← Back
Three families
2029 MULINER AVENUE
BRONX · Pelham Parkway-Van Nest · BIN 2048870
💬 Discuss this project
1925Year Built
2Stories
C0Building Class
R4-1Zoning
2,812 sfGross Floor Area
3Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 5H HOLDING LLC · 5,000 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
5H HOLDING LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/13/2018$445K—Private party → 5H HOLDING LLC$158/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ DESIGN GROUP408/22/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRISTATE BUILDINGS RENOVAGeneral Contractor303/21/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275408/22/2025
Building Lifecycle
All (38)Filed (4)Permit Issued (2)Signed Off (2)Violation (21)Inspection (5)Special Inspection (4)
04/30/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, closed)
I
09/30/2025
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES ON NEW AND EXISTING PIPING, RELOCATING TWO GAS METERS TO OSP AND ONE NEW GAS METERS, REPLACE EXISTING HWH AND BOILER WITH NEW BOILERS AND HWH.
X01113378-I1
09/30/2025
Signed off — Alteration
X01113371-I1
09/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/22/2025
Filed — Alteration
X01113371-P1
08/22/2025
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES ON NEW AND EXISTING PIPING, RELOCATING TWO GAS METERS TO OSP AND ONE NEW GAS METERS, REPLACE EXISTING HWH AND BOILER WITH NEW BOILERS AND HWH.
X01113378-P1
08/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
08/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
08/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
08/22/2025
Special inspection requirement — Final
HARI SONI
06/05/2025
Violation issued (HPD, open)
A
12/13/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/25/2024
Violation issued (HPD, closed)
I
10/02/2024
Permit issued — Plumbing
X01113378-I1-PL
10/01/2024
Permit issued — General Construction
X01113371-I1-GC
09/20/2024
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES ON NEW AND EXISTING PIPING, RELOCATING TWO GAS METERS TO OSP AND ONE NEW GAS METERS, REPLACE EXISTING HWH AND BOILER WITH NEW BOILERS AND HWH.
X01113378-I1
09/20/2024
Filed — Alteration
X01113371-I1
04/03/2024
Violation issued (HPD, open)
A
11/16/2023
Violation issued (HPD, closed)
I
03/17/2023
Violation issued (HPD, open)
A
04/21/2022
Violation issued (FDNY_ORDER, closed)
02/17/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, open)
A
04/05/2021
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, open)
A
10/28/2019
Violation issued (HPD, closed)
I
10/11/2018
Violation issued (HPD, closed)
I
11/14/2017
Violation issued (HPD, closed)
I
10/31/2016
Violation issued (HPD, closed)
I
10/05/2015
Violation issued (HPD, closed)
I
02/04/2015
Violation issued (HPD, closed)
I
05/22/2013
Violation issued (ECB, closed)
Construction
11/10/1998
Violation issued (ECB, closed)
Construction
11/10/1998
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR10/02/2024
DOB NOWGeneral ConstructionSigned-offTRISTATE BUILDINGS RENOVA10/01/2024
1 project · most recent 10/17/2024
General Wiring
FiledStatusContractorScope
10/17/2024Permit IssuedKWONG MING ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/22/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
08/22/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
08/22/2025Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
08/22/2025FinalHARI SONIprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026X01113371-I1Request digital key ↗
08/20/2026X01113371-P1Request digital key ↗
08/18/2026X01113378-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/18/2026X01113378-P1Open ↗
08/18/2026X01113378-I1Open ↗
08/13/2026X01113371-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026X01113378-I1Open ↗
08/22/2026X01113378-P1Open ↗
08/22/2026X01113371-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026X01113371-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/18/2026X01113378-P1Open ↗
08/18/2026X01113378-I1Open ↗
08/13/2026X01113371-I1Open ↗
Showing 3 of 4 on file for this type