← Back
Five to six families
204 CALYER STREET
BROOKLYN · Greenpoint · BIN 3065365
💬 Discuss this project
1930Year Built
3Stories
C2Building Class
R6BZoning
4,200 sfGross Floor Area
6Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: 204 CALYER STREET LLC · 1,708 sf lot · 2.46 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 16 docs
Bulkhead2p · 1 filing · 16 docs
Floor 35p · 3 filings · 20 docs
Floor 21p · 1 filing · 16 docs
Floor 13p · 2 filings · 19 docs
Cellar3p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
85 QUAY STREET4107/08/2026
204 CALYER STREET LLC103/22/2026
200-204 CALYER ST LLC303/22/2026
ORLO CONSTRUCTION303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHI F. LAU ARCHITECT, P.C.1312/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING2603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ORLO CONSTRUCTION LLCGeneral Contractor1307/08/2026
KISHAN PLUMBING INCPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.2541312/12/2023
Building Lifecycle
All (110)Filed (13)Permit Issued (8)Signed Off (8)Violation (18)Inspection (10)Objection (23)Special Inspection (30)
05/04/2026
Violation issued (HPD, closed)
A
12/10/2025
Violation issued (HPD, closed)
A
12/10/2025
Violation issued (HPD, closed)
A
12/10/2025
Violation issued (HPD, closed)
A
12/10/2025
Violation issued (HPD, closed)
A
12/10/2025
Violation issued (HPD, closed)
C
12/10/2025
Violation issued (HPD, closed)
C
01/17/2024
Signed off — Alteration
PROPOSE INTERIOR RENOVATION WORKS ON EXISTING 2ND FLOOR & 3RD FLOOR (UNIT 2L & 3L) AT EXISTING 3 STORIES WITH CELLAR BUILDING AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00967541-I1
01/17/2024
Signed off — Alteration
B00967543-I1
01/17/2024
Signed off — Alteration
PROPOSE MINI-SPLIT SYSTEM FOR THE EXISTING APARTMENT 2L & 3L; THE GENERAL CONSTRUCTION, PLUMBING WORK WILL BE FILED SEPARATELY NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00967542-I1
12/29/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/28/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/15/2023
Permit issued — Mechanical Systems
B00967542-I1-MS
12/12/2023
Filed — Alteration
PROPOSE MINI-SPLIT SYSTEM FOR THE EXISTING APARTMENT 2L & 3L; THE GENERAL CONSTRUCTION, PLUMBING WORK WILL BE FILED SEPARATELY NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00967542-I1
12/06/2023
Permit issued — Plumbing
B00967543-I1-PL
12/06/2023
Permit issued — General Construction
B00967541-I1-GC
12/01/2023
Filed — Alteration
PROPOSE INTERIOR RENOVATION WORKS ON EXISTING 2ND FLOOR & 3RD FLOOR (UNIT 2L & 3L) AT EXISTING 3 STORIES WITH CELLAR BUILDING AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00967541-I1
12/01/2023
Filed — Alteration
B00967543-I1
11/17/2023
Signed off — Alteration
PROPOSE INTERIOR RENOVATION WORKS ON EXISTING 1ST FLOOR AT EXISTING 3 STORIES WITH CELLAR BUILDING AS PER PLAN. THE PLUMBING WORK WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00866481-I1
11/17/2023
Signed off — Alteration
PROPOSE INTERIOR RENOVATIONS ON EXISTING APARTMENT 2R & 3R WITH GENERAL CONSTRUCTION WORKS INCLUDE NEW STAIRS TO THE ROOF. MINOR PARTITION AND INTERIOR FINISHES AS PER PLAN. THE PLUMBING WORK WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B08024761-I1
11/17/2023
Signed off — Alteration
PROPOSE PLUMBING WORKS ON EXISTING 1ST FLOOR APT #1R AT EXISTING 3 STORIES WITH CELLAR BUILDING AS PER PLAN. THE GENERAL CONSTRUCTION WORK WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00866482-I1
11/16/2023
Signed off — Alteration
PROPOSE PLUMBING WORK AT EXISTING APARTMENTS 2R & 3R. MINOR PARTITION AND INTERIOR FINISHES AS PER PLAN. THE GENERAL CONSTRUCTION WORK WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08024762-I1
11/09/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/08/2023
Signed off — Alteration
PROPOSE MINI-SPLIT SYSTEM FOR EXISTING APARTMENT 1R, 2R, & 3R; THE GENERAL CONSTRUCTION, PLUMBING WORK WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS OR OCCUPANCY THIS APPLICATION.
B00897574-I1
11/08/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
11/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
11/06/2023
Special inspection requirement — Tenant Protection Plan Compliance
MAURICIO ANDRADE
11/06/2023
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
10/31/2023
Objection resolved — Addressed
10/18/2023
Objection resolved — Addressed
10/18/2023
Objection resolved — Addressed
10/16/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/13/2023
Objection raised — Admin
10/13/2023
Objection raised — Mechanical
10/13/2023
Objection raised — Scope
10/12/2023
Special inspection requirement — Tenant Protection Plan Compliance
MAURICIO ANDRADE
10/12/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
10/12/2023
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
10/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
10/06/2023
Filed — Alteration
PROPOSE PLUMBING WORK AT EXISTING APARTMENTS 2R & 3R. MINOR PARTITION AND INTERIOR FINISHES AS PER PLAN. THE GENERAL CONSTRUCTION WORK WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08024762-P2
10/06/2023
Filed — Alteration
PROPOSE PLUMBING WORKS ON EXISTING 1ST FLOOR APT #1R AT EXISTING 3 STORIES WITH CELLAR BUILDING AS PER PLAN. THE GENERAL CONSTRUCTION WORK WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00866482-P1
10/05/2023
Special inspection requirement — Tenant Protection Plan Compliance
10/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
10/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
10/05/2023
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
09/08/2023
Objection raised — Admin
09/08/2023
Objection raised — Admin
09/08/2023
Objection resolved — Addressed
09/05/2023
Violation issued (ECB, closed)
Construction
08/31/2023
Objection resolved — Addressed
08/31/2023
Objection resolved — Addressed
08/31/2023
Objection resolved — Addressed
08/29/2023
Objection resolved — Addressed
08/21/2023
Objection raised — Cost
08/21/2023
Objection raised — Other
08/21/2023
Objection raised — Other
08/21/2023
Objection raised — Scope
08/16/2023
Filed — Alteration
PROPOSE INTERIOR RENOVATION WORKS ON EXISTING 2ND FLOOR & 3RD FLOOR (UNIT 2L & 3L) AT EXISTING 3 STORIES WITH CELLAR BUILDING AS PER PLAN. THE PLUMBING WORK WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00917458-I1
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offORLO CONSTRUCTION LLC12/15/2023
DOB NOWPlumbingSigned-offN AND S PLUMBING INC12/06/2023
DOB NOWGeneral ConstructionSigned-offORLO CONSTRUCTION LLC12/06/2023
DOB NOWMechanical SystemsSigned-offORLO CONSTRUCTION LLC07/18/2023
DOB NOWGeneral ConstructionSigned-offORLO CONSTRUCTION LLC06/02/2023
DOB NOWPlumbingSigned-offN AND S PLUMBING INC05/22/2023
DOB NOWPlumbingSigned-offN AND S PLUMBING INC05/22/2023
DOB NOWGeneral ConstructionSigned-offORLO CONSTRUCTION LLC11/15/2022
2 projects · most recent 02/19/2024
General Wiring
FiledStatusContractorScope
02/19/2024CompletePLATINUM PWR ELECTL CONTGeneral Wiring
11/07/2023CompletePLATINUM PWR ELECTL CONTGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/29/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/09/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/28/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/14/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
11/06/2023HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
11/06/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
11/06/2023Tenant Protection Plan ComplianceMAURICIO ANDRADEspecial
11/06/2023Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
10/12/2023Tenant Protection Plan ComplianceMAURICIO ANDRADEspecial
10/12/2023HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
10/12/2023Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
10/12/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
10/05/2023Tenant Protection Plan Compliance—special
10/05/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
10/05/2023HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
10/05/2023Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
06/28/2023HVAC-R and service water heating equipmentMAURICIO ANDRADEenergy_progress
06/28/2023Tenant Protection Plan ComplianceMAURICIO ANDRADEspecial
06/28/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
06/28/2023Mechanical SystemsMAURICIO ANDRADEspecial
06/28/2023Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
06/28/2023FinalMAURICIO ANDRADEprogress
06/28/2023HVAC-R and service water heating system controlsMAURICIO ANDRADEenergy_progress
06/28/2023HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
05/18/2023Fenestration air leakageMAURICIO ANDRADEenergy_progress
05/18/2023Fenestration areasMAURICIO ANDRADEenergy_progress
05/18/2023Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
05/04/2023Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
05/04/2023FinalMAURICIO ANDRADEprogress
Latest 25 of 48.
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/28/2026B08024762-P1Request digital key ↗
08/28/2026B08024762-P2Request digital key ↗
08/28/2026B08024762-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications43
▸DOB NOWProgress Inspector Seal & Signature20
09/01/2026B08024761-P1Open ↗
09/01/2026B08024761-P1Open ↗
09/01/2026B08024761-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/28/2026B08024762-P1Open ↗
08/28/2026B08024762-P2Open ↗
08/28/2026B08024762-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026B08024761-P1Open ↗
09/01/2026B00897574-I1Open ↗
08/29/2026B00866481-I1Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/28/2026B08024762-I1Open ↗
08/28/2026B08024762-P1Open ↗
08/28/2026B08024762-P2Open ↗
Showing 3 of 13 on file for this type