← Back
BuildNYC
One family attached or semi-detached
204 MIDWOOD STREET
BROOKLYN · BIN 3115174
💬 Discuss this project
1910Year Built
2Stories
A5Building Class
R2Zoning
1,800 sfGross Floor Area
1Units
1 Active Violation ▸FDNY Report ↗
One family attached or semi-detached · 2,000 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDemolition and framing, second floor and rear deck56p · 4 filings · 20 docs
Floor 2Unit PH047p · 4 filings · 20 docs
Floor 1Demolition and framing, second floor and rear deck47p · 4 filings · 20 docs
Cellar20p · 1 filing · 12 docs
Basement5p · 2 filings · 20 docs
Sub-BasementDemolition and framing, second floor and rear deck45p · 4 filings · 20 docs
Site & exteriorDemolition and framing, second floor and rear deck6p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/24/2021$1.7M—Private party → Private party$958/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bendix Engineering406/26/2024
Celin Munoz Consulting Engineering310/11/2023
Ben Herzog Architect205/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Right Way Services NYC1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BMB BuilderGeneral Contractor707/08/2026
BMB Builderspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Celin Munoz Consulting EN1064510/11/2023
Ben Herzog Architect1544205/15/2023
Bendix Engineering4293103/09/2022
Building Lifecycle
01/23/2025
Signed off — Alteration
Interior and Exterior renovation consisting of removal and installation of no-load bearing partition for modified layout, replacement of windows and doors replacement as per plan. No change to use egress or occupancy under this application.
B00679386-I1
01/03/2025
Closed: Landmark (DOB violation)
DOB violation · closed on the city's record
11/18/2024
Signed off — Alteration
B00685585-S1
11/18/2024
Signed off — Alteration
B00685585-I1
11/01/2024
Signed off — Alteration
Domestic plumbing work in conjunction with gut rehab architectural renovations. No change to use egress or occupancy under this application
B00685594-I1
74 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offBMB Builder10/23/2023
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp05/19/2023
DOB NOWStructuralSigned-offBMB Builder04/24/2023
DOB NOWGeneral ConstructionSigned-offBMB Builder04/24/2023
DOB NOWStructuralSigned-offBMB Builder03/02/2023
DOB NOWMechanical SystemsSigned-offBMB Builder02/24/2023
DOB NOWGeneral ConstructionSigned-offBMB Builder02/24/2023
1 project · most recent 06/28/2023
General Wiring
FiledStatusContractorScope
06/28/2023CompleteAero ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/27/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
10/10/2023MasonryCelin Munozspecial
10/10/2023Structural Wood FrameCelin Munozprogress
10/10/2023FinalCelin Munozprogress
10/10/2023Structural Cold-Formed SteelCelin Munozspecial
10/10/2023Structural Steel - WeldingCelin Munozspecial
10/10/2023Structural Stability – Alterations of existing buildingsCelin Munozspecial
10/10/2023Structural Steel - DetailsCelin Munozspecial
10/10/2023Structural Steel - High Strength BoltingCelin Munozspecial
10/10/2023Post-installed AnchorsCelin Munozspecial
10/02/2023Concrete - Cast-In-PlaceCelin Munozspecial
10/02/2023Structural Stability – Alterations of existing buildingsCelin Munozspecial
10/02/2023Subsurface Investigations (Borings/Test Pits)Celin Munozspecial
10/02/2023Subgrade InspectionsCelin Munozspecial
10/02/2023Post-installed AnchorsCelin Munozspecial
09/27/2023Footing and FoundationCelin Munozprogress
09/27/2023FinalCelin Munozprogress
08/10/2023Structural Steel - High Strength BoltingCelin Munozspecial
07/27/2023Air barrier - visual inspectionBenjamin Herzogenergy_progress
07/27/2023Permanent certificateBenjamin Herzogenergy_progress
07/27/2023Fenestration and door U-factor and product ratingsBenjamin Herzogenergy_progress
07/27/2023Insulation placement and R valuesBenjamin Herzogenergy_progress
07/27/2023Fenestration areasBenjamin Herzogenergy_progress
07/27/2023Fire-Resistant Penetrations and JointsBenjamin Herzogspecial
07/27/2023Energy Code Compliance InspectionsBenjamin Herzogprogress
07/27/2023Fire-Resistance Rated ConstructionBenjamin Herzogprogress
Latest 25 of 55.
91 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account