2025 EAST 1ST STREET
BROOKLYN · Gravesend (East)-Homecrest · BIN 3191673
💬 Discuss this project
1925Year Built
3Stories
A7Building Class
R3-1Zoning
5,720 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Mansion type or town house · 4,400 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Floor 317p · 2 filings · 20 docs
Floor 217p · 2 filings · 20 docs
Floor 118p · 2 filings · 20 docs
Cellar20p · 2 filings · 20 docs
Site & exterior16p · 4 filings · 20 docs
Filed — no permit issued22p · 3 filings · 10 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/11/2018$3.1M—— → —$542/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WARREN MEISTER ARCHITECTS, PC708/28/2023
LAURENCE BRODSKY ARCHITECT, P.C.111/16/2020
BGM ENGINEERING506/09/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP1803/21/2026
EXPEDIA BUILDING SOLUTION103/21/2026
ISHAC DESIGN ARCHITECTS203/21/2026
EYAL LEVITT ARCHITECT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M.N.C. GENERAL CONTR CORPGeneral Contractor1407/08/2026
B&B MECH PLBG & HTG LLCPlumbing307/08/2026
ISHAC DESIGNGeneral Contractor203/22/2026
WARREN MEISTERElectrical103/21/2026
SAFETY FIRE SPRINKLER CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISHAC DESIGN ARCHITECTS P3918408/28/2023
BGM ENGINEERING, LLC1514209/22/2022
O'ROURKE ENGINEERING, LLC5873111/16/2020
Building Lifecycle
All (72)Filed (13)Permit Issued (9)Signed Off (5)Violation (17)Inspection (4)Special Inspection (24)
03/26/2025
Signed off — Alteration
B00303706-I1
03/24/2025
Signed off — Alteration
PROPOSED ACCESSORY SHED IN THE REAR YARD
B07993810-I1
03/21/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/18/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/06/2025
Signed off — Alteration
PROPOSED AC UNITS IN REAR YARD
B07999396-I1
01/28/2025
Signed off — Alteration
Amend plans to add sump pump, detention tank, area drains, BBQ , 2 boilers, Back flow preventer, plumbing fixtures
B00270217-I1
01/21/2025
Signed off — Alteration
B00270189-I1
01/21/2025
Permit issued — General Construction
B07993810-I1-GC
01/21/2025
Permit issued — Mechanical Systems
B07999396-I1-MS
08/28/2023
Filed — Alteration
Amend plans to add sump pump, detention tank, area drains, BBQ , 2 boilers, Back flow preventer, plumbing fixtures
B00270217-P7
08/24/2023
Special inspection requirement — Maintenance information
NABIL ISHAC
08/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
NABIL ISHAC
08/24/2023
Special inspection requirement — Energy Code Compliance Inspections
NABIL ISHAC
08/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NABIL ISHAC
08/24/2023
Special inspection requirement — HVAC insulation and sealing
NABIL ISHAC
04/27/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/24/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/22/2023
Permit issued — Sprinklers
B00270189-I1-EW-SP
11/29/2022
Violation issued (ECB, closed)
Construction
10/24/2022
Permit issued — Plumbing
B00270217-I1-PL
10/24/2022
Permit issued — Construction Fence
B00303706-I1-FN
09/22/2022
Filed — Alteration
PROPOSED AC UNITS IN REAR YARD
B07999396-I1
09/06/2022
Special inspection requirement — Final
RAUL VELASQUEZ MARTINEZ
09/06/2022
Special inspection requirement — Mechanical Systems
RAUL VELASQUEZ MARTINEZ
08/29/2022
Filed — Alteration
PROPOSED ACCESSORY SHED IN THE REAR YARD
B07993810-I1
08/25/2022
Special inspection requirement — Subgrade Inspections
RAUL VELASQUEZ MARTINEZ
08/25/2022
Special inspection requirement — Concrete - Cast-In-Place
RAUL VELASQUEZ MARTINEZ
08/25/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
RAUL VELASQUEZ MARTINEZ
08/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
08/25/2022
Special inspection requirement — Masonry
RAUL VELASQUEZ MARTINEZ
02/08/2022
Permit issued — Construction Fence
B00303706-I1-FN
11/10/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/26/2021
Permit issued — Plumbing
B00270217-I1-PL
09/15/2021
Violation issued (ECB, closed)
Construction
09/15/2021
Violation issued (ECB, closed)
Site Safety
09/15/2021
Violation issued (ECB, closed)
Construction
09/15/2021
Violation issued (ECB, closed)
Construction
09/15/2021
Violation issued (ECB, closed)
Construction
09/15/2021
Violation issued (ECB, closed)
Construction
09/15/2021
Violation issued (ECB, closed)
Construction
09/15/2021
Violation issued (ECB, closed)
Construction
09/15/2021
Violation issued (ECB, closed)
Site Safety
09/15/2021
Violation issued (ECB, closed)
Construction
08/10/2021
Violation issued (ECB, closed)
Construction
08/10/2021
Violation issued (ECB, closed)
Construction
08/10/2021
Violation issued (ECB, closed)
Construction
08/10/2021
Violation issued (ECB, closed)
Construction
02/10/2021
Permit issued — Construction Fence
B00303706-I1-FN
02/09/2021
Filed — Alteration
Amend plans to add sump pump, detention tank, area drains, BBQ , 2 boilers, Back flow preventer, plumbing fixtures
B00270217-P6
02/01/2021
Special inspection requirement — Fire-Resistance Rated Construction
NABIL ISHAC
02/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
NABIL ISHAC
02/01/2021
Special inspection requirement — Energy Code Compliance Inspections
NABIL ISHAC
02/01/2021
Special inspection requirement — HVAC insulation and sealing
NABIL ISHAC
02/01/2021
Special inspection requirement — Maintenance information
NABIL ISHAC
11/16/2020
Filed — Alteration
B00270189-I1
10/27/2020
Permit issued — Plumbing
B00270217-I1-PL
10/14/2020
Filed — Alteration
Amend plans to add sump pump, detention tank, area drains, BBQ , 2 boilers, Back flow preventer, plumbing fixtures
B00270217-P4
10/14/2020
Special inspection requirement — HVAC insulation and sealing
NABIL ISHAC
10/14/2020
Special inspection requirement — Maintenance information
10/14/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
NABIL ISHAC
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMNC GENERAL CONTR CORP01/21/2025
DOB NOWMechanical SystemsSigned-offMNC GENERAL CONTR CORP01/21/2025
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP04/22/2023
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC10/24/2022
DOB NOWConstruction FenceSigned-offMNC GENERAL CONTR CORP10/24/2022
DOB NOWConstruction FenceSigned-offMNC GENERAL CONTR CORP02/08/2022
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC10/26/2021
DOB NOWConstruction FenceSigned-offMNC GENERAL CONTR CORP02/10/2021
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC10/27/2020
BIS—ISSUEDM.N.C. GENERAL CONTR CORP10/18/2023
BIS—ISSUEDM.N.C. GENERAL CONTR CORP09/14/2023
BIS—ISSUEDM.N.C. GENERAL CONTR CORP06/24/2022
BIS—ISSUEDM.N.C. GENERAL CONTR CORP10/29/2021
BIS—ISSUEDM.N.C. GENERAL CONTR CORP10/30/2020
BIS—ISSUEDM.N.C. GENERAL CONTR CORP10/25/2020
BIS—ISSUEDM.N.C. GENERAL CONTR CORP03/12/2020
BISEQISSUEDFICAMO INC01/29/1998
BIS—ISSUEDFICAMO INC01/29/1998
2 projects · most recent 01/07/2021
General Wiring
FiledStatusContractorScope
01/07/2021CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
03/27/2020CompleteDB ELECTRIC LLC1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/21/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/18/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/27/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/24/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
08/24/2023Maintenance informationNABIL ISHACenergy_progress
08/24/2023Fire-Resistance Rated ConstructionNABIL ISHACprogress
08/24/2023Energy Code Compliance InspectionsNABIL ISHACprogress
08/24/2023Fire-Resistant Penetrations and JointsNABIL ISHACspecial
08/24/2023HVAC insulation and sealing NABIL ISHACenergy_progress
09/06/2022FinalRAUL VELASQUEZ MARTINEZprogress
09/06/2022Mechanical SystemsRAUL VELASQUEZ MARTINEZspecial
08/25/2022Subgrade InspectionsRAUL VELASQUEZ MARTINEZspecial
08/25/2022Concrete - Cast-In-PlaceRAUL VELASQUEZ MARTINEZspecial
08/25/2022Excavations - Sheeting, Shoring, and BracingRAUL VELASQUEZ MARTINEZspecial
08/25/2022Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
08/25/2022MasonryRAUL VELASQUEZ MARTINEZspecial
02/01/2021Fire-Resistance Rated ConstructionNABIL ISHACprogress
02/01/2021Fire-Resistant Penetrations and JointsNABIL ISHACspecial
02/01/2021Energy Code Compliance InspectionsNABIL ISHACprogress
02/01/2021HVAC insulation and sealing NABIL ISHACenergy_progress
02/01/2021Maintenance informationNABIL ISHACenergy_progress
10/14/2020HVAC insulation and sealing NABIL ISHACenergy_progress
10/14/2020Maintenance information—energy_progress
10/14/2020Fire-Resistant Penetrations and JointsNABIL ISHACspecial
10/14/2020Energy Code Compliance Inspections—progress
10/14/2020Fire-Resistance Rated Construction—progress
06/09/2020Structural Stability – Alterations of existing buildings—special
06/09/2020Final—progress
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch - Structural5
09/02/2026B00262838-I1Request digital key ↗
09/02/2026B00327774-I1Request digital key ↗
09/02/2026B00327760-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00270217-P7Request digital key ↗
09/02/2026B00270217-I1Request digital key ↗
09/02/2026B00270217-P4Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch2
08/28/2026B07993810-I1Request digital key ↗
08/28/2026B07999396-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00303706-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00270189-I1Request digital key ↗
▸Applications & Permits4
▸BISBPP-5 - Authorization to the Department of Transportation2
04/11/2025321993303Open ↗
04/10/2025321993303Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
04/03/2025300675286Open ↗
09/23/2019321993303Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/13/2026B00327774-P2Open ↗
08/13/2026B00327774-I1Open ↗
08/13/2026B07999396-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026B07999396-I1Open ↗
08/29/2026B00270217-P4Open ↗
08/26/2026B00270217-P6Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B07999396-I1Open ↗
08/28/2026B07993810-I1Open ↗
08/26/2026B00270217-P6Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸BISBPP: STREET TREES SITE PLAN1
04/10/2025321993303Open ↗
▸BISSTREET TREE CHECKLIST1
04/10/2025321993303Open ↗
▸BISSTREET TREE SIGNOFF1
05/29/2025321993303Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026B00270217-P4Open ↗
08/13/2026B00270217-P7Open ↗
08/13/2026B00270217-P6Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports1
▸BISBPP: FIELD INSPECTION1
05/30/2025321993303Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
05/13/2025321993303Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
04/21/2025321993303Open ↗
▸BISEFILING COVER SHEET1
09/23/2019321993303Open ↗
▸Other Documents5
▸BISBPP: TOPOGRAPHIC SURVEY1
04/11/2025321993303Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
05/30/2025321993303Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
04/10/2025321993303Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
05/30/2025321993303Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
04/10/2025321993303Open ↗