← Back
One family attached or semi-detached
204 MIDWOOD STREET
BROOKLYN · BIN 3115174
💬 Discuss this project
1910Year Built
2Stories
A5Building Class
R2Zoning
1,800 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
One family attached or semi-detached · 2,000 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Roof10p · 4 filings · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Basement4p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/24/2021$1.7M—Private party → Private party$958/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BENDIX ENGINEERING, P.C.406/26/2024
CELIN MUNOZ CONSULTING ENGINEER, PC310/11/2023
BEN HERZOG ARCHITECT PC205/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIGHT WAY SERVICES NYC1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BMB BUILDER INCGeneral Contractor807/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CELIN MUNOZ CONSULTING EN1064510/11/2023
BEN HERZOG ARCHITECT, PC1544205/15/2023
BENDIX ENGINEERING, P.C.4293103/09/2022
Building Lifecycle
All (70)Filed (9)Permit Issued (6)Signed Off (5)Violation (6)Objection (14)Special Inspection (30)
01/23/2025
Signed off — Alteration
Interior and Exterior renovation consisting of removal and installation of no-load bearing partition for modified layout, replacement of windows and doors replacement as per plan. No change to use egress or occupancy under this application.
B00679386-I1
11/18/2024
Signed off — Alteration
B00685585-S1
11/18/2024
Signed off — Alteration
B00685585-I1
11/01/2024
Signed off — Alteration
Domestic plumbing work in conjunction with gut rehab architectural renovations. No change to use egress or occupancy under this application
B00685594-I1
07/25/2024
Objection resolved — Addressed
07/02/2024
Objection raised — Scope
06/26/2024
Filed — Alteration
Domestic plumbing work in conjunction with gut rehab architectural renovations. No change to use egress or occupancy under this application
B00685594-P2
06/20/2024
Signed off — Alteration
Mechanical Systems work to consist of installation of new HVAC electrical split system for heating and cooling, comprised of made of one exterior roof top condenser and multiple interior air handler units. in conjunction with gut rehab.
B00685623-I1
10/23/2023
Permit issued — Foundation
B00685585-S1-FO
10/11/2023
Filed — Alteration
B00685585-S1
10/10/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Celin Munoz
10/10/2023
Special inspection requirement — Structural Steel - Welding
Celin Munoz
10/10/2023
Special inspection requirement — Structural Cold-Formed Steel
Celin Munoz
10/10/2023
Special inspection requirement — Structural Wood Frame
Celin Munoz
10/10/2023
Special inspection requirement — Final
Celin Munoz
10/10/2023
Special inspection requirement — Masonry
Celin Munoz
10/10/2023
Special inspection requirement — Post-installed Anchors
Celin Munoz
10/10/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Celin Munoz
10/10/2023
Special inspection requirement — Structural Steel - Details
Celin Munoz
10/02/2023
Special inspection requirement — Post-installed Anchors
Celin Munoz
10/02/2023
Special inspection requirement — Concrete - Cast-In-Place
Celin Munoz
10/02/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Celin Munoz
10/02/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Celin Munoz
10/02/2023
Special inspection requirement — Subgrade Inspections
Celin Munoz
09/27/2023
Special inspection requirement — Footing and Foundation
Celin Munoz
09/27/2023
Special inspection requirement — Final
Celin Munoz
08/10/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Celin Munoz
07/27/2023
Filed — Alteration
B00685585-P1
07/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Herzog
07/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Benjamin Herzog
07/27/2023
Special inspection requirement — Fire-Resistance Rated Construction
Benjamin Herzog
07/27/2023
Special inspection requirement — Final
Benjamin Herzog
07/27/2023
Special inspection requirement — Fenestration air leakage
Benjamin Herzog
07/27/2023
Special inspection requirement — Interior lighting power
Benjamin Herzog
07/27/2023
Special inspection requirement — Air barrier - visual inspection
Benjamin Herzog
07/27/2023
Special inspection requirement — Permanent certificate
Benjamin Herzog
07/27/2023
Special inspection requirement — Insulation placement and R values
Benjamin Herzog
07/27/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Benjamin Herzog
07/27/2023
Special inspection requirement — Fenestration areas
Benjamin Herzog
07/26/2023
Objection raised — Zoning
07/26/2023
Objection resolved — Addressed
07/24/2023
Objection resolved — Addressed
07/21/2023
Objection resolved — Addressed
07/21/2023
Objection resolved — Addressed
07/21/2023
Special inspection requirement — Structural Cold-Formed Steel
Celin Munoz
07/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Celin Munoz
06/15/2023
Filed — Alteration
Domestic plumbing work in conjunction with gut rehab architectural renovations. No change to use egress or occupancy under this application
B00685594-P1
05/18/2023
Objection raised — Scope
05/18/2023
Objection raised — Admin
05/18/2023
Objection raised — Admin
05/15/2023
Filed — Alteration
Interior and Exterior renovation consisting of removal and installation of no-load bearing partition for modified layout, replacement of windows and doors replacement as per plan. No change to use egress or occupancy under this application.
B00679386-P1
04/24/2023
Permit issued — General Construction
B00679386-I1-GC
04/24/2023
Permit issued — Structural
B00685585-I1-ST
03/02/2023
Permit issued — Structural
B00685585-I1-ST
02/24/2023
Permit issued — Mechanical Systems
B00685623-I1-MS
02/24/2023
Permit issued — General Construction
B00679386-I1-GC
04/13/2022
Objection resolved — Addressed
03/11/2022
Objection raised — Fire_Protection
03/11/2022
Objection resolved — Addressed
03/11/2022
Objection raised — Scope
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offBMB BUILDER INC10/23/2023
DOB NOWGeneral ConstructionSigned-offBMB BUILDER INC04/24/2023
DOB NOWStructuralSigned-offBMB BUILDER INC04/24/2023
DOB NOWStructuralSigned-offBMB BUILDER INC03/02/2023
DOB NOWMechanical SystemsSigned-offBMB BUILDER INC02/24/2023
DOB NOWGeneral ConstructionSigned-offBMB BUILDER INC02/24/2023
1 project · most recent 06/28/2023
General Wiring
FiledStatusContractorScope
06/28/2023CompleteAERO ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
10/10/2023Structural Stability – Alterations of existing buildingsCelin Munozspecial
10/10/2023Structural Steel - WeldingCelin Munozspecial
10/10/2023Structural Cold-Formed SteelCelin Munozspecial
10/10/2023Structural Wood FrameCelin Munozprogress
10/10/2023FinalCelin Munozprogress
10/10/2023MasonryCelin Munozspecial
10/10/2023Post-installed AnchorsCelin Munozspecial
10/10/2023Structural Steel - High Strength BoltingCelin Munozspecial
10/10/2023Structural Steel - DetailsCelin Munozspecial
10/02/2023Post-installed AnchorsCelin Munozspecial
10/02/2023Concrete - Cast-In-PlaceCelin Munozspecial
10/02/2023Structural Stability – Alterations of existing buildingsCelin Munozspecial
10/02/2023Subsurface Investigations (Borings/Test Pits)Celin Munozspecial
10/02/2023Subgrade InspectionsCelin Munozspecial
09/27/2023Footing and FoundationCelin Munozprogress
09/27/2023FinalCelin Munozprogress
08/10/2023Structural Steel - High Strength BoltingCelin Munozspecial
07/27/2023Fire-Resistant Penetrations and JointsBenjamin Herzogspecial
07/27/2023Energy Code Compliance InspectionsBenjamin Herzogprogress
07/27/2023Fire-Resistance Rated ConstructionBenjamin Herzogprogress
07/27/2023FinalBenjamin Herzogprogress
07/27/2023Fenestration air leakageBenjamin Herzogenergy_progress
07/27/2023Interior lighting powerBenjamin Herzogenergy_progress
07/27/2023Air barrier - visual inspectionBenjamin Herzogenergy_progress
07/27/2023Permanent certificateBenjamin Herzogenergy_progress
Latest 25 of 55.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/31/2026B00685585-I1Request digital key ↗
08/31/2026B00685585-P1Request digital key ↗
08/31/2026B00685585-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit9
08/31/2026B00685585-I1Open ↗
08/31/2026B00685585-S1Open ↗
08/31/2026B00679386-I1Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications59
▸DOB NOWProgress Inspector Seal & Signature28
09/23/2026B00685585-S1Open ↗
09/23/2026B00685585-S1Open ↗
08/31/2026B00685585-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/23/2026B00685585-S1Open ↗
09/23/2026B00685585-S1Open ↗
09/23/2026B00685585-S1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/31/2026B00685585-I1Open ↗
08/31/2026B00685585-P1Open ↗
08/31/2026B00685585-S1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/31/2026B00685585-S1Open ↗
08/31/2026B00685585-I1Open ↗
08/31/2026B00685585-P1Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00679386-I1Open ↗
08/13/2026B00685623-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/31/2026B00685585-S1Open ↗
▸DOB NOWSOIL REPORT1
08/31/2026B00685585-S1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/31/2026B00685585-S1Open ↗