← Back
Primarily 3 family with 1 store or office
204 AVENUE B
MANHATTAN · BIN 1005218
💬 Discuss this project
1929Year Built
4Stories
S3Building Class
R7AZoning
3,228 sfGross Floor Area
4Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: WAYNE W. TRAUB TRUST, UTD 11/08/2018 · 1,110 sf lot · 2.91 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Roof3p · 3 filings · 20 docs
Floor 43p · 3 filings · 20 docs
Floor 31p · 1 filing · 8 docs
Floor 22p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HURTERIKA4907/08/2026
STEEL CONSTRUCTION407/08/2026
WAYNE W. TRAUB TRUST, UTD 11/08/2018103/22/2026
KURTERIKA,LLC203/22/2026
3-G SERVICES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GACE DPC301/24/2025
VICTOR CASTILLO ARCHITECT PC609/16/2024
OCEAN ENTERPRISES INC.607/29/2024
AKT ARCHITECTS301/17/2024
MJE PROFESSIONAL SERVICES101/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOEL BUILDING CONSULTING INC2403/21/2026
BMB BUILDING CONSULTING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
3-G SERVICES LIMITEDGeneral Contractor707/08/2026
ADIR STUCCO INCGeneral Contractor507/08/2026
RAYMOND'S PLBG & HTG LLCPlumbing207/08/2026
POWER ELECTRIC CONTRACTINElectrical103/22/2026
STEEL CONSTRUCTION LLCGeneral Contractor107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK CONSULTING SERVICES, I6198501/24/2025
NTD ENGINEERING CONSULTAN7634309/16/2024
Building Lifecycle
All (161)Filed (19)Permit Issued (10)Signed Off (10)Violation (60)Inspection (10)Objection (22)Special Inspection (30)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/03/2025
Signed off — Alteration
Installation of HVAC system and bathroom exhaust fan. No change of use, egress or occupancy under this application.
M00972715-I1
04/22/2025
Signed off — Alteration
Replacement of existing Burnt and deteriorated wood joist on second floor through roof floor. No change of use, egress or occupancy under this application.
M00970089-I1
04/18/2025
Signed off — Alteration
Demolition of Interior partitions & Ceils due to fire damage. No change of use, egress or occupancy under this application.
M00946254-I1
04/17/2025
Signed off — Alteration
M01094290-I1
04/16/2025
Signed off — Alteration
PROPOSED RESTAURANT RENOVATION AT CELLAR, 1ST FLOOR. MECH WORK ON ROOF TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS, OCCUPANCY.
M01084783-I1
04/16/2025
Signed off — Alteration
PROPOSED RESTAURANT RENOVATION AT CELLAR, 1ST FLOOR. MECH WORK ON ROOF TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS, OCCUPANCY.
M01084783-S1
04/16/2025
Signed off — Alteration
PROPOSED RESTAURANT RENOVATION AT CELLAR, 1ST FLOOR. MECH WORK ON ROOF TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS, OCCUPANCY.
M01084783-S2
01/29/2025
Special inspection requirement — Structural Cold-Formed Steel
MAHFUZAR RAHMAN
01/29/2025
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
01/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAHFUZAR RAHMAN
01/29/2025
Special inspection requirement — Final
MAHFUZAR RAHMAN
01/29/2025
Special inspection requirement — Structural Steel - High Strength Bolting
MAHFUZAR RAHMAN
01/29/2025
Special inspection requirement — Structural Steel - Details
MAHFUZAR RAHMAN
01/24/2025
Filed — Alteration
Replacement of existing Burnt and deteriorated wood joist on second floor through roof floor. No change of use, egress or occupancy under this application.
M00970089-P2
01/06/2025
Signed off — Alteration
M01013749-I1
12/30/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/10/2024
Special inspection requirement — Final
MAHFUZAR RAHMAN
12/10/2024
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
12/10/2024
Special inspection requirement — Structural Cold-Formed Steel
MAHFUZAR RAHMAN
12/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAHFUZAR RAHMAN
12/10/2024
Special inspection requirement — Structural Steel - Details
MAHFUZAR RAHMAN
12/10/2024
Special inspection requirement — Structural Steel - High Strength Bolting
MAHFUZAR RAHMAN
10/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/08/2024
Violation issued (HPD, open)
B
09/27/2024
Filed — Alteration
Replacement of existing Burnt and deteriorated wood joist on second floor through roof floor. No change of use, egress or occupancy under this application.
M00970089-P1
09/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/24/2024
Special inspection requirement — Mechanical Systems
LI-YUAN LIN
09/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LI-YUAN LIN
09/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
LI-YUAN LIN
09/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
LI-YUAN LIN
09/24/2024
Special inspection requirement — Energy Code Compliance Inspections
LI-YUAN LIN
09/24/2024
Special inspection requirement — Shutoff dampers
LI-YUAN LIN
09/24/2024
Special inspection requirement — Duct leakage testing, insulation and design
LI-YUAN LIN
09/24/2024
Special inspection requirement — Maintenance information
LI-YUAN LIN
09/24/2024
Special inspection requirement — Energy Code Compliance Inspections
LI-YUAN LIN
09/24/2024
Special inspection requirement — Final
LI-YUAN LIN
09/16/2024
Filed — Alteration
PROPOSED RESTAURANT RENOVATION AT CELLAR, 1ST FLOOR. MECH WORK ON ROOF TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS, OCCUPANCY.
M01084783-P2
09/16/2024
Filed — Alteration
PROPOSED RESTAURANT RENOVATION AT CELLAR, 1ST FLOOR. MECH WORK ON ROOF TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS, OCCUPANCY.
M01084783-P1
09/11/2024
Permit issued — General Construction
M01084783-I1-GC
09/11/2024
Permit issued — Mechanical Systems
M01084783-S1-MS
09/09/2024
Permit issued — Plumbing
M01084783-S2-PL
09/09/2024
Permit issued — Construction Fence
M01094290-I1-FN
08/26/2024
Violation issued (HPD, closed)
C
08/26/2024
Violation issued (HPD, closed)
C
08/26/2024
Violation issued (HPD, closed)
A
08/26/2024
Violation issued (HPD, closed)
C
08/26/2024
Violation issued (HPD, closed)
A
08/26/2024
Violation issued (HPD, closed)
C
08/26/2024
Violation issued (HPD, closed)
B
08/26/2024
Violation issued (HPD, closed)
C
08/26/2024
Violation issued (HPD, closed)
A
08/26/2024
Violation issued (HPD, closed)
B
08/26/2024
Violation issued (HPD, closed)
C
08/26/2024
Violation issued (HPD, closed)
C
08/26/2024
Violation issued (HPD, closed)
A
08/26/2024
Violation issued (HPD, closed)
A
08/26/2024
Violation issued (HPD, closed)
A
Latest 60 of 161 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offADIR STUCCO INC09/11/2024
DOB NOWMechanical SystemsSigned-offADIR STUCCO INC09/11/2024
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC09/09/2024
DOB NOWConstruction FenceSigned-offADIR STUCCO INC09/09/2024
DOB NOWMechanical SystemsSigned-off3-G SERVICES LIMITED06/06/2024
DOB NOWPlumbingSigned-offRAYMOND'S PLBG & HTG LLC04/15/2024
DOB NOWStructuralSigned-off3-G SERVICES LIMITED02/02/2024
DOB NOWSidewalk ShedSigned-offSTEEL CONSTRUCTION LLC01/12/2024
DOB NOWPlumbingSigned-offRAYMOND'S PLBG & HTG LLC12/14/2023
DOB NOWGeneral ConstructionSigned-off3-G SERVICES LIMITED11/06/2023
BISSPISSUEDWATER PLUS II INC10/18/1993
BISMHISSUEDHELD BROTHERS INC07/15/1993
4 projects · most recent 02/04/2025
General Wiring
FiledStatusContractorScope
02/04/2025CompleteLENS ELECTRIC, INCGeneral Wiring
10/20/2024CompletePOWER ELECTRIC CONTRACTINGeneral Wiring
01/11/2024CompleteRICHARD NEU—
07/03/2023CompleteALL WAYS ELECTRIC CORP.W—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/28/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/17/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/17/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/21/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
01/29/2025Structural Cold-Formed SteelMAHFUZAR RAHMANspecial
01/29/2025Post-installed AnchorsMAHFUZAR RAHMANspecial
01/29/2025Structural Stability – Alterations of existing buildingsMAHFUZAR RAHMANspecial
01/29/2025FinalMAHFUZAR RAHMANprogress
01/29/2025Structural Steel - High Strength BoltingMAHFUZAR RAHMANspecial
01/29/2025Structural Steel - DetailsMAHFUZAR RAHMANspecial
12/10/2024FinalMAHFUZAR RAHMANprogress
12/10/2024Post-installed AnchorsMAHFUZAR RAHMANspecial
12/10/2024Structural Cold-Formed SteelMAHFUZAR RAHMANspecial
12/10/2024Structural Stability – Alterations of existing buildingsMAHFUZAR RAHMANspecial
12/10/2024Structural Steel - DetailsMAHFUZAR RAHMANspecial
12/10/2024Structural Steel - High Strength BoltingMAHFUZAR RAHMANspecial
09/24/2024Mechanical SystemsLI-YUAN LINspecial
09/24/2024HVAC-R and service water piping design and insulationLI-YUAN LINenergy_progress
09/24/2024HVAC-R and service water heating system controlsLI-YUAN LINenergy_progress
09/24/2024HVAC-R and service water heating equipmentLI-YUAN LINenergy_progress
09/24/2024Energy Code Compliance InspectionsLI-YUAN LINprogress
09/24/2024Shutoff dampersLI-YUAN LINenergy_progress
09/24/2024Duct leakage testing, insulation and designLI-YUAN LINenergy_progress
09/24/2024Maintenance informationLI-YUAN LINenergy_progress
09/24/2024Energy Code Compliance InspectionsLI-YUAN LINprogress
09/24/2024FinalLI-YUAN LINprogress
08/01/2024Exterior lighting powerLI-YUAN LINenergy_progress
08/01/2024Fire-Resistant Penetrations and JointsLI-YUAN LINspecial
08/01/2024Energy Code Compliance InspectionsLI-YUAN LINprogress
Latest 25 of 43.
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/29/2026M00946391-I1Request digital key ↗
08/29/2026M00946254-I1Request digital key ↗
08/29/2026M00946254-P1Request digital key ↗
Showing 3 of 19 on file for this type
▸Seals & Professional Certifications51
▸DOB NOWProgress Inspector Seal & Signature25
09/27/2026M00946254-P1Open ↗
08/29/2026M01084783-S1Open ↗
08/29/2026M01084783-S1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/29/2026M00946391-I1Open ↗
08/29/2026M00946254-I1Open ↗
08/28/2026M00970089-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/29/2026M01084783-S1Open ↗
08/29/2026M00972715-P1Open ↗
08/28/2026M01084783-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/29/2026M00946391-I1Open ↗
08/29/2026M00946254-I1Open ↗
08/28/2026M00970089-P1Open ↗
Showing 3 of 17 on file for this type