ECB03/10/2026Failure to maintain building in code- complaint manner. Observed no plastic sheets on the third floor balcony leaving expose wood to the weather. Second floor balcony had loose plastic sheet hanging at the bott$25K due
ECB07/22/2025During the inspection, it was observed on the third floor at exposure 1 the balcony had loose sheet of plastic hanging from the bottom of the balcony structure. This condition constitutes a violation due to the$12K due
ECB05/15/2016Failure to maintain bldg in a code compliant manner. Premises under p.c. Alt ii 220454489. Noted: at time of appointment inspection to confirm the installation of exit signage with emergency lighting found;Nothing owed — awaiting certificate of correction
ECB09/11/2015Failure to maintain building in code compliant manner.noted:no exit s ign on front exit door (for workers) and also substandard exit sign onrear exit door (not illuminated). Remedy: install standard exit sign.Nothing owed — awaiting certificate of correction
ECB07/14/2012Operation of a pa w/o a curret pa c/o. Noted: premises is arranged foroccupancy by approx 80 persons w/o a valid pa permit. Remedy: obtain avalid pa c/o.Nothing owed — awaiting certificate of correction
ECB04/23/2009Operation of a place of assembly w/o a current cert of operation. Noted: in support of vecb #3470202L premises arranged for occupancy of greater than 75 persons. "el texano restaurant" remedy: obtain currentNothing owed — awaiting certificate of correction
ECB09/20/2008Operation of a place of assembly w/o a current certificate of operation premises arranged for occupancy of greater than 75 persons remedy: obtain a place of assembly cert of operationNothing owed — awaiting certificate of correction
ECB09/15/2000Failure to maintain exterior building wall defect is:parapet wall over store front is collapsing.remedy:file plans obtain all approvals and permits.make all repairs,submit a letter of of structural stability,frNothing owed — awaiting certificate of correction