← Back
Primarily 1 family with 1 store or office
204-06 HILLSIDE AVENUE
QUEENS · BIN 4223606
💬 Discuss this project
1931Year Built
2Stories
S1Building Class
R4Zoning
2,400 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Primarily 1 family with 1 store or office · 1,840 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
Architecture
Floor 13p · 2 filings · 9 docs
Cellar3p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKY SL CONSTRUCTION903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AK CONSULTING SERVICES, INC207/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKY SL CONSTRUCTION CORPGeneral Contractor303/21/2026
AJIT ONE MECH&GEN'L CONTRPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK CONSULTING SERVICES, I6198207/23/2024
Building Lifecycle
All (30)Filed (2)Permit Issued (2)Signed Off (2)Violation (5)Inspection (2)Objection (12)Special Inspection (5)
01/28/2025
Signed off — Alteration
INSTALLATION OF NEW WATER CLOSET & LAVATORY IN NEW ADA BATHROOM, ONE DRINKING FOUNTAIN AND REPLACEMENT WITH NEW WATER CLOSET & LAVATORY ON EXISTING BATHROOM AT MEDICAL OFFICE (FIRST FLOOR) AS PER INDICATED ON PLAN. NO GAS WORK.
Q01083363-I1
01/28/2025
Signed off — Alteration
INTERIOR RENOVATION AT MEDICAL OFFICE (FIRST FLOOR AND CELLAR) AND ADDRESS THE ECB VIOLATION NUMBER: 39102154N. IT INCLUDES WALL GYPSUM BOARD & FLOOR TILE REPLACEMENT, RESTROOM FITTINGS AND FIXTURE WITH NEW, SHORING POST AT CELLAR AS PER INDICATED ON PLAN
Q01021217-I1
01/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/03/2024
Permit issued — Plumbing
Q01083363-I1-PL
08/15/2024
Objection resolved — Addressed
08/15/2024
Objection resolved — Addressed
08/15/2024
Objection resolved — Addressed
08/15/2024
Objection resolved — Addressed
08/12/2024
Objection raised — Admin
08/12/2024
Objection raised — Structural
07/29/2024
Objection raised — Other
07/29/2024
Objection raised — Other
07/23/2024
Filed — Alteration
INSTALLATION OF NEW WATER CLOSET & LAVATORY IN NEW ADA BATHROOM, ONE DRINKING FOUNTAIN AND REPLACEMENT WITH NEW WATER CLOSET & LAVATORY ON EXISTING BATHROOM AT MEDICAL OFFICE (FIRST FLOOR) AS PER INDICATED ON PLAN. NO GAS WORK.
Q01083363-I1
07/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
07/10/2024
Permit issued — General Construction
Q01021217-I1-GC
04/24/2024
Objection resolved — Addressed
04/23/2024
Objection raised — Other
04/16/2024
Objection resolved — Addressed
03/27/2024
Objection raised — Other
03/25/2024
Filed — Alteration
INTERIOR RENOVATION AT MEDICAL OFFICE (FIRST FLOOR AND CELLAR) AND ADDRESS THE ECB VIOLATION NUMBER: 39102154N. IT INCLUDES WALL GYPSUM BOARD & FLOOR TILE REPLACEMENT, RESTROOM FITTINGS AND FIXTURE WITH NEW, SHORING POST AT CELLAR AS PER INDICATED ON PLAN
Q01021217-I1
03/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
MAHFUZAR RAHMAN
03/25/2024
Special inspection requirement — Energy Code Compliance Inspections
MAHFUZAR RAHMAN
03/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
03/17/2024
Special inspection requirement — Final
MAHFUZAR RAHMAN
12/22/2023
Violation issued (ECB, closed)
Construction
06/14/2004
Violation issued (ECB, closed)
Construction
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/28/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHAR JI PLUMBING& HEAT COR09/03/2024
DOB NOWGeneral ConstructionSigned-offSKY SL CONSTRUCTION CORP07/10/2024
BISOTISSUEDMICHAEL K. CONSTRUCTION INC05/09/1994
BISEQISSUEDMICHAEL K. CONSTRUCTION INC05/09/1994
1 project · most recent 05/15/2024
General Wiring
FiledStatusContractorScope
05/15/2024Permit IssuedGREEN POWER ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/19/2024Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
03/25/2024Tenant Protection Plan ComplianceMAHFUZAR RAHMANspecial
03/25/2024Energy Code Compliance InspectionsMAHFUZAR RAHMANprogress
03/17/2024Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
03/17/2024FinalMAHFUZAR RAHMANprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q01021217-I1Request digital key ↗
08/21/2026Q01083363-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026Q01083363-I1Open ↗
08/13/2026Q01021217-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q01021217-I1Open ↗
08/25/2026Q01083363-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026Q01021217-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026Q01083363-I1Open ↗
08/13/2026Q01021217-I1Open ↗