← Back
Multi-story retail building (2+)
2024 WILLIAMSBRIDGE ROAD
BRONX · Morris Park · BIN 2049203
💬 Discuss this project
1949Year Built
2Stories
K2Building Class
R5DZoning
12,600 sfGross Floor Area
7Units
17 Open Violations 16 unresolved · 1 paperwork only ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: W&P ASSOCIATES, LLC · 7,500 sf lot · 1.68 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 12 docs
Floor 11p · 1 filing · 12 docs
Cellar1p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
W & P ASSOCIATES LLC1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LMDARCHITECT, PC.404/14/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KA&C MECH LLCPlumbing107/08/2026
Building Lifecycle
All (29)Filed (4)Permit Issued (1)Signed Off (1)Violation (19)Inspection (4)
05/19/2025
Signed off — Alteration
Subsequent filing to amend. PL riser diagram and gas meter location requested by NYC DOB PL inspector. No change in Occupancy Use or egress. Initial filing filed as legalization filing for this work have already been paid in this initial filing.
X01146303-I1
04/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/14/2025
Filed — Alteration
Subsequent filing to amend. PL riser diagram and gas meter location requested by NYC DOB PL inspector. No change in Occupancy Use or egress. Initial filing filed as legalization filing for this work have already been paid in this initial filing.
X01146303-P1
04/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/25/2025
Filed — Alteration
Subsequent filing to amend. PL riser diagram and gas meter location requested by NYC DOB PL inspector. No change in Occupancy Use or egress. Initial filing filed as legalization filing for this work have already been paid in this initial filing.
X01146303-S3
03/18/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/07/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/24/2025
Permit issued — Plumbing
X01146303-I1-PL
01/04/2025
Filed — Alteration
Subsequent filing to amend. PL riser diagram and gas meter location requested by NYC DOB PL inspector. No change in Occupancy Use or egress. Initial filing filed as legalization filing for this work have already been paid in this initial filing.
X01146303-S2
12/03/2024
Filed — Alteration
Subsequent filing to amend. PL riser diagram and gas meter location requested by NYC DOB PL inspector. No change in Occupancy Use or egress. Initial filing filed as legalization filing for this work have already been paid in this initial filing.
X01146303-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/03/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/26/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/05/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/01/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/08/2010
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/14/2010
Violation issued (ECB, closed)
Elevators
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/07/2000
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/1999
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/16/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/01/1995
Violation issued (ECB, open)
Construction
06/09/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/23/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKA&C MECH LLC02/24/2025
BIS—ISSUEDSPACE SIGN & AWNING CORP.02/24/1995
1 project · most recent 04/14/2025
Gas
FiledStatusContractorScope
04/14/2025Signed-offKA&C MECH LLCGas
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/07/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026X01146303-I1Request digital key ↗
08/19/2026X01146303-P1Request digital key ↗
08/19/2026X01146303-S3Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026X01146303-I1Open ↗
08/19/2026X01146303-P1Open ↗
08/19/2026X01146303-S3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWOER: Notice to Proceed3
08/13/2026X01146303-S2Open ↗
08/13/2026X01146303-I1Open ↗
08/13/2026X01146303-S3Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026X01146303-I1Open ↗