← Back
BuildNYC
Elevator apt, fireproof without stores
2025 SEWARD AVENUE
BRONX · Castle Hill-Unionport · BIN 2022208
💬 Discuss this project
1978Year Built
8Stories
D3Building Class
R6Zoning
221,208 sfGross Floor Area
179Units
LL97 CoveredRent Stabilized310 Active Violations 2 likely answered 4 old, status unconfirmed ▸FISP: No Report Filed
Elevator apt, fireproof without stores · Owner of record: Seward Housing · 79,118 sf lot · 2.8 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRoof antenna and battery cabinet installation3p · 4 filings · 18 docs
Filed — no permit issuedVerizon at Soundview 23p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Seward 13203/22/2026
2025 Seward Partners2903/21/2026
2025 LLC203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/10/2017$34.9M—STEWARD 2025, LLC → SEWARD HOUSING LLC$158/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
APT304/17/2023
Dewberry Engineers107/28/2020
Tectonic Engineering107/23/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services303/21/2026
CCM Services Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Amp CommunicationsGeneral Contractor303/21/2026
Metro RF ServicesGeneral Contractor107/08/2026
Ramapo CommunicationGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Amaracon Testing & Inspec5842304/17/2023
R Marsac Consulting329107/28/2020
Tectonic Engineering Cons106107/23/2018
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
10/21/2026
Boiler inspection report filed
Initial · no defects · Accepted
08/24/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4P, 4th STORY, 2nd APARTMENT FROM…
HPD violation · open
08/24/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 8, 2nd STORY, 2nd APARTMENT FROM NORTH…
HPD violation · open
08/24/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMAL FINISH BY METHOD OF REGLAZING AT BATHTUB IN THE…
HPD violation · open
226 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offRamapo Communication11/18/2020
DOB NOWAntennaSigned-offAmp Communications05/04/2020
DOB NOWAntennaSigned-offMetro RF Services08/24/2018
BISPLISSUEDDNA Plumbing Contractors11/03/2017
BISPLISSUEDNew York Plumbing & Heating09/06/2017
BISSPISSUEDWNW & Sons Plumbing & Heating09/01/2017
BIS—ISSUEDMar Construction NY06/27/2017
BISOTISSUEDMetro RF Services06/06/2017
BISOTISSUEDRamapo Communication01/17/2017
BISOTISSUEDRamapo Communication11/28/2016
BIS—ISSUEDDavid M Construction Co11/02/2016
BISPLISSUEDFlint Mechanical06/01/2016
BISOTISSUEDGlotel05/09/2016
BISMHISSUEDG & G Mechanical Group02/12/2016
BISOTISSUEDRC3 Electric12/10/2015
BISOTISSUEDRC3 Electric11/04/2015
BIS—ISSUEDDavid M Construction Co09/24/2015
BISEQISSUEDSMJ Construction Management08/18/2015
BIS—ISSUEDDavid M Construction Co06/12/2015
BISPLISSUEDFlint Mechanical06/09/2015
BISOTISSUEDRC3 Electric02/20/2015
BIS—ISSUEDHigh Power Construction10/20/2014
BISPLISSUEDNew York Standard Mechanical10/03/2014
BISOTISSUEDVertical Solutions02/26/2013
BISOTISSUEDOdyssia Global Commercial01/14/2013
BIS—ISSUEDHigh Power Construction12/12/2012
BISOTISSUEDJ.A. Lee Electric11/03/2011
BISOTISSUEDSkyfield Partners05/27/2011
BISOTISSUEDSkyfield Partners04/29/2011
BISOTISSUEDSquan Construction Services07/09/2010
BISOTISSUEDAntelex Wireless03/10/2010
BISPLISSUEDMetropolitan Heat & Power Co09/23/2009
BISBLISSUEDMetropolitan HT & Power Co09/23/2009
BISPLISSUEDWilliam C. Gerakaris P&H06/04/2008
BISMHISSUEDFast Track Electric04/29/2008
BISOTISSUEDFast Track Electric04/18/2008
BISOTISSUEDBci Communications01/02/2007
BISOTISSUEDBci Communications11/30/2006
BISMHISSUEDInsite Communications Group05/18/2004
BISPLISSUEDUnflat & Associates03/20/2002
+ 1 more permits on file
2 projects · most recent 03/06/2020
General Wiring
FiledStatusContractorScope
03/06/2020CompleteFqe ElectricGeneral Wiring
02/12/2020CompleteFqe ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/04/2023Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
04/04/2023Tenant Protection Plan ComplianceCONNIE PISANIspecial
01/26/2023Tenant Protection Plan ComplianceCONNIE PISANIspecial
12/01/2022Mechanical SystemsCONNIE PISANIspecial
12/01/2022FinalScott Chasseprogress
437 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account