| Owner | Filings | Most Recent |
|---|---|---|
| Industrial Bank | 14 | 04/09/2026 |
| Club Pilates Harlem 116ht | 11 | 09/01/2026 |
| Nubian Properties | 7 | 03/21/2026 |
| 2033Nationalblacktheatreway | 3 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 06/18/2020 | $32.0M | — | NBT VICTORY DEVELOPMENT LLC → 2033 NATIONAL BLACK THEATRE WAY LLC | — not available |
| 02/15/2017 | $15.5M | — | HARLEM RENAISSANCE 2012 LLC → — | — not available |
| Firm | Filings | Most Recent |
|---|---|---|
| Leon Skvirsky PE | 1 | 05/29/2026 |
| Cosentini Associates | 6 | 03/24/2026 |
| Polise Consulting Engineers | 4 | 03/11/2026 |
| VA-Spaces | 2 | 02/17/2026 |
| RMM Design Studio | 1 | 12/12/2025 |
| Psa Architects | 3 | 11/17/2025 |
| Handel Architects | 28 | 11/05/2025 |
| Marvel Architects | 2 | 08/28/2025 |
| Ospino Engineering | 5 | 06/16/2025 |
| Synergic Design Architects | 1 | 03/20/2024 |
| Joel Phagoo P.E | 2 | 02/09/2024 |
| Tohfaz Uddin PE | 5 | 11/06/2023 |
| Doka USA | 2 | 05/25/2023 |
| Lombardo Professional Engineering | 2 | 05/25/2023 |
| Highbury Concrete | 2 | 05/02/2023 |
| Paul Perdek, Prof. Engineering | 1 | 02/23/2023 |
| Ashraf | 6 | 08/14/2021 |
| NYC Department of Housing Preservation and Development | 1 | 03/11/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 Expediting Service | 16 | 03/21/2026 |
| JM Zoning | 12 | 03/21/2026 |
| Lombardo Professional Engineering | 4 | 03/21/2026 |
| William Vitacco Associates | 54 | 03/21/2026 |
| Codegreen | 8 | 03/21/2026 |
| KC Expediting | 8 | 03/21/2026 |
| AO Consulting and Drafting | 8 | 03/21/2026 |
| Northeast Service Interiors | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Chatsworth Builders | General Contractor | 57 | 07/08/2026 |
| Chatsworth Builders | Scaffold | 13 | 07/08/2026 |
| Rockledge Scaffold | Scaffold | 11 | 07/08/2026 |
| Highbury Concrete | Scaffold | 10 | 07/08/2026 |
| Vik XS Services | Scaffold | 9 | 07/08/2026 |
| Bletsas Plumbing & Heating | Fire Protection | 9 | 07/08/2026 |
| Nordest Services | Scaffold | 6 | 03/21/2026 |
| Northeast Specialist Group | Scaffold | 4 | 03/21/2026 |
| Bletsas Plumbing & Heating | Plumbing | 3 | 07/08/2026 |
| Aura Plumbing | Fire Protection | 3 | 07/08/2026 |
| Ross & Associates | General Contractor | 3 | 04/09/2026 |
| Design by Nova | General Contractor | 3 | 04/09/2026 |
| Rite Way Heating | Plumbing | 2 | 07/08/2026 |
| Rite Way Fire Spinkler | Plumbing | 2 | 03/22/2026 |
| Platinum Services NY | Scaffold | 2 | 07/08/2026 |
| Paul Signs | Sign hanger | 1 | 07/08/2026 |
| Luigi Caliendo & Sons | Scaffold | 1 | 07/08/2026 |
| Sullivan Design Group | General Contractor | 1 | 03/22/2026 |
| Accord Power | General Contractor | 1 | 07/08/2026 |
| Egl Heating | Plumbing | 1 | 07/08/2026 |
| Expert Fire Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Flint Mechanical | Plumbing | 1 | 07/08/2026 |
| Hay Mechanical Solutions | Plumbing | 1 | 07/08/2026 |
| M&D Fire Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Panili Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Power Surge Electric | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Codegreen | 510 | 10 | 03/24/2026 |
| World Design Architecture | 9323 | 4 | 12/12/2025 |
| Socotec | 301 | 6 | 10/16/2025 |
| Domani Inspection Service | 843 | 26 | 10/16/2025 |
| Leo Y Lee Associates | 2481 | 2 | 07/29/2024 |
| Geodesign | 627 | 5 | 07/22/2024 |
| WSP USA | 1848 | 4 | 07/22/2024 |
| Synergic Design | 8561 | 1 | 03/20/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sign | Signed-off | Paul Signs | 06/02/2026 |
| DOB NOW | Plumbing | Signed-off | Flint Mechanical | 01/22/2026 |
| DOB NOW | General Construction | Permit Issued | Chatsworth Builders | 01/20/2026 |
| DOB NOW | Plumbing | Signed-off | Egl Heating | 01/06/2026 |
| DOB NOW | Sprinklers | Signed-off | M&D Fire Sprinkler | 12/17/2025 |
| DOB NOW | Sprinklers | Permit Issued | Expert Fire Sprinkler | 12/08/2025 |
| DOB NOW | Structural | Permit Issued | Ross & Associates | 12/05/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Ross & Associates | 12/05/2025 |
| DOB NOW | General Construction | Permit Issued | Ross & Associates | 12/03/2025 |
| DOB NOW | General Construction | Signed-off | Design by Nova | 11/28/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Design by Nova | 11/28/2025 |
| DOB NOW | Plumbing | Signed-off | LS Plumbing | 11/26/2025 |
| DOB NOW | General Construction | Permit Issued | Chatsworth Builders | 11/17/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Vik XS Services | 09/19/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Vik XS Services | 06/16/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Vik XS Services | 04/17/2025 |
| DOB NOW | Boiler Equipment | Signed-off | Hay Mechanical Solutions | 04/08/2025 |
| DOB NOW | General Construction | Permit Issued | Chatsworth Builders | 02/12/2025 |
| DOB NOW | Construction Fence | Signed-off | Chatsworth Builders | 02/06/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Chatsworth Builders | 02/06/2025 |
| DOB NOW | Standpipe | Signed-off | Aura Plumbing | 12/31/2024 |
| DOB NOW | Standpipe | Signed-off | Aura Plumbing | 12/31/2024 |
| DOB NOW | Sprinklers | Signed-off | Aura Plumbing | 12/31/2024 |
| DOB NOW | Plumbing | Signed-off | Panili Plumbing & Heating | 12/31/2024 |
| DOB NOW | General Construction | Permit Issued | Chatsworth Builders | 11/27/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Chatsworth Builders | 11/18/2024 |
| DOB NOW | Construction Fence | Signed-off | Chatsworth Builders | 11/18/2024 |
| DOB NOW | Boiler Equipment | Signed-off | Stuart N Schwartz | 10/29/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Vik XS Services | 10/17/2024 |
| DOB NOW | Supported Scaffold | Signed-off | Vik XS Services | 07/24/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Vik XS Services | 07/23/2024 |
| DOB NOW | Foundation | Signed-off | Chatsworth Builders | 07/22/2024 |
| DOB NOW | Sprinklers | Signed-off | Bletsas Plumbing & Heating | 07/17/2024 |
| DOB NOW | Standpipe | Signed-off | Bletsas Plumbing & Heating | 07/17/2024 |
| DOB NOW | Standpipe | Signed-off | Bletsas Plumbing & Heating | 07/17/2024 |
| DOB NOW | Curb Cut | Signed-off | Chatsworth Builders | 07/15/2024 |
| DOB NOW | Plumbing | Signed-off | Bletsas Plumbing & Heating | 06/21/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Rockledge Scaffold | 04/25/2024 |
| DOB NOW | Solar | Signed-off | Accord Power | 04/11/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Rockledge Scaffold | 04/09/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/11/2026 | — | — | Heating and Air Conditioning Systems | Heat / Cool __Junk__ 03BDTLFO1010040000000000A 80,000 BTU ×7 SCWGU3063 35 tons ×3 03BDTLDO1010040000000000A 9,310 BTU ×1 GEVE0903705BTBDO10100500000B 7 tons ×1 GEVE1803102BTBD010100500000A 15 tons ×1 |
| 03/05/2026 | Permit Issued | Ross & Associates | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Climatemaster SC-036 36,000 BTU · Heat Pump Outdoor ×4 Daikin WSCH009 8,600 BTU · Heat Pump Outdoor ×2 Ventilation Greenheck CSP-A390-VG 300 CFM · Exhaust Fan ×6 |
| 12/12/2025 | Signed-off | Design by Nova | Heating and Air Conditioning Systems | Heat / Cool |
| 10/16/2025 | Permit Issued | Chatsworth Builders | Air Conditioning Systems, Cooling Towers, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Climatemaster TC-0120 96,400 BTU · Wshp ×1 TCH025AGSC0CT2S 12,900 BTU · Wshp ×1 TCH072AHPCA2VBS 68,500 BTU · Wshp ×1 Heat / Cool Daikin FXTQ24TAVJUA 23,000 BTU · Vrf Indoor ×5 RWEQ192TATJA, RWEQ96TATJA 16 tons · Vrf Outdoor ×1 RXYQ120XATJA 120,000 BTU · Vrf Outdoor ×1 RXYQ72XAYDA 72,000 BTU · Vrf Outdoor ×1 Climatemaster KACF-180H5AARS-6742 156,400 BTU · Wshp ×1 TCH018AGSC0CT2S 18,400 BTU · Wshp ×1 TCH025AGSC0CT3S 12,900 BTU · Wshp ×1 TCH030AGSC0CT3S 28,200 BTU · Wshp ×1 Bell & Gossett AP100 Heat Exchanger ×2 Ventilation Aaon RN-020-3-0-E609-000 6,150 CFM · Erv ×2 Cooling Tower Marley MD5010RKD2LSAF 800 tons · Cooling Tower ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/24/2026 | Permit Issued | Expert Fire Sprinkler | 76 heads |
| 03/03/2026 | — | — | 53 heads |
| 12/12/2025 | Signed-off | M&D Fire Sprinkler | 21 heads |
| 10/16/2025 | Signed-off | Aura Plumbing | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/24/2026 | — | — | — |
| 03/03/2026 | — | — | Water/Sanitary |
| 02/16/2026 | Signed-off | Egl Heating | Water/Sanitary |
| 12/12/2025 | Signed-off | Rite Way Heating | Water/Sanitary |
| 10/16/2025 | Signed-off | Bletsas P&H | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/01/2026 | Complete | Limitless Electric Resources | — |
| 06/24/2026 | Permit Issued | Kenneth Fisk Electric | General Wiring |
| 02/16/2026 | Complete | TF Electrical | General Wiring |
| 12/16/2025 | Complete | Cityone Electrical | General Wiring |
| 07/09/2025 | Complete | Difazio Electric NY | General Wiring |
| 07/09/2025 | Complete | Difazio Electric NY | General Wiring |
| 06/02/2025 | Complete | Power Surge Electric | — |
| 07/06/2023 | Complete | Agir Electrical Ltd D/B/A | — |
| 02/14/2023 | Permit Issued | Agir Electrical Ltd D/B/A | General Wiring |
| 01/19/2023 | Complete | Agir Electrical Ltd D/B/A | — |
| 01/17/2023 | Complete | Agir Electrical Ltd D/B/A | — |
| 08/02/2022 | Complete | Amber Lite Electric | 1 meters, 1 new_meters |
| 05/20/2021 | Complete | Illuminous Electric | — |
| 05/20/2021 | Complete | Illuminous Electric | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| — | — | — | Fence, Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/28/2025 | Signed-off | Vik XS Services | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/31/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/13/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/05/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/21/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/21/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/16/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/09/2025 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 05/30/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/22/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/21/2025 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 04/16/2025 | Administrative Rejection Boiler Certification | Administrative Rejection | View ↗ |
| 04/07/2025 | Administrative Rejection Boiler Certification | Administrative Rejection | View ↗ |
| 04/07/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/04/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/26/2025 | Fail-Final Boiler Equipment Inspection | Fail | View ↗ |
| 03/21/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/27/2025 | Pass-Final SD - Fire Pump | Pass | View ↗ |
| 02/20/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 01/15/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 02/08/2024 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 02/05/2024 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 07/21/2023 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 04/07/2023 | Pass-Final PL - Underground | Pass | View ↗ |
| 02/16/2023 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 02/16/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/29/2026 | Shutoff dampers | — | energy_progress |
| 05/29/2026 | Maintenance information | — | energy_progress |
| 05/29/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 05/29/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 05/29/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 05/29/2026 | Electrical motors and elevators | — | energy_progress |
| 05/29/2026 | Metering | — | energy_progress |
| 05/14/2026 | Final | LEON SKVIRSKY | progress |
| 04/28/2026 | Post-installed Anchors | — | special |
| 03/24/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 03/24/2026 | Tenant Protection Plan Compliance | — | special |
| 03/24/2026 | Sprinkler Systems | HATIM ELSAID | special |
| 03/24/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 03/17/2026 | HVAC-R and service water piping design and insulation | HATIM ELSAID | energy_progress |
| 03/17/2026 | HVAC-R and service water heating system controls | HATIM ELSAID | energy_progress |
| 03/17/2026 | Duct leakage testing, insulation and design | HATIM ELSAID | energy_progress |
| 03/17/2026 | Interior lighting power | HATIM ELSAID | energy_progress |
| 03/17/2026 | Shutoff dampers | HATIM ELSAID | energy_progress |
| 03/17/2026 | HVAC-R and service water heating equipment | HATIM ELSAID | energy_progress |
| 03/17/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 03/17/2026 | Ventilation and air distribution system | HATIM ELSAID | energy_progress |
| 03/17/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 03/17/2026 | Sprinkler Systems | HATIM ELSAID | special |
| 03/17/2026 | Tenant Protection Plan Compliance | — | special |
| 03/17/2026 | Final | HATIM ELSAID | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| National Black Theatre | Arts / Culture / Entertainment | Cellar, Floors 1–5 | Project M01367763 Project M01350118 Project M08020643 Project M08032530 Project M08032540 |
| Industrial Bank - Harlem | Bank / Financial branch | Floor 1 | Project M01291830 Project M01291863 Project M01291869 Project M01291876 Project M01291884 |
| National Black Theater | Arts / Culture / Entertainment | Roof | Project M01017106 |