← Back
Two family converted from one family
203 BAY 7 STREET
BROOKLYN · BIN 3168194
💬 Discuss this project
1935Year Built
2Stories
B3Building Class
R4Zoning
1,480 sfGross Floor Area
2Units
Two family converted from one family · 3,867 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/13/2022$1.3M—GOLDEN CITY 203 REALTY LLC → Private party$895/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LU ENGINEERING SERVICE PC609/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LL CUSTOM HOMES LLCGeneral Contractor603/21/2026
A&E ELECTRICAL SYSTEMS COElectrical103/22/2026
KCM PLUMBING & HEATING COPlumbing107/08/2026
M.A.C. PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397509/22/2023
Building Lifecycle
All (63)Filed (6)Permit Issued (5)Signed Off (3)Inspection (4)Objection (21)Special Inspection (24)
03/18/2024
Signed off — Alteration
PROPOSED PLUMBING WORK ON OSP, CEL, 1ST, 2ND FLOOR AND ATTIC. IN CONJUNCTION WITH GC JOB#B07997853-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B07997853-I1
02/28/2024
Signed off — Alteration
PROPOSED PLUMBING WORK ON OSP, CEL, 1ST, 2ND FLOOR AND ATTIC. IN CONJUNCTION WITH GC JOB#B07997853-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B07997853-S3
02/28/2024
Signed off — Alteration
PROPOSED PLUMBING WORK ON OSP, CEL, 1ST, 2ND FLOOR AND ATTIC. IN CONJUNCTION WITH GC JOB#B07997853-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B07997853-S4
01/16/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/06/2023
Permit issued — Plumbing
B07997853-S4-PL
11/30/2023
Permit issued — General Construction
B07997853-I1-GC-CX
11/28/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
10/02/2023
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
10/02/2023
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
10/02/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
10/02/2023
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
09/22/2023
Filed — Alteration
PROPOSED PLUMBING WORK ON OSP, CEL, 1ST, 2ND FLOOR AND ATTIC. IN CONJUNCTION WITH GC JOB#B07997853-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B07997853-P4
09/19/2023
Filed — Alteration
PROPOSED PLUMBING WORK ON OSP, CEL, 1ST, 2ND FLOOR AND ATTIC. IN CONJUNCTION WITH GC JOB#B07997853-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B07997853-P3
09/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
09/19/2023
Special inspection requirement — Structural Steel - Details
JIAN DENG
09/19/2023
Special inspection requirement — Structural Steel - High Strength Bolting
JIAN DENG
09/19/2023
Special inspection requirement — Subgrade Inspections
JIAN DENG
09/19/2023
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
09/19/2023
Special inspection requirement — Final
JIAN DENG
09/19/2023
Special inspection requirement — Fire-Resistance Rated Construction
JIAN DENG
09/19/2023
Special inspection requirement — Concrete - Cast-In-Place
JIAN DENG
09/19/2023
Special inspection requirement — Fenestration air leakage
JIAN DENG
09/19/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
09/19/2023
Special inspection requirement — Fenestration areas
JIAN DENG
09/19/2023
Special inspection requirement — Insulation placement and R values
JIAN DENG
09/19/2023
Special inspection requirement — Interior lighting power
JIAN DENG
09/19/2023
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
09/19/2023
Special inspection requirement — Structural Wood Frame
JIAN DENG
09/19/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JIAN DENG
09/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
09/19/2023
Special inspection requirement — Masonry
JIAN DENG
09/19/2023
Special inspection requirement — Structural Cold-Formed Steel
JIAN DENG
08/23/2023
Objection resolved — Resolved
08/21/2023
Objection raised — Other
08/21/2023
Objection raised — Other
08/10/2023
Filed — Alteration
PROPOSED PLUMBING WORK ON OSP, CEL, 1ST, 2ND FLOOR AND ATTIC. IN CONJUNCTION WITH GC JOB#B07997853-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B07997853-P1
06/22/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/15/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/16/2022
Permit issued — Plumbing
B07997853-S4-PL
11/30/2022
Permit issued — Construction Fence
B07997853-S3-FN
11/29/2022
Permit issued — Structural
B07997853-I1-GC-CX
11/09/2022
Objection raised — Structural
11/09/2022
Objection resolved — Addressed
11/03/2022
Filed — Alteration
PROPOSED PLUMBING WORK ON OSP, CEL, 1ST, 2ND FLOOR AND ATTIC. IN CONJUNCTION WITH GC JOB#B07997853-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B07997853-S3
11/03/2022
Filed — Alteration
PROPOSED PLUMBING WORK ON OSP, CEL, 1ST, 2ND FLOOR AND ATTIC. IN CONJUNCTION WITH GC JOB#B07997853-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B07997853-S4
10/15/2022
Objection resolved — Addressed
10/15/2022
Objection resolved — Addressed
09/22/2022
Objection resolved — Addressed
09/22/2022
Objection resolved — Addressed
09/22/2022
Objection resolved — Addressed
09/22/2022
Objection resolved — Addressed
09/22/2022
Objection resolved — Addressed
09/22/2022
Objection resolved — Addressed
09/08/2022
Objection raised — Other
09/08/2022
Objection raised — Scope
09/08/2022
Objection raised — Other
09/08/2022
Objection raised — Other
09/08/2022
Objection raised — Other
09/08/2022
Objection raised — Other
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO12/06/2023
DOB NOWGeneral ConstructionSigned-offLL CUSTOM HOMES LLC11/30/2023
DOB NOWPlumbingSigned-offM.A.C. PLUMBING, INC12/16/2022
DOB NOWConstruction FenceSigned-offLL CUSTOM HOMES LLC11/30/2022
DOB NOWStructuralSigned-offLL CUSTOM HOMES LLC11/29/2022
BISPLISSUEDSPECIALIZED PLG INC01/22/1998
BISOTISSUEDN/A01/15/1998
2 projects · most recent 06/10/2024
General Wiring
FiledStatusContractorScope
06/10/2024CompleteKWONG MING ELECTRIC INCGeneral Wiring
02/06/2024CompleteA&E ELECTRICAL SYSTEMS COGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/16/2024Pass-Final General Construction Non-Directive 14PassView ↗
11/28/2023Fail-Final General Construction Non-Directive 14FailView ↗
06/22/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
10/02/2023Fire-Resistant Penetrations and JointsJIAN DENGspecial
10/02/2023Energy Code Compliance InspectionsJIAN DENGprogress
10/02/2023HVAC-R and service water heating system controlsJIAN DENGenergy_progress
10/02/2023HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
10/02/2023HVAC-R and service water heating equipmentJIAN DENGenergy_progress
09/19/2023Structural Stability – Alterations of existing buildingsJIAN DENGspecial
09/19/2023Structural Steel - DetailsJIAN DENGspecial
09/19/2023Structural Steel - High Strength BoltingJIAN DENGspecial
09/19/2023Subgrade InspectionsJIAN DENGspecial
09/19/2023Energy Code Compliance InspectionsJIAN DENGprogress
09/19/2023FinalJIAN DENGprogress
09/19/2023Fire-Resistance Rated ConstructionJIAN DENGprogress
09/19/2023Concrete - Cast-In-PlaceJIAN DENGspecial
09/19/2023Fenestration air leakageJIAN DENGenergy_progress
09/19/2023Fenestration and door U-factor and product ratingsJIAN DENGenergy_progress
09/19/2023Fenestration areasJIAN DENGenergy_progress
09/19/2023Insulation placement and R valuesJIAN DENGenergy_progress
09/19/2023Interior lighting powerJIAN DENGenergy_progress
09/19/2023Air barrier - visual inspectionJIAN DENGenergy_progress
09/19/2023Structural Wood FrameJIAN DENGprogress
09/19/2023Exterior Insulation and Finish Systems (EIFS)JIAN DENGspecial
09/19/2023Fire-Resistant Penetrations and JointsJIAN DENGspecial
09/19/2023MasonryJIAN DENGspecial
09/19/2023Structural Cold-Formed SteelJIAN DENGspecial
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/28/2026B07997853-P4Request digital key ↗
08/28/2026B07997853-P3Request digital key ↗
08/28/2026B07997853-S4Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWRestrictive Declaration/Easement 15
08/28/2026B07997853-P4Open ↗
08/28/2026B07997853-P3Open ↗
08/28/2026B07997853-S4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/28/2026B07997853-P3Open ↗
08/14/2026B07997853-I1Open ↗
08/14/2026B07997853-P1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature14
08/24/2026B07997853-P3Open ↗
08/24/2026B07997853-P3Open ↗
08/24/2026B07997853-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/24/2026B07997853-P3Open ↗
08/24/2026B07997853-P3Open ↗
08/24/2026B07997853-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026B07997853-P3Open ↗
08/28/2026B07997853-P4Open ↗
08/28/2026B07997853-P1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026B07997853-P4Open ↗
08/28/2026B07997853-P3Open ↗
08/28/2026B07997853-S4Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/14/2026B07997853-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial3
08/28/2026B07997853-P3Open ↗
08/14/2026B07997853-I1Open ↗
08/14/2026B07997853-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/28/2026B07997853-P3Open ↗
08/14/2026B07997853-I1Open ↗
08/14/2026B07997853-P1Open ↗
▸DOB NOWPlot Diagram3
08/28/2026B07997853-P3Open ↗
08/14/2026B07997853-I1Open ↗
08/14/2026B07997853-P1Open ↗