ECB04/23/2002WORK WIHTOUT A PERMIT WORK NOTED: 2&1/2 HIGH CONCRETE BLOCK WALL IS BEING BUILT AT REAR OF THE PREMISE.SUCH WALL DOES NOT HAVE FOUNDATION SUPPORT REMEDY:STOP ALL WORK,MAKE SITE SAFE.OBTAIN ALL NECESSARY PERMITSNothing owed — awaiting certificate of correction
One family attached or semi-detached · 0.62 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.