Office with commercial, 1-6 stories
The Firefighter Dan DeFranci Building
204 EAST 23 STREET · Name © OpenStreetMap contributors · Gramercy · BIN 1019664
💬 Discuss this project
1959Year Built
5Stories
O5Building Class
C2-8AZoning
32,369 sfGross Floor Area
7Units
LL97 Covered14 Open Violations ▸
Office with commercial, 1-6 stories · 6,517 sf lot · 4.97 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalEquipmentLandscapeGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction16p · 1 filing · 7 docs
BulkheadUnder Construction1p · 1 filing · 7 docs
Floor 55p · 3 filings · 20 docs
Floor 46p · 3 filings · 20 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THE FIREFIGHTER REALTY3009/13/2026
LISA MANAGEMENT108/26/2026
DISCOUN REALTY CO INC103/22/2026
J & M REALTY SERVICES203/21/2026
EAST SIDE COMMUNITY GROUP FOR SE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.1203/21/2026
EUROCELT EXPEDITING, INC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LAWRENCE J. LEVINEFire Protection703/21/2026
PLATFORM SOLUTIONS, INCGeneral Contractor708/07/2026
STRUCTURE TONE, LLCGeneral Contractor507/08/2026
PAR PLUMBING CO., INCPlumbing207/08/2026
PJP INSTALLERS INCGeneral Contractor108/26/2026
HEMSING, ROBERTElectrical103/21/2026
SHORT, HENRYElectrical103/21/2026
DANIEL LEITERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC2003506/16/2026
SONI ENGINEERING CONSULTI9819105/18/2026
HOFFMANN ARCHITECTS AND E9044104/24/2026
Building Lifecycle
All (120)Filed (15)Permit Issued (14)Signed Off (6)Violation (57)Inspection (4)Special Inspection (24)
08/25/2026
Filed — Alteration
M01449183-I1
08/25/2026
Permit issued — Sidewalk Shed
M01449183-I1-SH
08/13/2026
Signed off — Alteration
Installation of new plumbing fixtures on floors 4 and 5. No change to use, egress, or occupancy.
M01252369-I1
08/06/2026
Permit issued — Sidewalk Shed
M01229542-I1-SH
08/05/2026
Permit issued — Supported Scaffold
M01268026-I1-SF
06/30/2026
Signed off — Alteration
Mechanical modifications of the 4th and 5th floor as per plans filed herewith. No change to use, egress, or occupancy.
M01252360-I1
06/18/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
06/18/2026
Special inspection requirement — Final
Christopher Drutjons
06/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
06/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
06/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
06/16/2026
Filed — Alteration
Mechanical modifications of the 4th and 5th floor as per plans filed herewith. No change to use, egress, or occupancy.
M01252360-P1
05/21/2026
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33
M01268026-P2
05/21/2026
Permit issued — Suspended Scaffold
M01403085-I1-SC
05/18/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
M01403085-I1
05/15/2026
Permit issued — Sidewalk Shed
M01229542-I1-SH
05/15/2026
Special inspection requirement — Post-installed Anchors
nayan soni
05/15/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
05/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
nayan soni
05/06/2026
Permit issued — General Construction
M01378701-I1-GC-CX
04/24/2026
Filed — Alteration
M01378701-I1
04/20/2026
Special inspection requirement — Structural Steel - Details
Christopher Drutjons
03/26/2026
Special inspection requirement — Insulation placement and R values
Juan Kuriyama
03/26/2026
Special inspection requirement — Masonry
Juan Kuriyama
03/26/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
03/26/2026
Special inspection requirement — Structural Steel - Welding
Christopher Drutjons
03/26/2026
Special inspection requirement — Final
Lawrence Keenan
03/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
03/24/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
03/24/2026
Special inspection requirement — Final
Christopher Drutjons
03/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
03/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
03/19/2026
Signed off — Alteration
M01252321-I1
03/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/12/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/24/2025
Signed off — Alteration
M01219829-I1
10/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/08/2025
Permit issued — Plumbing
M01252369-I1-PL
10/06/2025
Signed off — Alteration
ALTERATION FILED FOR INTERIOR GUT DEMOLITION (WALLS, DOORS, FLOOR FINISHES,PLUMBING FIXTURES, LIGHTING FIXTURES, AND CEILINGS) AS PER THE PLANS.NO CHANGES TO THE USE, OCCUPANCY, OR EGRESS AS PART OF THIS ALTERATION.WORK TO BE PERFORMED ON FLOORS 4TH & 5TH
M01219807-I1
10/06/2025
Signed off — Alteration
Mechanical demo and removal of air cooled split AC as per plans filed herewith. No change to use, egress, or occupancy.
M01219818-I1
10/06/2025
Permit issued — Mechanical Systems
M01252360-I1-MS
10/03/2025
Filed — Alteration
Mechanical modifications of the 4th and 5th floor as per plans filed herewith. No change to use, egress, or occupancy.
M01252360-I1
10/03/2025
Permit issued — General Construction
M01252321-I1-GC
10/02/2025
Filed — Alteration
Installation of new plumbing fixtures on floors 4 and 5. No change to use, egress, or occupancy.
M01252369-I1
10/01/2025
Filed — Alteration
M01252321-I1
08/22/2025
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33
M01268026-P1
08/08/2025
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33
M01268026-I1
08/08/2025
Permit issued — Supported Scaffold
M01268026-I1-SF
05/30/2025
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
M01229542-P1
05/22/2025
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
M01229542-I1
05/22/2025
Permit issued — Mechanical Systems
M01219818-I1-MS
05/22/2025
Permit issued — Sidewalk Shed
M01229542-I1-SH
05/15/2025
Permit issued — General Construction
M01219807-I1-GC
05/12/2025
Permit issued — Plumbing
M01219829-I1-PL
05/09/2025
Filed — Alteration
M01219829-I1
05/09/2025
Filed — Alteration
ALTERATION FILED FOR INTERIOR GUT DEMOLITION (WALLS, DOORS, FLOOR FINISHES,PLUMBING FIXTURES, LIGHTING FIXTURES, AND CEILINGS) AS PER THE PLANS.NO CHANGES TO THE USE, OCCUPANCY, OR EGRESS AS PART OF THIS ALTERATION.WORK TO BE PERFORMED ON FLOORS 4TH & 5TH
M01219807-I1
05/09/2025
Filed — Alteration
Mechanical demo and removal of air cooled split AC as per plans filed herewith. No change to use, egress, or occupancy.
M01219818-I1
05/02/2025
Special inspection requirement — Final
Christopher Drutjons
05/02/2025
Special inspection requirement — Final
Christopher Drutjons
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPJP INSTALLERS INC08/25/2026
DOB NOWSidewalk ShedPermit IssuedPLATFORM SOLUTIONS, INC08/06/2026
DOB NOWSupported ScaffoldPermit IssuedPLATFORM SOLUTIONS, INC08/05/2026
DOB NOWSuspended ScaffoldPermit IssuedDNA CONTRACTING LLC05/21/2026
DOB NOWSidewalk ShedPermit IssuedPLATFORM SOLUTIONS, INC05/15/2026
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURE TONE, LLC05/06/2026
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC10/08/2025
DOB NOWMechanical SystemsSigned-offSTRUCTURE TONE, LLC10/06/2025
DOB NOWGeneral ConstructionSigned-offSTRUCTURE TONE, LLC10/03/2025
DOB NOWSupported ScaffoldPermit IssuedPLATFORM SOLUTIONS, INC08/08/2025
DOB NOWMechanical SystemsSigned-offSTRUCTURE TONE, LLC05/22/2025
DOB NOWSidewalk ShedPermit IssuedPLATFORM SOLUTIONS, INC05/22/2025
DOB NOWGeneral ConstructionSigned-offSTRUCTURE TONE, LLC05/15/2025
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC05/12/2025
BISPLISSUEDRELIABLE PLBG & HTG CORP11/05/2014
BISOTISSUEDG.R.&J HUB HOME IMPROVE10/31/2014
BIS—ISSUEDH.M. HUGES CO INC10/23/2012
BISPLISSUEDPAR PLUMBING CO., INC07/23/2012
BISOTISSUEDH.M. HUGHES CO. INC07/13/2012
BISMHISSUEDANJ CONSTRUCTION CORP07/06/2011
BISMHISSUEDKABACK ENTERPRISES INC08/10/2010
BISMHISSUEDAMC MECHANICAL SERVICES INC07/03/2007
BIS—ISSUEDKENT CONTRACTING INC12/29/1998
BISMHISSUEDSTANDARD REFRIGERATORS04/06/1992
BISPLISSUEDJ.E.S.PLUMBING & HEATING02/04/1992
BISOTISSUEDLYONS-MINSKOFF INC12/27/1991
1 project · most recent 06/16/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/16/2026Signed-offSTRUCTURE TONE, LLCAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MUZ-GX24NL 2 tons · Heat Pump Outdoor ×1
PEAD-AA30NL 883 CFM · Vrf Indoor ×1
SUZ-AA30NL 27,000 BTU · Heat Pump Outdoor ×1
Ventilation
Mitsubishi Electric MSZ-GX24NL 765 CFM · Split System ×1
1 project · most recent 10/02/2025
Water/Sanitary
FiledStatusContractorScope
10/02/2025Signed-offPAR PLUMBING CO., INCWater/Sanitary
3 projects · most recent 08/21/2026
General Wiring
FiledStatusContractorScope
08/21/2026Permit IssuedTOP SHELF ELECTRIC CORP—
02/25/2026CompleteUNI-LITE ELECTRIC, LLCGeneral Wiring
06/06/2025Permit IssuedSOLAS ELECTRICAL CORP—
2 projects · most recent 05/21/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/21/2026Permit IssuedPLATFORM SOLUTIONS, INCScaffold
05/30/2025Permit IssuedPLATFORM SOLUTIONS, INCSidewalk Shed
1 project · most recent 05/18/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/18/2026Permit IssuedDNA CONTRACTING LLCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
06/18/2026Mechanical SystemsChristopher Drutjonsspecial
06/18/2026FinalChristopher Drutjonsprogress
06/18/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
06/18/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
06/18/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
05/15/2026Post-installed Anchorsnayan sonispecial
05/15/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
05/15/2026Structural Stability – Alterations of existing buildingsnayan sonispecial
04/20/2026Structural Steel - DetailsChristopher Drutjonsspecial
03/26/2026Insulation placement and R valuesJuan Kuriyamaenergy_progress
03/26/2026MasonryJuan Kuriyamaspecial
03/26/2026Post-installed AnchorsChristopher Drutjonsspecial
03/26/2026Structural Steel - WeldingChristopher Drutjonsspecial
03/26/2026FinalLawrence Keenanprogress
03/24/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
03/24/2026Mechanical SystemsChristopher Drutjonsspecial
03/24/2026FinalChristopher Drutjonsprogress
03/24/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
03/24/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
05/02/2025FinalChristopher Drutjonsprogress
05/02/2025FinalChristopher Drutjonsprogress
05/02/2025FinalChristopher Drutjonsprogress
05/02/2025Mechanical SystemsChristopher Drutjonsspecial
05/02/2025Mechanical SystemsChristopher Drutjonsspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Uniformed Firefighters AssociationOfficeFloors 4, 5
Project M01252321 Alteration · LOC Issued · 10/01/2025
Project M01219807 Alteration · LOC Issued · 05/09/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 144 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/06/2026M01378701-I1Request digital key ↗
08/26/2026M01449183-I1Request digital key ↗
08/23/2026M01219818-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits21
▸BISWORK PERMIT APPLICATION8
11/10/2014122176037Open ↗
11/10/2014122176037Open ↗
10/26/2012121361864Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
10/28/2014122176037Open ↗
09/04/2012121361864Open ↗
06/28/2012120749253Open ↗
Showing 3 of 7 on file for this type
▸BISPLACE OF ASSEMBLY2
01/31/2013121385376Open ↗
09/21/2012121385376Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
12/13/2012121361864Open ↗
12/13/2012121361864Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
01/31/2013121385376Open ↗
01/31/2013121385376Open ↗
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/06/2026M01378701-I1Open ↗
08/26/2026M01449183-I1Open ↗
08/23/2026M01219807-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026M01252360-I1Open ↗
08/31/2026M01252360-P1Open ↗
08/28/2026M01378701-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026M01252360-I1Open ↗
09/23/2026M01252360-I1Open ↗
08/31/2026M01252360-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
03/23/2016122176037Open ↗
10/28/2014122176037Open ↗
01/31/2013121385376Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
10/28/2014122176037Open ↗
09/21/2012121385376Open ↗
09/04/2012121361864Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
09/04/2012121361864Open ↗
07/08/2011120749253Open ↗
08/13/2010120431611Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/28/2014122176037Open ↗
▸Trade Schedules & Equipment11
▸BISSELF-CERT PLUMBING NOTICE4
01/20/2015122176037Open ↗
12/12/2014122176037Open ↗
11/29/2012120749253Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS2
10/26/2010120431611Open ↗
10/04/2010120431611Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/26/2010120431611Open ↗
10/04/2010120431611Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
09/30/2013120948993Open ↗
▸BISSCHEDULE B - PLUMBING1
07/08/2011120749253Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/28/2014122176037Open ↗
▸Safety & Tenant Protection1
▸BISST-1 Street Tree Checklist1
09/04/2012121361864Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/23/2026M01219807-I1Open ↗
08/23/2026M01219829-I1Open ↗
08/21/2026M01252321-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
01/20/2012120948993Open ↗
07/08/2011120749253Open ↗
08/13/2010120431611Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/28/2014122176037Open ↗
08/13/2010120431611Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/06/2026M01378701-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/23/2016122176037Open ↗
10/28/2014122176037Open ↗
▸BISTECHNICAL REPORT: ENERGY1
07/08/2011120749253Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/23/2016122176037Open ↗
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
03/23/2016122176037Open ↗
05/14/2013121361864Open ↗
04/30/2013121361864Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
09/21/2012121385376Open ↗
09/04/2012121361864Open ↗
01/20/2012120948993Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/31/2020120749253Open ↗
01/31/2013121385376Open ↗
01/31/2013121385376Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE2
09/04/2012121361864Open ↗
09/04/2012121361864Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
03/23/2016122176037Open ↗
10/28/2014122176037Open ↗
09/04/2012121361864Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET5
10/28/2014122176037Open ↗
09/04/2012121361864Open ↗
01/20/2012120948993Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION1
06/28/2012120749253Open ↗
▸Other Documents3
▸BISPlot Diagram1
09/04/2012121361864Open ↗
▸DOB NOWManufacturer's Specifications1
08/17/2026M01403085-I1Open ↗
▸DOB NOWCalculations1
08/17/2026M01403085-I1Open ↗