A PERMIT: WORK NOTED: NEW SERVICE ENTRANCE INSTALLED AT REAR. ALSO FRONT PORCH CONSTRUCTED REMEDY: STOP ALL WORK OBTAIN APPROVALS AND PERMITS
DOB07/23/2001V-DOB VIOLATION - ACTIVE
DOB07/23/2001V-DOB VIOLATION - ACTIVE
DOB07/23/2001WORK W/O PERMIT. NOTED: FROM CELLAR TO 2ND FLOOR GUT REHAB W/INSTALATI ON OF NEW PLUMBING RUFFING, NEW ELECTRIC, NEW CENTRAL A/C. NEW STAIRS INSTALLED FROM 1ST TO 2ND FLOORS, NO STAIRS TO CELLAR(REMOVED) REMEDY: STOP ALL WORK! OBTAIN ALL NECESARY PERMITS AND CALL DEPT OF BUILDINGS AT 718-802-3685 BEFORE RETURNING TO WORK
DOB06/07/2001V-DOB VIOLATION - ACTIVE
DOB06/07/2001WORK WITHOUT A PERMIT. WORK NOTED: IN THAT CELLAR HAVE BEEN EXCAVATED APPROX. 3 FEET. ALSO DEMOLITION THROUGHOUT CELLAR. PARTIAL DEMO AT FIR ST AND 2ND FLOOR. NEW INTERIOR PARTITION CONSTRUCTED. NEW PLUMBING AND ELECTRICAL WORK THROUGHOUT. NEW S/R WORK AND DROP CELINGS REMEDY: STOP AL WORK. OBTAIN NECESARY PERMITS. CALL FOR INSPECTION AT
ECB10/12/2001FAILURE TO PROVIDE APPROVED PLANS AT PREMISES AT TIME OF INSPECITON. AT TIME OF INSPECTION, BUILDING RENOVATED APPROX 95% COMPLETED. REAR STEARS CONSTRUCTION AND WORK GOING ON IN CELLAR AT TIME OF INSPECTION. RNothing owed — awaiting certificate of correction
ECB10/12/2001WORK WITHOUT A PERMIT. WORK NOTED: HAVING RENOVATED ENTIRE BUILDING BOFORE FIRST OBTAINING APPROVAL APPLICATION #30126028 ALT1, 301138122 ALT2, FILED 92501 AND 9/28/00 DESAPPROVED ALSO NB APPLICATION #301132995Nothing owed — awaiting certificate of correction
ECB09/20/2001ALTERED BUILDING OCCUPED WITHOUT A VALID CERTIFICATE OF OCCUPANCY. JOB # 301226028 FILED TO CONVERT 2 FAMILIES TO 1 FAMILY DISAPPROVED 8/31/01. AT TIME OF INSPECTION BUILDING RENOVATED AND OCCUPIED NO C OF O ISNothing owed — awaiting certificate of correction