RoofUnder Construction3p · 1 filing · 9 docs
DM
THE FIRE PROTECTION DRAWINGS REPRESENTS WORK ASSOCIATED WITH FULL DEMOLITION # M01310305-I1 OF AN EXISTING BUILDING. SIGNIFICANT ITEMS RELATING TO THIS SCOPE OF WORK ARE AS FOLLOWS: DEMOLITION OF FIRE SPRINKLER SYSTEMS IN THE BUILDING IN ITS ENTIRETY:
On file for this project
9 documents · 3 drawing sheets
Floor 5Under Construction3p · 2 filings · 19 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers
THE FIRE PROTECTION DRAWINGS REPRESENTS WORK ASSOCIATED WITH FULL DEMOLITION # M01310305-I1 OF AN EXISTING BUILDING. SIGNIFICANT ITEMS RELATING TO THIS SCOPE OF WORK ARE AS FOLLOWS: DEMOLITION OF FIRE SPRINKLER SYSTEMS IN THE BUILDING IN ITS ENTIRETY:
On file for this project
9 documents
INTERIOR NON-STRUCTURAL DEMOLITION OF A 5 STORY WITH BASEMENT AND CELLAR PER PLANS
On file for this project
10 documents · 1 drawing sheet
Floor 4Under Construction4p · 2 filings · 19 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers
THE FIRE PROTECTION DRAWINGS REPRESENTS WORK ASSOCIATED WITH FULL DEMOLITION # M01310305-I1 OF AN EXISTING BUILDING. SIGNIFICANT ITEMS RELATING TO THIS SCOPE OF WORK ARE AS FOLLOWS: DEMOLITION OF FIRE SPRINKLER SYSTEMS IN THE BUILDING IN ITS ENTIRETY:
On file for this project
9 documents
INTERIOR NON-STRUCTURAL DEMOLITION OF A 5 STORY WITH BASEMENT AND CELLAR PER PLANS
On file for this project
10 documents · 2 drawing sheets
Floor 3Under Construction3p · 2 filings · 19 docs
ArchitectureDMFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers
THE FIRE PROTECTION DRAWINGS REPRESENTS WORK ASSOCIATED WITH FULL DEMOLITION # M01310305-I1 OF AN EXISTING BUILDING. SIGNIFICANT ITEMS RELATING TO THIS SCOPE OF WORK ARE AS FOLLOWS: DEMOLITION OF FIRE SPRINKLER SYSTEMS IN THE BUILDING IN ITS ENTIRETY:
On file for this project
9 documents
INTERIOR NON-STRUCTURAL DEMOLITION OF A 5 STORY WITH BASEMENT AND CELLAR PER PLANS
On file for this project
10 documents · 1 drawing sheet
Floor 2Under Construction3p · 2 filings · 19 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers
THE FIRE PROTECTION DRAWINGS REPRESENTS WORK ASSOCIATED WITH FULL DEMOLITION # M01310305-I1 OF AN EXISTING BUILDING. SIGNIFICANT ITEMS RELATING TO THIS SCOPE OF WORK ARE AS FOLLOWS: DEMOLITION OF FIRE SPRINKLER SYSTEMS IN THE BUILDING IN ITS ENTIRETY:
On file for this project
9 documents
INTERIOR NON-STRUCTURAL DEMOLITION OF A 5 STORY WITH BASEMENT AND CELLAR PER PLANS
On file for this project
10 documents · 1 drawing sheet
Floor 1Under Construction3p · 2 filings · 19 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers
THE FIRE PROTECTION DRAWINGS REPRESENTS WORK ASSOCIATED WITH FULL DEMOLITION # M01310305-I1 OF AN EXISTING BUILDING. SIGNIFICANT ITEMS RELATING TO THIS SCOPE OF WORK ARE AS FOLLOWS: DEMOLITION OF FIRE SPRINKLER SYSTEMS IN THE BUILDING IN ITS ENTIRETY:
On file for this project
9 documents
INTERIOR NON-STRUCTURAL DEMOLITION OF A 5 STORY WITH BASEMENT AND CELLAR PER PLANS
On file for this project
10 documents · 1 drawing sheet
CellarUnder Construction2p · 2 filings · 19 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction
THE FIRE PROTECTION DRAWINGS REPRESENTS WORK ASSOCIATED WITH FULL DEMOLITION # M01310305-I1 OF AN EXISTING BUILDING. SIGNIFICANT ITEMS RELATING TO THIS SCOPE OF WORK ARE AS FOLLOWS: DEMOLITION OF FIRE SPRINKLER SYSTEMS IN THE BUILDING IN ITS ENTIRETY:
On file for this project
9 documents · 1 drawing sheet
INTERIOR NON-STRUCTURAL DEMOLITION OF A 5 STORY WITH BASEMENT AND CELLAR PER PLANS
On file for this project
10 documents · 1 drawing sheet
BasementUnder Construction1p · 1 filing · 9 docs
Fire Protection
THE FIRE PROTECTION DRAWINGS REPRESENTS WORK ASSOCIATED WITH FULL DEMOLITION # M01310305-I1 OF AN EXISTING BUILDING. SIGNIFICANT ITEMS RELATING TO THIS SCOPE OF WORK ARE AS FOLLOWS: DEMOLITION OF FIRE SPRINKLER SYSTEMS IN THE BUILDING IN ITS ENTIRETY:
On file for this project
9 documents · 1 drawing sheet
Sub-BasementUnder Construction2p · 2 filings · 19 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers
THE FIRE PROTECTION DRAWINGS REPRESENTS WORK ASSOCIATED WITH FULL DEMOLITION # M01310305-I1 OF AN EXISTING BUILDING. SIGNIFICANT ITEMS RELATING TO THIS SCOPE OF WORK ARE AS FOLLOWS: DEMOLITION OF FIRE SPRINKLER SYSTEMS IN THE BUILDING IN ITS ENTIRETY:
On file for this project
9 documents
INTERIOR NON-STRUCTURAL DEMOLITION OF A 5 STORY WITH BASEMENT AND CELLAR PER PLANS
On file for this project
10 documents