← Back
Walk-up apt, over six families with stores
2041 ADAM C POWELL BLVD
MANHATTAN · BIN 1079482
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
R7-2Zoning
21,340 sfGross Floor Area
27Units
Rent Stabilized7 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: HPH MILANO, LLC · 7,200 sf lot · 2.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2155 MORRIS1507/08/2026
HPH MILANO, LLC303/22/2026
ACP HOUSING ASSOCIATES603/22/2026
CONTRACTOR103/22/2026
ACP HSG ASSOCIATES C O CLINTON M203/21/2026
CLINTON MANAGEMENT303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LIVOLT LLC401/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
2155 MORRIS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & E PLUMBING CORPPlumbing407/08/2026
CLEAN TECH MECHANICAL INCPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LIVOLT LLC7918401/02/2022
Building Lifecycle
All (86)Filed (4)Permit Issued (4)Violation (60)Inspection (4)Special Inspection (14)
07/11/2026
Violation issued (HPD, open)
B
07/11/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, closed)
C
12/16/2025
Violation issued (HPD, closed)
C
12/16/2025
Violation issued (HPD, closed)
C
11/29/2024
Violation issued (HPD, closed)
A
11/29/2024
Violation issued (HPD, closed)
A
11/29/2024
Violation issued (HPD, closed)
C
11/29/2024
Violation issued (HPD, closed)
C
11/27/2024
Violation issued (HPD, closed)
C
11/27/2024
Violation issued (HPD, closed)
C
10/17/2024
Violation issued (HPD, closed)
B
10/17/2024
Violation issued (HPD, closed)
C
10/17/2024
Violation issued (HPD, closed)
C
10/17/2024
Violation issued (HPD, closed)
C
06/24/2024
Violation issued (HPD, closed)
C
04/01/2024
Violation issued (HPD, closed)
A
03/27/2024
Violation issued (HPD, closed)
C
01/30/2024
Violation issued (HPD, closed)
C
01/10/2024
Violation issued (HPD, closed)
C
01/10/2024
Violation issued (HPD, closed)
C
01/02/2024
Violation issued (HPD, closed)
A
01/02/2024
Violation issued (HPD, closed)
B
01/02/2024
Violation issued (HPD, closed)
C
01/02/2024
Violation issued (HPD, closed)
A
01/02/2024
Violation issued (HPD, closed)
C
01/02/2024
Violation issued (HPD, closed)
C
01/02/2024
Violation issued (HPD, closed)
B
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/05/2022
Violation issued (HPD, closed)
C
10/06/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/03/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/28/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/23/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/29/2022
Violation issued (HPD, closed)
C
08/29/2022
Violation issued (HPD, closed)
A
08/29/2022
Violation issued (HPD, closed)
A
08/29/2022
Violation issued (HPD, closed)
B
08/29/2022
Violation issued (HPD, closed)
C
08/29/2022
Violation issued (HPD, closed)
B
02/15/2022
Violation issued (HPD, closed)
C
02/15/2022
Violation issued (HPD, closed)
C
02/15/2022
Violation issued (HPD, closed)
A
02/15/2022
Violation issued (HPD, closed)
C
02/11/2022
Violation issued (HPD, closed)
B
01/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
Nathan Winkler
01/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Nathan Winkler
01/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nathan Winkler
01/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
Nathan Winkler
01/02/2022
Filed — Alteration
Install plumbing for new boilers (3) and water heaters (2) in cellar
M00567558-P1
12/23/2021
Violation issued (HPD, closed)
C
12/23/2021
Violation issued (HPD, closed)
C
12/22/2021
Violation issued (HPD, closed)
C
12/22/2021
Violation issued (HPD, closed)
C
12/15/2021
Violation issued (HPD, closed)
C
12/15/2021
Violation issued (HPD, closed)
C
12/15/2021
Violation issued (HPD, closed)
C
11/17/2021
Permit issued — Plumbing
M00567558-I1-PL
11/17/2021
Permit issued — Boiler Equipment
M00567542-I1-BE
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA & E PLUMBING CORP11/17/2021
DOB NOWBoiler EquipmentSigned-offA & E PLUMBING CORP11/17/2021
DOB NOWPlumbingPermit IssuedA & E PLUMBING CORP08/17/2021
DOB NOWBoiler EquipmentSigned-offA & E PLUMBING CORP08/13/2021
BISPLISSUEDCLEAN TECH MECHANICAL INC03/25/2019
BISMHISSUED180.CONSTRUCTION INC02/25/2019
BISOTISSUED180.CONSTRUCTION INC11/15/2018
BISPLISSUEDS & L PLUMBING INC07/16/2018
BISPLISSUEDS & L PLUMBING INC07/16/2018
BISPLISSUEDS & L PLUMBING INC07/16/2018
BISOTISSUED180.CONSTRUCTION INC06/05/2018
BISOTISSUED180.CONSTRUCTION INC02/05/2018
BISPLISSUEDPRECISION PLBG SVCS., INC01/09/2018
BISOTISSUEDBLUECREST CONSTRUCTION IN12/06/2017
BISOTISSUEDBLUECREST CONSTRUCTION IN09/15/2017
BISPLISSUEDPRECISION PLBG SVCS., INC05/10/2017
BISPLISSUEDPRECISION PLBG SVCS., INC05/10/2017
BISOTISSUEDBLUECREST CONSTRUCTION IN05/01/2017
BISOTISSUEDBLUECREST CONSTRUCTION IN03/17/2017
BIS—ISSUEDNEPTUNE SIGNS&AWNINGS INC07/29/2016
BISPLISSUEDORION PLUMBING & HTG CORP03/01/2016
BISPLISSUEDORION PLUMBING & HTG CORP06/06/2014
BISOTISSUED535 PHASE CONSTR. INC12/06/2013
BISEQISSUEDJERRICK ASSOCIATES INC02/20/2013
BISMHISSUED535 PHASE CONSTR. INC10/18/2012
BISEQISSUEDJERRICK ASSOCIATES INC03/21/2012
BISEQISSUEDJERRICK ASSOCIATES INC06/24/2011
BISPLISSUEDE F G PLUMBING & HEATING08/16/1995
BISMHISSUEDJ.E.LEVINE BULDER08/08/1995
BISEQISSUEDJ.E. LEVINE BUILDER01/24/1995
BISEQISSUEDJ.E. LEVINE BUILDER08/01/1994
1 project · most recent 01/02/2022
Gas Water/Sanitary
FiledStatusContractorScope
01/02/2022Permit IssuedA & E PLUMBING CORPGas, Water/Sanitary
1 project · most recent 03/06/2019
FiledStatusContractorScope
03/06/2019Permit IssuedJOSEPH WEINSTEIN ELECTRIC23 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/03/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/28/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/23/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
01/03/2022HVAC-R and service water heating equipmentNathan Winklerenergy_progress
01/03/2022HVAC-R and service water piping design and insulationNathan Winklerenergy_progress
01/03/2022Fire-Resistant Penetrations and JointsNathan Winklerspecial
01/03/2022HVAC-R and service water heating system controlsNathan Winklerenergy_progress
10/08/2021Fire-Resistant Penetrations and JointsNathan Winklerspecial
10/08/2021HVAC-R and service water heating system controlsNathan Winklerenergy_progress
10/08/2021HVAC-R and service water heating equipmentNathan Winklerenergy_progress
08/15/2021HVAC-R and service water heating system controlsNathan Winklerenergy_progress
08/15/2021HVAC-R and service water heating equipmentNathan Winklerenergy_progress
08/15/2021Fire-Resistant Penetrations and JointsNathan Winklerspecial
08/15/2021Fire-Resistant Penetrations and JointsNathan Winklerspecial
08/15/2021HVAC-R and service water heating equipmentNathan Winklerenergy_progress
08/15/2021HVAC-R and service water heating system controlsNathan Winklerenergy_progress
08/15/2021HVAC-R and service water piping design and insulationNathan Winklerenergy_progress
▾Documents — 184 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026M00567542-I1Request digital key ↗
09/03/2026M00567542-P1Request digital key ↗
09/03/2026M00567558-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits39
▸BISWORK PERMIT APPLICATION28
03/25/2019140817800Open ↗
02/25/2019140817800Open ↗
02/25/2019140817800Open ↗
Showing 3 of 28 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
11/13/2018140817800Open ↗
06/01/2018140771546Open ↗
02/02/2018140736657Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026M00567558-P1Open ↗
09/02/2026M00567558-P1Open ↗
09/02/2026M00567558-P1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
11/13/2018140817800Open ↗
06/01/2018140771546Open ↗
02/02/2018140736657Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
11/13/2018140817800Open ↗
06/01/2018140771546Open ↗
02/02/2018140736657Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
11/13/2018140817800Open ↗
06/01/2018140771546Open ↗
02/02/2018140736657Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
09/22/2016122841489Open ↗
08/04/2016122841489Open ↗
04/01/2016121352730Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026M00567558-P1Open ↗
08/23/2026M00567542-I1Open ↗
08/23/2026M00567542-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/03/2026M00567542-I1Open ↗
09/03/2026M00567542-P1Open ↗
08/13/2026M00567558-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/04/2016122841489Open ↗
06/24/2011120734955Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/24/2011120734955Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING8
11/13/2018140817800Open ↗
06/01/2018140771546Open ↗
02/02/2018140736657Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/09/2014121352730Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
10/23/2014121352730Open ↗
▸Safety & Tenant Protection7
▸BISTENANT PROTECTION PLAN AND NOTES7
11/13/2018140817800Open ↗
06/01/2018140771546Open ↗
02/02/2018140736657Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos14
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
11/13/2018140817800Open ↗
06/01/2018140771546Open ↗
02/02/2018140736657Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/03/2026M00567542-P1Open ↗
09/03/2026M00567542-I1Open ↗
09/03/2026M00567558-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/24/2011120734955Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS7
11/13/2018140817800Open ↗
06/01/2018140771546Open ↗
02/02/2018140736657Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
11/13/2018140817800Open ↗
06/01/2018140771546Open ↗
02/02/2018140736657Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/01/2016121352730Open ↗
04/01/2016121352730Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00567558-I1Open ↗
08/13/2026M00567542-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/01/2016121352730Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY7
11/13/2018140817800Open ↗
06/01/2018140771546Open ↗
02/02/2018140736657Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/22/2016122841489Open ↗
04/01/2016121352730Open ↗
04/22/2014120734955Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
08/24/2012121352730Open ↗
06/24/2011120734955Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/22/2013120734955Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT11
11/13/2018140817800Open ↗
06/01/2018140771546Open ↗
02/02/2018140736657Open ↗
Showing 3 of 11 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT7
11/13/2018140817800Open ↗
06/01/2018140771546Open ↗
02/02/2018140736657Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms10
▸BISEFILING JOB APPLICATION COVER SHEET7
11/13/2018140817800Open ↗
06/01/2018140771546Open ↗
02/02/2018140736657Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET3
08/04/2016122841489Open ↗
08/24/2012121352730Open ↗
06/24/2011120734955Open ↗
▸Other Documents2
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
03/28/2012120734955Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/08/2011120734955Open ↗