204 WASHINGTON PARK
BROOKLYN · BIN 3058416
💬 Discuss this project
1870Year Built
4Stories
C2Building Class
R6BZoning
5,936 sfGross Floor Area
5Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: 204 WASHINGTON HOLDINGS LLC · 2,300 sf lot · 2.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Roof2p · 1 filing · 20 docs
Floor 438p · 1 filing · 20 docs
Floor 340p · 2 filings · 20 docs
Floor 235p · 2 filings · 20 docs
Floor 137p · 2 filings · 20 docs
Cellar41p · 2 filings · 20 docs
Basement39p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS607/08/2026
204 WASHINGTON HOLDINGS LLC103/22/2026
204 WASHINGTON PARK TML C103/22/2026
JASOL REALTY CORP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/18/2018$4.5M—— → —$758/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BARKER FREEMAN DESIGN OFFICE904/14/2025
ALBANNA ENGINEERING PC703/14/2025
AG ENGINEERING PLLC110/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M W EXPEDITING803/21/2026
ARSENAL BUILDING CONSULTANTS LLC203/21/2026
ANZALONE ARCHITECTURE1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GTN RENOVATION INCGeneral Contractor2307/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor407/08/2026
FLYTIGER P & H LTDPlumbing307/08/2026
FLYTIGER PLB & HTG LTDFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALBANNA ENGINEERING PC24011004/14/2025
Building Lifecycle
All (158)Filed (17)Permit Issued (17)Signed Off (5)Violation (53)Inspection (8)Objection (28)Special Inspection (30)
05/06/2026
Violation issued (HPD, open)
A
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/20/2025
Signed off — Alteration CO
Structural plans, lower portion of cellar floor, and new slab in grade, reconstruct rear wall, relocate stair and minor framing as per plans, no change to use, egress or occupancy.
B08031416-S1
07/02/2025
Permit issued — General Construction
B08031416-I1-GC
06/11/2025
Violation issued (HPD, open)
A
04/25/2025
Signed off — Alteration CO
Structural plans, lower portion of cellar floor, and new slab in grade, reconstruct rear wall, relocate stair and minor framing as per plans, no change to use, egress or occupancy.
B08031416-S4
04/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ZAKI ALBANNA
04/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZAKI ALBANNA
04/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
ZAKI ALBANNA
04/22/2025
Special inspection requirement — Final
ZAKI ALBANNA
04/22/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
ZAKI ALBANNA
04/22/2025
Special inspection requirement — Mechanical Systems
ZAKI ALBANNA
04/22/2025
Special inspection requirement — Heating Systems
ZAKI ALBANNA
04/14/2025
Filed — Alteration CO
Structural plans, lower portion of cellar floor, and new slab in grade, reconstruct rear wall, relocate stair and minor framing as per plans, no change to use, egress or occupancy.
B08031416-P8
04/08/2025
Special inspection requirement — Mechanical Systems
ZAKI ALBANNA
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZAKI ALBANNA
04/08/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
ZAKI ALBANNA
04/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
ZAKI ALBANNA
04/08/2025
Special inspection requirement — Final
ZAKI ALBANNA
04/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ZAKI ALBANNA
04/08/2025
Special inspection requirement — Heating Systems
ZAKI ALBANNA
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZAKI ALBANNA
04/04/2025
Special inspection requirement — Sprinkler Systems
ZAKI ALBANNA
03/31/2025
Objection raised — Other
03/31/2025
Objection resolved — Addressed
03/21/2025
Signed off — Alteration CO
Structural plans, lower portion of cellar floor, and new slab in grade, reconstruct rear wall, relocate stair and minor framing as per plans, no change to use, egress or occupancy.
B08031416-S3
03/19/2025
Filed — Alteration CO
Structural plans, lower portion of cellar floor, and new slab in grade, reconstruct rear wall, relocate stair and minor framing as per plans, no change to use, egress or occupancy.
B08031416-P6
03/14/2025
Filed — Alteration CO
Structural plans, lower portion of cellar floor, and new slab in grade, reconstruct rear wall, relocate stair and minor framing as per plans, no change to use, egress or occupancy.
B08031416-P7
03/11/2025
Signed off — Alteration
Temporary construction fence in conjunction with construction applcation filed separately
B00837611-I1
03/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZAKI ALBANNA
03/11/2025
Special inspection requirement — Sprinkler Systems
ZAKI ALBANNA
03/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/24/2025
Permit issued — Foundation
B08031416-S1-GC
02/21/2025
Permit issued — Structural
B08031416-S1-FO
02/21/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/19/2025
Permit issued — Plumbing
B08031416-S4-PL
02/14/2025
Permit issued — General Construction
B08031416-I1-MS
02/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ZAKI ALBANNA
02/14/2025
Special inspection requirement — Concrete - Cast-In-Place
ZAKI ALBANNA
02/14/2025
Special inspection requirement — Structural Steel - Welding
ZAKI ALBANNA
02/14/2025
Special inspection requirement — Structural Cold-Formed Steel
ZAKI ALBANNA
02/14/2025
Special inspection requirement — Subgrade Inspections
ZAKI ALBANNA
02/14/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
ZAKI ALBANNA
02/14/2025
Special inspection requirement — Structural Steel - High Strength Bolting
ZAKI ALBANNA
02/14/2025
Special inspection requirement — Structural Steel - Details
ZAKI ALBANNA
02/14/2025
Special inspection requirement — Footing and Foundation
ZAKI ALBANNA
02/14/2025
Special inspection requirement — Final
ZAKI ALBANNA
02/07/2025
Objection resolved — Addressed
01/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/23/2025
Objection raised — Other
01/17/2025
Filed — Alteration CO
Structural plans, lower portion of cellar floor, and new slab in grade, reconstruct rear wall, relocate stair and minor framing as per plans, no change to use, egress or occupancy.
B08031416-P5
01/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/14/2025
Permit issued — Plumbing
B08031416-S4-EW-SP
01/07/2025
Special inspection requirement — Subgrade Inspections
ZAKI ALBANNA
01/07/2025
Special inspection requirement — Footing and Foundation
ZAKI ALBANNA
01/06/2025
Permit issued — Structural
B08031416-S1-ST
11/25/2024
Violation issued (HPD, closed)
I
11/11/2024
Filed — Alteration CO
Structural plans, lower portion of cellar floor, and new slab in grade, reconstruct rear wall, relocate stair and minor framing as per plans, no change to use, egress or occupancy.
B08031416-P4
09/26/2024
Signed off — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
B00947113-I1
Latest 60 of 158 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGTN RENOVATION INC07/02/2025
DOB NOWFoundationSigned-offGTN RENOVATION INC02/24/2025
DOB NOWStructuralSigned-offGTN RENOVATION INC02/21/2025
DOB NOWPlumbingSigned-offFLYTIGER P & H LTD02/19/2025
DOB NOWGeneral ConstructionSigned-offGTN RENOVATION INC02/14/2025
DOB NOWPlumbingSigned-offFLYTIGER PLB & HTG LTD01/14/2025
DOB NOWStructuralSigned-offGTN RENOVATION INC01/06/2025
DOB NOWPlumbingSigned-offFLYTIGER P & H LTD09/06/2024
DOB NOWGeneral ConstructionPermit IssuedGTN RENOVATION INC07/02/2024
DOB NOWGeneral ConstructionPermit IssuedGTN RENOVATION INC06/20/2024
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS10/26/2023
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS10/26/2023
DOB NOWPlumbingSigned-offFLYTIGER P & H LTD08/29/2023
DOB NOWMechanical SystemsPermit IssuedGTN RENOVATION INC07/05/2023
DOB NOWConstruction FenceSigned-offGTN RENOVATION INC06/27/2023
DOB NOWGeneral ConstructionPermit IssuedGTN RENOVATION INC03/22/2023
DOB NOWConstruction FenceSigned-offGTN RENOVATION INC03/17/2023
BISOTISSUEDBRIAN & CO GENERAL CONTRACTING03/10/2005
BISPLISSUEDTHE PLBG COPMPANY INC06/28/2004
BISOTISSUEDBRIAN & CO GENERAL CONTRACTING01/13/2004
1 project · most recent 04/14/2025
Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
04/14/2025Permit IssuedGTN RENOVATION INCAir Conditioning Systems, Associated Ducts and Piping
Cooling
Mitsubishi Electric MXZ-4C36NA2-U1 36,000 BTU · Split System ×2
MXZ-8C48NA2-U1 48,000 BTU · Vrf Outdoor ×1
MXZ-SM60NAM2-U1 60,000 BTU · Split System ×2
MXZ-SM60NAM-U1 60,000 BTU · Split System ×1
Ducts & Piping
N/A TBD Ahu ×2
1 project · most recent 04/14/2025
Sprinkler System
FiledStatusContractorScope
04/14/2025Signed-offFLYTIGER PLB & HTG LTDSprinkler System
1 project · most recent 04/14/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/14/2025Signed-offFLYTIGER P & H LTDGas, Storm, Water/Sanitary
2 projects · most recent 10/12/2023
General Wiring Lighting
FiledStatusContractorScope
10/12/2023CompleteRICHARD NEU—
06/27/2023CompleteHI-RITE ELECTRIC CORPGeneral Wiring, Lighting
1 project · most recent 04/14/2025
Steel Concrete Wood
FiledStatusContractorScope
04/14/2025Permit IssuedGTN RENOVATION INCSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/21/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
04/22/2025Structural Stability – Alterations of existing buildingsZAKI ALBANNAspecial
04/22/2025Fire-Resistant Penetrations and JointsZAKI ALBANNAspecial
04/22/2025Fire-Resistance Rated ConstructionZAKI ALBANNAprogress
04/22/2025FinalZAKI ALBANNAprogress
04/22/2025Construction Operations Influencing Adjacent StructuresZAKI ALBANNAspecial
04/22/2025Mechanical SystemsZAKI ALBANNAspecial
04/22/2025Heating SystemsZAKI ALBANNAspecial
04/08/2025Mechanical SystemsZAKI ALBANNAspecial
04/08/2025Fire-Resistant Penetrations and JointsZAKI ALBANNAspecial
04/08/2025Construction Operations Influencing Adjacent StructuresZAKI ALBANNAspecial
04/08/2025Fire-Resistance Rated ConstructionZAKI ALBANNAprogress
04/08/2025FinalZAKI ALBANNAprogress
04/08/2025Structural Stability – Alterations of existing buildingsZAKI ALBANNAspecial
04/08/2025Heating SystemsZAKI ALBANNAspecial
04/04/2025Fire-Resistant Penetrations and JointsZAKI ALBANNAspecial
04/04/2025Sprinkler SystemsZAKI ALBANNAspecial
03/11/2025Fire-Resistant Penetrations and JointsZAKI ALBANNAspecial
03/11/2025Sprinkler SystemsZAKI ALBANNAspecial
02/14/2025Structural Stability – Alterations of existing buildingsZAKI ALBANNAspecial
02/14/2025Concrete - Cast-In-PlaceZAKI ALBANNAspecial
02/14/2025Structural Steel - WeldingZAKI ALBANNAspecial
02/14/2025Structural Cold-Formed SteelZAKI ALBANNAspecial
02/14/2025Subgrade InspectionsZAKI ALBANNAspecial
02/14/2025Construction Operations Influencing Adjacent StructuresZAKI ALBANNAspecial
02/14/2025Structural Steel - High Strength BoltingZAKI ALBANNAspecial
Latest 25 of 53.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/29/2026B00624751-S3Request digital key ↗
08/29/2026B00624751-S2Request digital key ↗
08/29/2026B00624751-S1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit9
08/27/2026B08031416-S1Open ↗
08/27/2026B08031416-I1Open ↗
08/27/2026B08031416-P6Open ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08031416-I1Open ↗
▸Seals & Professional Certifications40
▸DOB NOWSpecial Inspector Seal & Signature17
09/02/2026B08031416-S1Open ↗
09/01/2026B00624751-S3Open ↗
09/01/2026B00624751-S3Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/27/2026B00837611-I1Open ↗
08/27/2026B08031416-S1Open ↗
08/27/2026B08031416-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026B08031416-S1Open ↗
09/01/2026B08031416-I1Open ↗
08/28/2026B00624751-S1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist7
08/27/2026B08031416-P4Open ↗
08/27/2026B08031416-I1Open ↗
08/27/2026B08031416-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026B08031416-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B08031416-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026B08031416-S1Open ↗
08/13/2026B08031416-S3Open ↗
08/13/2026B08031416-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents10
▸DOB NOWProof of Historic Building4
08/27/2026B08031416-I1Open ↗
08/27/2026B08031416-P6Open ↗
08/27/2026B08031416-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/27/2026B08031416-P4Open ↗
08/27/2026B08031416-I1Open ↗
08/27/2026B08031416-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B08031416-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B08031416-S1Open ↗