← Back
BuildNYC
Two family converted from one family
203 ONDERDONK AVENUE
QUEENS · Ridgewood · BIN 4081022
💬 Discuss this project
1950Year Built
1Stories
B3Building Class
R5BZoning
1,746 sfGross Floor Area
2Units
0 Active Violations
Two family converted from one family · 1,980 sf lot · 0.88 FAR built · Flood zone X
Locations of Work
ArchitectureFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Unit 1L18p · 2 filings · 20 docs
Basement7p · 1 filing · 20 docs
Sub-Basement13p · 1 filing · 20 docs
Site & exterior13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
203 Onderdonk203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/14/2023$1.2M—FIXED XPOSURE MARKTING, INC. → Private party$710/sf building
05/03/2021$550K—Private party → Fixed Xposure Marketing$315/sf building
06/05/2019$555K—Private party → DEUTSCHE BANK NATIONAL TRUST COMPANY$318/sf building
01/26/2016$636K—Private party → 203 ONDERDONK LLC$365/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nmi Architecture701/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nmi Architecture1203/21/2026
Fixed Xposure Marketing203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Silver Star ImprovementsGeneral Contractor207/08/2026
Flint Mechanicalspecialty_contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BFS Architect7477401/16/2023
Nmi Architecture6825501/16/2023
Jun Yan, PE7170106/14/2021
Building Lifecycle
11/25/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
12/04/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
11/29/2023
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
05/23/2023
Signed off — Alteration CO
Filing this amendment for minor modifications to the Basement and fist floor layout in conjunction with the main application Q00526736-i1 no change of use, egress or occupancy Energy Submissions is part of DOC-1
Q00526736-S2
04/21/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
64 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offBletsas P&H01/30/2023
DOB NOWGeneral ConstructionSigned-offSilver Star Improvements01/06/2023
DOB NOWPlumbingSigned-offFlint Mechanical03/14/2022
DOB NOWGeneral ConstructionPermit IssuedSilver Star Improvements01/25/2022
1 project · most recent 01/04/2023
General Wiring
FiledStatusContractorScope
01/04/2023Complete5 J'S Electl ContsGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
02/27/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/22/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/20/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/28/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/26/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/25/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/20/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
01/22/2023Sprinkler SystemsBelal Salimspecial
01/22/2023HVAC-R and service water heating equipmentNASHAT IBRAHIMenergy_progress
01/22/2023Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
01/22/2023Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
01/11/2023HVAC-R and service water heating equipmentNASHAT IBRAHIMenergy_progress
01/11/2023Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
01/11/2023Sprinkler SystemsBelal Salimspecial
01/11/2023Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
11/11/2022HVAC-R and service water heating equipmentNASHAT IBRAHIMenergy_progress
11/11/2022Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
11/11/2022Sprinkler SystemsBelal Salimspecial
11/11/2022Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
06/30/2022Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
06/30/2022HVAC-R and service water heating equipmentNASHAT IBRAHIMenergy_progress
06/30/2022Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
06/30/2022Sprinkler SystemsBelal Salimspecial
08/07/2021Concrete - Cast-In-PlaceNASHAT IBRAHIMspecial
05/21/2021Fenestration areasNASHAT IBRAHIMenergy_progress
05/21/2021Fenestration and door U-factor and product ratingsNASHAT IBRAHIMenergy_progress
05/21/2021Insulation placement and R valuesNASHAT IBRAHIMenergy_progress
05/21/2021Interior lighting powerNASHAT IBRAHIMenergy_progress
05/21/2021Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
05/21/2021MasonryNASHAT IBRAHIMspecial
05/21/2021Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
05/21/2021Structural Stability – Alterations of existing buildingsJUN YANspecial
Latest 25 of 27.
55 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account