← Back
Elevator apt, semi-fireproof without stores
203 UNDERHILL AVENUE
BROOKLYN · BIN 3324388
💬 Discuss this project
1912Year Built
6Stories
D1Building Class
R8XZoning
67,680 sfGross Floor Area
72Units
LL97 CoveredRent Stabilized52 Open Violations 41 unresolved · 11 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: UNDERHILL-WASHINGTON EQUITIES LLC · 15,458 sf lot · 4.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof5p · 2 filings · 20 docs
Floor 42p · 1 filing · 5 docs
Floor 3
Floor 2
Floor 1
3 jobs · most recent 09/24/2024
General Wiring
FiledStatusContractorScope
09/24/2024Permit IssuedASSOCIATED ELEC CONT OF NGeneral Wiring
01/31/2020Permit IssuedRICHARD NEU—
04/09/2018CompleteQEC ELECTRICAL SVCE CORPGeneral Wiring
Building Lifecycle
All (104)Filed (6)Permit Issued (11)Signed Off (3)Facade (FISP) (12)Violation (60)Special Inspection (12)
08/27/2026
Violation issued (HPD, open)
B
08/27/2026
Violation issued (HPD, open)
C
08/27/2026
Violation issued (HPD, open)
B
08/27/2026
Violation issued (HPD, open)
B
08/27/2026
Violation issued (HPD, open)
B
08/27/2026
Violation issued (HPD, open)
B
08/12/2026
Violation issued (HPD, open)
B
08/09/2026
Violation issued (HPD, open)
B
08/09/2026
Violation issued (HPD, open)
B
08/09/2026
Violation issued (HPD, open)
B
08/09/2026
Violation issued (HPD, open)
B
08/09/2026
Violation issued (HPD, open)
B
08/09/2026
Violation issued (HPD, open)
B
08/09/2026
Violation issued (HPD, open)
B
08/09/2026
Violation issued (HPD, open)
B
08/09/2026
Violation issued (HPD, open)
C
06/12/2026
Violation issued (HPD, closed)
B
05/28/2026
Violation issued (HPD, closed)
B
05/28/2026
Violation issued (HPD, open)
A
05/28/2026
Violation issued (HPD, closed)
C
04/17/2026
Violation issued (HPD, closed)
B
04/17/2026
Violation issued (HPD, closed)
A
04/17/2026
Violation issued (HPD, closed)
C
02/04/2026
Violation issued (HPD, closed)
A
12/29/2025
Permit issued — General Construction
B01328157-I1-GC
12/17/2025
Filed — Alteration
REMOVAL OF NON BEARING PARTITION WALLS AND APARTMENT RENOVATION OF KITCHEN AND INSTALLING NEW BATHROOM
B01328157-I1
12/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
mike polychroniades
12/03/2025
Special inspection requirement — Final
FOTIOS PAPAMICHAEL
03/18/2025
Cycle 9 facade report signed — SAFE
03/14/2025
Signed off — Alteration
FACADE REPAIR ON THE EXTRERIOR OF BUILDING AS SHOWN ON PLANS NO CHANGE TO EGRESS USE OR OCCUPANCY
B01018248-I1
03/07/2025
Special inspection requirement — Post-installed Anchors
RICHARD KOENIGSBERG
03/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
mike polychroniades
03/07/2025
Special inspection requirement — Final
RICHARD KOENIGSBERG
03/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD KOENIGSBERG
03/07/2025
Special inspection requirement — Masonry
RICHARD KOENIGSBERG
03/05/2025
Filed — Alteration
FACADE REPAIR ON THE EXTRERIOR OF BUILDING AS SHOWN ON PLANS NO CHANGE TO EGRESS USE OR OCCUPANCY
B01018248-P1
03/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD KOENIGSBERG
03/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/05/2025
Special inspection requirement — Final
RICHARD KOENIGSBERG
03/05/2025
Special inspection requirement — Post-installed Anchors
RICHARD KOENIGSBERG
03/05/2025
Special inspection requirement — Masonry
RICHARD KOENIGSBERG
02/28/2025
Cycle 9 facade report submitted
01/14/2025
Cycle 9 facade inspection completed
12/02/2024
Signed off — Alteration
FACADE REPAIR ON THE EXTRERIOR OF BUILDING AS SHOWN ON PLANS NO CHANGE TO EGRESS USE OR OCCUPANCY
B01018248-S1
10/09/2024
Permit issued — Sidewalk Shed
B00309813-I1-SH
08/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/01/2024
Permit issued — Suspended Scaffold
B01018248-S1-SC
06/18/2024
Filed — Alteration
FACADE REPAIR ON THE EXTRERIOR OF BUILDING AS SHOWN ON PLANS NO CHANGE TO EGRESS USE OR OCCUPANCY
B01018248-S1
06/18/2024
Permit issued — General Construction
B01018248-I1-GC
06/11/2024
Filed — Alteration
FACADE REPAIR ON THE EXTRERIOR OF BUILDING AS SHOWN ON PLANS NO CHANGE TO EGRESS USE OR OCCUPANCY
B01018248-I1
03/08/2024
Violation issued (HPD, closed)
B
02/21/2024
Cycle 9 facade report submitted
02/21/2024
Cycle 9 facade report signed — UNSAFE
02/21/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/19/2024
Cycle 9 facade inspection completed
10/13/2023
Permit issued — Sidewalk Shed
B00309813-I1-SH
09/25/2023
Violation issued (HPD, closed)
B
09/25/2023
Violation issued (HPD, closed)
B
09/25/2023
Violation issued (HPD, closed)
B
09/25/2023
Violation issued (HPD, closed)
B
Latest 60 of 104 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BUILDWELL GROUP1307/08/2026
ALMA REALTY1907/08/2026
UNDERHILL WASHINGTON EQUITIES1003/22/2026
BNS BUILDING ALMAR REALTY103/22/2026
OWNER OF 203 UNDERHILL AV203/22/2026
PROSPECT PARK ASSOC H403/22/2026
SPAULING ASSOCIATE203/22/2026
COLUMBIA REALTY203/22/2026
DISH WIRELESS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALMA REALTY CORP112/17/2025
RICHARD KOENIGSBERG203/05/2025
KMB DESIGN GROUP, LLC109/16/2021
SYED ENGINEERING, P.C.102/07/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES103/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
ALMA REALTY303/21/2026
HIERARCH-E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE GC INCGeneral Contractor1207/08/2026
CITY LIGHTS CONSTRUCTION*General Contractor303/21/2026
COONEY, RONANElectrical103/21/2026
MARTANY TILE CORPElectrical103/21/2026
MICHAEL MURPHYElectrical103/21/2026
QEC ELECTRICAL SVCE CORPElectrical103/22/2026
BUILDWELL GROUP INCGeneral Contractor107/08/2026
ODYSSIA GLOBAL COMM. CORPGeneral Contractor107/08/2026
ASSOCIATED ELEC CONT OF NElectrical103/22/2026
VORDONIA CONTRACTING & SUPPLIESGeneral Contractor104/09/2026
BORRELLI, RAFFAELEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MIKE POLYCHRONIADES8407212/17/2025
KOENIGSBERG ENGINEERING,2247203/05/2025
KMB DESIGN GROUP, LLC513109/16/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedVORDONIA CONTRACTING & SU12/29/2025
DOB NOWSidewalk ShedPermit IssuedTOPLINE GC INC10/09/2024
DOB NOWSuspended ScaffoldSigned-offUPHOLD CONSTRUCTION CORP07/01/2024
DOB NOWGeneral ConstructionSigned-offCITY LIGHTS CONSTRUCTION*06/18/2024
DOB NOWSidewalk ShedPermit IssuedTOPLINE GC INC10/13/2023
DOB NOWSidewalk ShedPermit IssuedTOPLINE GC INC10/18/2022
DOB NOWAntennaSigned-offODYSSIA GLOBAL COMM. CORP12/03/2021
DOB NOWSidewalk ShedPermit IssuedTOPLINE GC INC10/25/2021
DOB NOWSidewalk ShedPermit IssuedTOPLINE GC INC08/19/2021
DOB NOWSidewalk ShedPermit IssuedTOPLINE GC INC10/26/2020
DOB NOWSidewalk ShedPermit IssuedBUILDWELL GROUP INC02/07/2020
BISFSISSUEDJACK PICCINI, INC11/23/2010
BISPLISSUEDJOSEPH FERRIGNO P&H CO12/27/2006
BISPLISSUEDM&J PLBG & MECHANICAL07/06/2000
BISOTISSUEDVORDONIA CONSTRUCTION10/06/1999
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
12/16/2025Tenant Protection Plan Compliancemike polychroniadesspecial
12/03/2025FinalFOTIOS PAPAMICHAELprogress
03/07/2025Post-installed AnchorsRICHARD KOENIGSBERGspecial
03/07/2025Tenant Protection Plan Compliancemike polychroniadesspecial
03/07/2025FinalRICHARD KOENIGSBERGprogress
03/07/2025Structural Stability – Alterations of existing buildingsRICHARD KOENIGSBERGspecial
03/07/2025MasonryRICHARD KOENIGSBERGspecial
03/05/2025Structural Stability – Alterations of existing buildingsRICHARD KOENIGSBERGspecial
03/05/2025Tenant Protection Plan Compliance—special
03/05/2025FinalRICHARD KOENIGSBERGprogress
03/05/2025Post-installed AnchorsRICHARD KOENIGSBERGspecial
03/05/2025MasonryRICHARD KOENIGSBERGspecial
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
09/01/2026B00511199-I1Request digital key ↗
08/22/2026B01018248-S1Request digital key ↗
08/22/2026B01018248-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00309813-I1Request digital key ↗
▸Seals & Professional Certifications16
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B01018248-I1Open ↗
09/01/2026B01018248-I1Open ↗
09/01/2026B01018248-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00511199-I1Open ↗
08/22/2026B01018248-I1Open ↗
08/19/2026B01328157-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B01018248-I1Open ↗
08/25/2026B01328157-I1Open ↗
08/23/2026B01018248-P1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00309813-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/01/2026B00511199-I1Open ↗
08/22/2026B01018248-I1Open ↗
08/19/2026B01328157-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00511199-I1Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026B01018248-S1Open ↗
▸DOB NOWCalculations1
08/13/2026B01018248-S1Open ↗