ECB07/20/2026Observed at the corner of exp 2 and 3 a nonconforming shed. Rcny requires combustible structures to be min 3' from property line. Shed in in property line. Rcny also limits shed height to 7'-6". Shed exceeds he$1K due
ECB06/18/2026Occupancy contrary to that allowed by c of o or d.o.b records: atoi, observed cellar converted to living quarters featuring: 3 bedrooms, living room, 3-piece bathroom, and closets contrary to c of o # 18232. Ce$2K due
ECB06/18/2026Electrical work without a permit: atoi, observed electrical work completed and functioning at cellar: electric wiring, lighting fixtures, and receptacles installation performed without permit and approval from$2K due
ECB06/18/2026Work without a permit: atoi, observed plumbing work completed and functioning at cellar: shower, bathtub, mouth wash basin, and toilet bowl all connected to water pipelines without permit and approval from the$1K due
ECB06/18/2026Work without a permit: atoi, observed construction work completed at premises cellar. Full height partition walls creating 3 bedrooms, a living room space, interior partition doors, and closets completed and fu$1K due
One story - permanent living quarter · 3,600 sf lot · 0.24 FAR built · Flood zone X500