Elevator apt, semi-fireproof without stores
2026 HONEYWELL AVENUE
BRONX · West Farms · BIN 2130822
💬 Discuss this project
2024Year Built
—Stories
D1Building Class
R7-1Zoning
66,769 sfGross Floor Area
59Units
Rent Stabilized39 Open Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: HONEYWELL GARDENS LLC · 8,598 sf lot · 7.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof2p · 1 filing
Floor 71 filing
Floor 61 filing
Floor 51 filing
Floor 41 filing
Floor 31 filing
Floor 21 filing
Floor 12 filings
Site & exterior3 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BOINEN5107/08/2026
HONEYWELL GARDENS LLC703/22/2026
BOINEM403/21/2026
494 JACKSON303/22/2026
CONSOLIDATED SCAFFOLDING INC.203/21/2026
AQUINAS HOUSING203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/04/2021$480K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P GEORGOPOULOS ARCHITECT PC2107/31/2025
PAUL G. JONES, P.E.303/20/2024
H & O ENGINEERING, DPC109/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITING 4 U2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TARGET CONSTRUCTION LLCGeneral Contractor1307/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor707/08/2026
ENDRE BANYAElectrical603/21/2026
TFK ELECTRIC CORP 004849General Contractor603/22/2026
YATZIV CORPGeneral Contractor607/08/2026
JSB WORKS INCGeneral Contractor303/21/2026
POWER DIRECT ELECTRIC INC 005103General Contractor103/22/2026
DAVID MINZElectrical103/21/2026
A. M. PLUMBING COMPANYPlumbing107/08/2026
TFK ELECTRIC CORPElectrical103/22/2026
TOVIA WERZBERGERElectrical103/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
BOINEM LLCGeneral Contractor107/08/2026
P GEORGOPOULOS ARCHITECTGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161307/31/2025
Building Lifecycle
All (153)Filed (25)Permit Issued (20)Signed Off (11)Violation (5)Inspection (10)Objection (52)Special Inspection (30)
08/13/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
08/13/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
08/13/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
08/13/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
08/13/2025
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
08/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/13/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
08/13/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/13/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
08/13/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FAHAD FATEH
08/13/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
08/13/2025
Special inspection requirement — Air barrier continuity plan testing
FAHAD FATEH
08/13/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
08/13/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
08/13/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
08/13/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
08/13/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
07/31/2025
Filed — New Building
PROPOSED EIGHT STORY RESIDENTIAL BUILDING.
X00538598-P8
06/27/2025
Filed — New Building
PROPOSED EIGHT STORY RESIDENTIAL BUILDING.
X00538598-P7
06/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/26/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
06/26/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
06/26/2025
Special inspection requirement — Air barrier continuity plan testing
FAHAD FATEH
06/26/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
06/26/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
06/26/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FAHAD FATEH
06/26/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
06/26/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
06/26/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
06/26/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
12/30/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING NEW BUILDING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
X01003376-S1
12/30/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING NEW BUILDING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
X01003376-I1
10/30/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/28/2024
Signed off — Alteration
PLUMBING & SPRINKLER APPLICATION FILED IN CONJUNCTION WITH NB JOB #X00538598.
X00670152-I1
10/16/2024
Signed off — Alteration
MECHANICAL APPLICATION FILED IN CONJUNCTION WITH NB JOB #X00538598.
X00671820-I1
10/15/2024
Signed off — Alteration
CURB CUT APPLICATION FILED IN CONJUNCTION WITH NB JOB #X00538598.
X00606828-I1
09/29/2024
Signed off — New Building
PROPOSED EIGHT STORY RESIDENTIAL BUILDING.
X00538598-S2
09/17/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/13/2024
Filed — Alteration
PLUMBING & SPRINKLER APPLICATION FILED IN CONJUNCTION WITH NB JOB #X00538598.
X00670152-P2
09/05/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
07/29/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
07/26/2024
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
07/26/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/24/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/05/2024
Permit issued — Curb Cut
X00606828-I1-CC
07/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/03/2024
Signed off — Alteration
X00569910-I1
06/11/2024
Permit issued — Mechanical Systems
X00671820-I1-MS
06/03/2024
Signed off — New Building
PROPOSED EIGHT STORY RESIDENTIAL BUILDING.
X00538598-S3
05/29/2024
Signed off — New Building
PROPOSED EIGHT STORY RESIDENTIAL BUILDING.
X00538598-S4
05/20/2024
Objection raised — Inspections
05/20/2024
Objection resolved — Addressed
05/20/2024
Objection raised — Structural
05/20/2024
Objection resolved — Addressed
05/20/2024
Objection raised — Other
05/20/2024
Objection resolved — Addressed
05/20/2024
Objection raised — Structural
05/20/2024
Objection resolved — Addressed
Latest 60 of 153 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offTARGET CONSTRUCTION LLC07/05/2024
DOB NOWMechanical SystemsSigned-offTARGET CONSTRUCTION LLC06/11/2024
DOB NOWGeneral ConstructionPermit IssuedTARGET CONSTRUCTION LLC03/07/2024
DOB NOWGeneral ConstructionPermit IssuedTARGET CONSTRUCTION LLC02/26/2024
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING02/13/2024
DOB NOWProtection and Mechanical MethodsSigned-offCONSOLIDATED SCAFFOLDING02/13/2024
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING02/13/2024
DOB NOWSprinklersSigned-offA. M. PLUMBING COMPANY01/24/2024
DOB NOWPlumbingSigned-offA M B MECHANICAL INC01/24/2024
DOB NOWFoundationSigned-offTARGET CONSTRUCTION LLC01/09/2024
DOB NOWStructuralSigned-offTARGET CONSTRUCTION LLC01/09/2024
DOB NOWSupport of ExcavationSigned-offTARGET CONSTRUCTION LLC12/29/2023
DOB NOWConstruction FenceSigned-offTARGET CONSTRUCTION LLC10/19/2023
DOB NOWConstruction FenceSigned-offTARGET CONSTRUCTION LLC10/19/2023
DOB NOWConstruction FenceSigned-offYATZIV CORP10/05/2022
DOB NOWConstruction FenceSigned-offYATZIV CORP10/04/2022
DOB NOWFoundationSigned-offJSB WORKS INC06/10/2022
DOB NOWConstruction FenceSigned-offYATZIV CORP11/01/2021
DOB NOWConstruction FenceSigned-offYATZIV CORP10/31/2021
DOB NOWConstruction FenceSigned-offBOINEM LLC10/12/2021
8 projects · most recent 04/07/2025
General Wiring
FiledStatusContractorScope
04/07/2025CompleteTFK ELECTRIC CORPGeneral Wiring
01/17/2025CompleteTFK ELECTRIC CORP61 meters, 61 new_meters
03/22/2024CompleteTFK ELECTRIC CORPGeneral Wiring
03/18/2024CompleteTFK ELECTRIC CORP1 meters, 1 new_meters
02/19/2024CompletePOWER DIRECT ELECTRIC INC—
02/08/2024CompleteSOLAS ELECTRICAL CORP—
01/09/2024CompleteTFK ELECTRIC CORP—
12/09/2020CompleteAPPROVED ELECTRIC CORP.General Wiring
1 project · most recent 07/31/2025
Steel Concrete
FiledStatusContractorScope
07/31/2025Permit IssuedTARGET CONSTRUCTION LLCSteel, Concrete
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/30/2024Fail-Final General Construction Non-Directive 14FailView ↗
09/17/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
09/05/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
07/29/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
07/26/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
07/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/24/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/19/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 120
DateRequirementInspectorRole
08/13/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/13/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/13/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
08/13/2025Alternative Materials - OTCR Buildings Bulletin NumberFAHAD FATEHspecial
08/13/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
08/13/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
08/13/2025Fenestration areasFAHAD FATEHenergy_progress
08/13/2025Fenestration air leakageFAHAD FATEHenergy_progress
08/13/2025Exterior lighting powerFAHAD FATEHenergy_progress
08/13/2025Interior lighting powerFAHAD FATEHenergy_progress
08/13/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
08/13/2025Electrical motors and elevatorsFAHAD FATEHenergy_progress
08/13/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
08/13/2025Maintenance informationFAHAD FATEHenergy_progress
08/13/2025Air barrier continuity plan testingFAHAD FATEHenergy_progress
08/13/2025Lighting controlsFAHAD FATEHenergy_progress
08/13/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
08/13/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
06/26/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
06/26/2025Alternative Materials - OTCR Buildings Bulletin NumberFAHAD FATEHspecial
06/26/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
06/26/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/26/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
06/26/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
06/26/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
Latest 25 of 120.
▾Documents — 153 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
08/25/2026X00569936-I1Request digital key ↗
08/25/2026X00569910-I1Request digital key ↗
08/25/2026X00606828-P1Request digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION5
12/20/2023240310123Open ↗
12/19/2023240310123Open ↗
12/15/2023240310123Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
06/27/2024240310123Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026X00538598-P7Open ↗
08/13/2026X00538598-P1Open ↗
08/13/2026X00538598-P8Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026X00538598-P7Open ↗
08/13/2026X00538598-P2Open ↗
08/13/2026X00538598-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWRestrictive Declaration/Easement 22
08/13/2026X00538598-P8Open ↗
08/13/2026X00538598-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026X00538598-P8Open ↗
08/13/2026X00538598-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00538598-I1Open ↗
▸Seals & Professional Certifications57
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/25/2026X00569936-I1Open ↗
08/25/2026X00569910-I1Open ↗
08/25/2026X00606828-P1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/02/2026X00538598-S1Open ↗
09/02/2026X00538598-S1Open ↗
09/02/2026X00538598-S1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026X00538598-S1Open ↗
08/28/2026X00670152-I1Open ↗
08/28/2026X00670152-I1Open ↗
Showing 3 of 15 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/01/2021240310123Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026X00538598-I1Open ↗
08/13/2026X00538598-P8Open ↗
08/13/2026X00538598-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist5
08/13/2026X00538598-P1Open ↗
08/13/2026X00538598-I1Open ↗
08/13/2026X00538598-P8Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
06/24/2024240310123Open ↗
▸BISSTREET TREE CHECKLIST1
06/24/2024240310123Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00538598-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00538598-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00538598-I1Open ↗
▸Energy Compliance5
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026X00671820-I1Open ↗
08/13/2026X00670152-I1Open ↗
08/13/2026X00538598-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00671820-I1Open ↗
08/13/2026X00670152-I1Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT6
08/13/2026X00538598-S4Open ↗
08/13/2026X00538598-P4Open ↗
08/13/2026X00538598-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026X00538598-S2Open ↗
08/13/2026X00538598-S1Open ↗
08/13/2026X00538598-S4Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/01/2021240310123Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
08/13/2026X00538598-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026X00538598-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
11/01/2021240310123Open ↗
▸BISADDITIONAL INFORMATION1
06/27/2024240310123Open ↗
▸Other Documents16
▸DOB NOWSite Survey: Initial5
08/13/2026X00538598-P8Open ↗
08/13/2026X00538598-I1Open ↗
08/13/2026X00538598-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026X00538598-P1Open ↗
08/13/2026X00538598-P7Open ↗
08/13/2026X00538598-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00538598-S1Open ↗
08/13/2026X00538598-S2Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/27/2023240310123Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
06/27/2024240310123Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00538598-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026X00538598-I1Open ↗