← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Parkchester South Condominium
2033 MCGRAW AVENUE · Parkchester · BIN 2096661
💬 Discuss this project
0Year Built
—Stories
RMBuilding Class
R6Zoning
2,199,075 sfGross Floor Area
2,719Units
Rent Stabilized963 Active Violations ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Parkchester South Condominium Associates · 951,289 sf lot · 2.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofParkchester South CondominiumUnder Construction6p · 2 filings · 10 docs
BulkheadParkchester South CondominiumUnder Construction1p · 1 filing · 7 docs
Site & exteriorParkchester South CondominiumUnder Construction22p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Parkchester South Condo1003/21/2026
Intersystem Construction110/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rigid Structural Design207/16/2026
Rimkus New York112/03/2025
Green Design206/16/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LemxScaffold407/08/2026
Intersystem ConstructionScaffold209/01/2026
Two-Tone ContractingGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rimkus New York9809112/03/2025
Building Lifecycle
All (76)Filed (6)Permit Issued (6)Signed Off (1)Facade (FISP) (12)Violation (38)Inspection (2)Objection (6)Special Inspection (5)
08/31/2026
Permit issued — Sidewalk Shed
X01407420-I1-SH
08/13/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/16/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01407420-P1
06/02/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01407420-I1
06/02/2026
Permit issued — Sidewalk Shed
X01407420-I1-SH
06/01/2026
Violation issued (ECB, closed)
Elevators
05/12/2026
Permit issued — Suspended Scaffold
X01383068-I1-SC
04/20/2026
Permit issued — General Construction
X01302753-I1-GC
04/13/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
X01383068-I1
03/16/2026
Objection resolved — Addressed
03/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Daniel Presburger
02/25/2026
Objection resolved — Addressed
01/19/2026
Objection resolved — Addressed
12/12/2025
Objection raised — Scope
12/12/2025
Objection raised — Energy
12/12/2025
Objection raised — Inspections
12/03/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR FACADE RESTORATION WORK AS SHOWN ON PLANS SUBMITTED. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01302753-I1
11/17/2025
Violation issued (HPD, closed)
I
10/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
Daniel Presburger
10/14/2025
Special inspection requirement — Masonry
Daniel Presburger
10/14/2025
Special inspection requirement — Final
Daniel Presburger
02/21/2023
Cycle 9 facade report submitted
02/21/2023
Cycle 9 facade report signed — SWARMP
02/02/2023
Cycle 9 facade inspection completed
02/23/2022
Violation issued (HPD, closed)
A
02/23/2022
Violation issued (HPD, closed)
A
05/25/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X00338593-I1
12/18/2020
Permit issued — Sidewalk Shed
X00338593-I1-SH
09/22/2020
Violation issued (HPD, closed)
B
09/22/2020
Violation issued (HPD, closed)
A
09/22/2020
Violation issued (HPD, open)
C
09/22/2020
Violation issued (HPD, closed)
B
06/16/2020
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X00338593-P1
06/16/2020
Special inspection requirement — Final
BRIAN T. O'CONNOR
04/01/2020
Permit issued — Sidewalk Shed
X00338593-I1-SH
03/30/2020
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X00338593-I1
10/09/2019
Violation issued (HPD, closed)
B
08/23/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/17/2019
Violation issued (HPD, closed)
B
04/17/2019
Violation issued (HPD, closed)
B
04/17/2019
Violation issued (HPD, closed)
B
04/17/2019
Violation issued (HPD, closed)
B
04/17/2019
Violation issued (HPD, closed)
B
07/24/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/06/2018
Cycle 8 facade report submitted
02/05/2018
Cycle 8 facade report signed — SWARMP
01/11/2018
Cycle 8 facade inspection completed
11/14/2017
Violation issued (HPD, closed)
I
10/24/2017
Violation issued (HPD, closed)
A
10/10/2017
Violation issued (HPD, closed)
B
10/10/2017
Violation issued (HPD, closed)
B
08/04/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/13/2017
Violation issued (HPD, closed)
B
07/21/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/08/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/05/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/30/2014
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
09/23/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/20/2012
Cycle 7 facade report submitted
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedIntersystem Construction08/31/2026
DOB NOWSidewalk ShedPermit IssuedIntersystem Construction06/02/2026
DOB NOWSuspended ScaffoldPermit IssuedTwo-Tone Contracting05/12/2026
DOB NOWGeneral ConstructionPermit IssuedTwo-Tone Contracting04/20/2026
DOB NOWSidewalk ShedSigned-offLemx12/18/2020
DOB NOWSidewalk ShedSigned-offLemx04/01/2020
BISOTISSUEDJepol Construction06/09/2020
BISOTISSUEDHobo Construction Co06/06/2005
BISOTISSUEDHobo Construction Co05/23/2005
BISEQISSUEDOutdoor Installation04/28/2005
BISEQISSUEDAtlantic Heydt02/25/2000
BISPLISSUEDMedco Plumbing11/19/1999
BISOTISSUEDPPC Construction11/19/1999
2 projects · most recent 06/02/2026
FiledStatusContractorScope
06/02/2026Permit IssuedAurora Electrical Contg—
05/27/2020CompleteRichard Neu—
1 project · most recent 04/13/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/13/2026Permit IssuedTwo-Tone ContractingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/13/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/16/2026Structural Stability – Alterations of existing buildingsDaniel Presburgerspecial
10/14/2025Tenant Protection Plan ComplianceDaniel Presburgerspecial
10/14/2025MasonryDaniel Presburgerspecial
10/14/2025FinalDaniel Presburgerprogress
06/16/2020FinalBRIAN T. O'CONNORprogress
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
08/17/2026X01302753-I1Request digital key ↗
08/17/2026X01383068-I1Request digital key ↗
08/16/2026X01407420-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/26/2026X00338593-I1Request digital key ↗
08/15/2026X00338593-P1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
02/25/2020220726855Open ↗
▸BISWORK PERMIT APPLICATION1
06/09/2020220726855Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/16/2026X01407420-P1Open ↗
08/16/2026X01407420-I1Open ↗
08/13/2026X00338593-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/30/2026X01302753-I1Open ↗
08/30/2026X01302753-I1Open ↗
08/30/2026X01302753-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026X01302753-I1Open ↗
08/30/2026X00338593-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/25/2020220726855Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan2
08/13/2026X00338593-P1Open ↗
08/13/2026X00338593-I1Open ↗
▸BISTenant Protection Plan and Notes1
02/25/2020220726855Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/25/2020220726855Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01302753-I1Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS1
03/24/2021220726855Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/24/2021220726855Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/25/2020220726855Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/24/2021220726855Open ↗
06/09/2020220726855Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/16/2026X01407420-I1Open ↗
08/16/2026X01407420-P1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/25/2020220726855Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/24/2021220726855Open ↗
▸BISSHED LETTER1
06/09/2020220726855Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/24/2021220726855Open ↗
02/25/2020220726855Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
02/25/2020220726855Open ↗
▸BISEFILING COVER SHEET1
02/25/2020220726855Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026X01383068-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01383068-I1Open ↗