Two family brick
2030 WEST 7TH STREET
BROOKLYN · BIN 3191067
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R5BZoning
1,596 sfGross Floor Area
2Units
Two family brick · 1,132 sf lot · 1.41 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2Under Construction1p · 1 filing · 16 docs
Floor 1Under Construction1p · 1 filing · 16 docs
CellarUnder Construction6p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VKW Design508/29/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VKW Design204/30/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cube Builders Group NYGeneral Contractor106/28/2026
Cube Build GroupsGeneral Contractor107/14/2026
American Standard P&H CororpPlumbing107/08/2026
Building Lifecycle
All (17)Filed (2)Permit Issued (3)Special Inspection (12)
07/13/2026
Permit issued — General Construction
B01385754-I1-GC
05/04/2026
Permit issued — Plumbing
B01385754-S1-PL
05/04/2026
Permit issued — General Construction
B01385754-I1-GC
04/30/2026
Filed — Alteration
PROPOSED INTERIOR ALTERATIONS TO EXISTING 2-STORY BUILDING AT CELLAR, 1ST & 2ND FLOORS. SCOPE INCLUDES NEW PARTITIONS, CEILINGS, FLOORING, AND PAINTING THROUGHOUT AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01385754-I1
04/30/2026
Filed — Alteration
PROPOSED INTERIOR ALTERATIONS TO EXISTING 2-STORY BUILDING AT CELLAR, 1ST & 2ND FLOORS. SCOPE INCLUDES NEW PARTITIONS, CEILINGS, FLOORING, AND PAINTING THROUGHOUT AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01385754-S1
04/30/2026
Special inspection requirement — Insulation placement and R values
Yuxuan Liu
04/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Yuxuan Liu
04/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
Yuxuan Liu
04/29/2026
Special inspection requirement — Interior lighting power
Yuxuan Liu
04/29/2026
Special inspection requirement — Lighting controls
Yuxuan Liu
04/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Yuxuan Liu
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yuxuan Liu
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yuxuan Liu
04/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Yuxuan Liu
04/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
Yuxuan Liu
04/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
Yuxuan Liu
04/28/2026
Special inspection requirement — Final
Yuxuan Liu
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCube Build Groups07/13/2026
DOB NOWPlumbingPermit IssuedAmerican Standard P&H Cororp05/04/2026
DOB NOWGeneral ConstructionPermit IssuedCube Builders Group NY05/04/2026
1 project · most recent 03/18/2026
General Wiring
FiledStatusContractorScope
03/18/2026Permit IssuedJ Y ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
04/30/2026Insulation placement and R valuesYuxuan Liuenergy_progress
04/29/2026Energy Code Compliance InspectionsYuxuan Liuprogress
04/29/2026Fire-Resistance Rated ConstructionYuxuan Liuprogress
04/29/2026Interior lighting powerYuxuan Liuenergy_progress
04/29/2026Lighting controlsYuxuan Liuenergy_progress
04/29/2026HVAC-R and service water piping design and insulationYuxuan Liuenergy_progress
04/29/2026Fire-Resistant Penetrations and JointsYuxuan Liuspecial
04/29/2026Fire-Resistant Penetrations and JointsYuxuan Liuspecial
04/29/2026Energy Code Compliance InspectionsYuxuan Liuprogress
04/29/2026HVAC-R and service water heating equipmentYuxuan Liuenergy_progress
04/29/2026HVAC-R and service water heating system controlsYuxuan Liuenergy_progress
04/28/2026FinalYuxuan Liuprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026B01385754-S1Request digital key ↗
08/17/2026B01385754-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/17/2026B01385754-S1Open ↗
08/17/2026B01385754-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature6
10/02/2026B01385754-I1Open ↗
10/02/2026B01385754-I1Open ↗
10/02/2026B01385754-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026B01385754-S1Open ↗
08/17/2026B01385754-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
10/02/2026B01385754-I1Open ↗
08/24/2026B01385754-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026B01385754-S1Open ↗
08/17/2026B01385754-I1Open ↗