2027 PALMETTO STREET · Ridgewood · BIN 4083452
💬 Discuss this project
1910Year Built
3Stories
C2Building Class
R6BZoning
5,600 sfGross Floor Area
6Units
Rent Stabilized6 Active Violations 5 unresolved · 1 paperwork only 1 likely answered 1 old, status unconfirmed ▸
Five to six families · Owner of record: 2027 Holding · 2,742 sf lot · 2.04 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 12 docs
Floor 3Under Construction15p · 2 filings · 18 docs
Floor 2Under Construction14p · 2 filings · 18 docs
Floor 1Under Construction14p · 2 filings · 18 docs
CellarUnder Construction16p · 2 filings · 18 docs
Filed — no permit issuedProposed Temporary Gate1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
60-64 Catalpa410/30/2026
Glory Homes Realty303/22/2026
2027 Holding103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/27/2025$3.4M—2027 HOLDING LLC → BF REO 3 LLC$611/sf building
09/13/2022$1.7M—MDEG LLC → 2027 HOLDING LLC$304/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Elcherbini Architect110/29/2026
Moonshine Studio210/21/2026
Syed Engineering202/21/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Testa Electric CoElectrical103/22/2026
F I ContractingGeneral Contractor110/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Syed Engineering7054202/21/2023
Building Lifecycle
10/29/2026
Filed — Alteration
Installing temp 8'-0" high construction fence. All as per plans and applications.
Q01481862-I1
10/27/2026
Atoi observed at exposure 1 of premises workers actively erecting a temporary construction fence without a DOB permit on file., obtain all permits;…
ECB violation · open
10/23/2026
Special inspection requirement — Final
Tram Pham
10/22/2026
Permit issued — General Construction
Q01470069-I1-GC
10/21/2026
Filed — Alteration
Interior demo of non-load bearing partitions. Filed in conjunction with DOBNOW Application #Q00806505-I1. No change in use, occupancy or egress. All as per plans and applications.
Q01470069-P1
71 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedF I Contracting10/22/2026
BISPLISSUEDWater Works Piping03/23/1994
BISOTISSUEDParco Home Improvement Company03/23/1994
1 project · most recent 02/21/2023
Heating and Air Conditioning Systems
FiledStatusContractorScope
02/21/2023——Heating and Air Conditioning Systems
1 project · most recent 02/21/2023
Gas Water/Sanitary
FiledStatusContractorScope
02/21/2023——Gas, Water/Sanitary
3 projects · most recent 03/14/2024
General Wiring
FiledStatusContractorScope
03/14/2024Permit IssuedFried Electric CoGeneral Wiring
09/05/2023Permit IssuedTesta Electric Co—
09/05/2023Permit IssuedTesta Electric CoGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
10/23/2026FinalTram Phamprogress
10/21/2026FinalTram Phamprogress
10/29/2023Fenestration areasRAFI HAMIDenergy_progress
10/29/2023Insulation placement and R valuesRAFI HAMIDenergy_progress
10/29/2023Fenestration air leakageRAFI HAMIDenergy_progress
10/29/2023Fenestration and door U-factor and product ratingsRAFI HAMIDenergy_progress
06/25/2023Energy Code Compliance InspectionsRAFI HAMIDprogress
06/14/2023Fire-Resistant Penetrations and JointsRAFI HAMIDspecial
04/01/2023Lighting in dwelling unitsRAFI HAMIDenergy_progress
04/01/2023Interior lighting powerRAFI HAMIDenergy_progress
04/01/2023HVAC-R and service water heating system controlsRAFI HAMIDenergy_progress
04/01/2023Lighting controlsRAFI HAMIDenergy_progress
04/01/2023HVAC-R and service water piping design and insulationRAFI HAMIDenergy_progress
04/01/2023HVAC-R and service water heating equipmentRAFI HAMIDenergy_progress
03/19/2023Fire-Resistance Rated ConstructionRAFI HAMIDprogress
01/02/2023Fire-Resistant Penetrations and JointsRAFI HAMIDspecial
01/02/2023Final—progress
01/02/2023Energy Code Compliance InspectionsRAFI HAMIDprogress
01/02/2023Mechanical SystemsRAFI HAMIDspecial
01/02/2023Heating SystemsRAFI HAMIDspecial
20 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account