← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2039 CRUGER AVENUE
BRONX · BIN 2048774
💬 Discuss this project
1935Year Built
6Stories
D1Building Class
R7-1Zoning
81,456 sfGross Floor Area
73Units
LL97 CoveredRent Stabilized31 Active Violations 30 unresolved · 1 paperwork only 1 old, status unconfirmed ▸FISP: SWARMP
Elevator apt, semi-fireproof without stores · Owner of record: 2039 Realty · 18,035 sf lot · 4.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Installation of Temporary Pipe Scaffold6p · 2 filings · 4 docs
Site & exteriorFacade repair (OSP)5p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2039 Realty903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Enthink Engineers306/09/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Reliable EnterprisesScaffold207/08/2026
Boulis ConstructionGeneral Contractor107/08/2026
Approved EnergyPlumbing103/21/2026
Approved Oil CompanyGeneral Contractor107/20/2012
M.S.S. ConstructionGeneral Contractor105/13/2008
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Enthink Engineers6247106/09/2022
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 10, sub-cycle A)
The filing window opened 02/21/2025. 1 Cycle 10 filing on record, latest 04/29/2025, status Swarmp
10/29/2026
Elevator Category 1 inspection report filed
03/23/2026
Boiler inspection report filed
Initial · no defects · Accepted
01/13/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
01/13/2026
§ 27-2005 ADM CODE PROVIDE KNOB AT DOOR AT 1st PUBLIC HALL BULKHEAD FROM NORTH
HPD violation · closed
224 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBoulis Construction06/14/2022
DOB NOWSupported ScaffoldSigned-offReliable Enterprises04/19/2022
DOB NOWSidewalk ShedSigned-offReliable Enterprises02/01/2022
BISFSISSUEDApproved Oil Co of Brooklyn02/22/2013
BISPLISSUEDBell Fuel Oil02/22/2013
BISOTISSUEDApproved Oil Co Brooklyn07/20/2012
BISPLISSUEDBell Fuel Oil07/20/2012
BISEQISSUEDM.S.S. Construction05/13/2008
BISEQISSUEDColgate Scaffolding10/23/1996
1 project · most recent 02/01/2022
FiledStatusContractorScope
02/01/2022Permit IssuedRichard Neu—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/02/2022MasonrySunil Saigalspecial
05/02/2022Structural Stability – Alterations of existing buildingsSunil Saigalspecial
05/02/2022FinalSunil Saigalprogress
05/02/2022Energy Code Compliance InspectionsSunil Saigalprogress
66 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account