← Back
Elevator apt, semi-fireproof without stores
2044 EAST 13 STREET
BROOKLYN · Gravesend (East)-Homecrest · BIN 3197974
💬 Discuss this project
1934Year Built
6Stories
D1Building Class
R5Zoning
46,800 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized9 Open Violations 8 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: PARLANTI GROUP LLC · 13,000 sf lot · 3.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalGeneral
Roof3p · 2 filings · 6 docs
Floor 51 filing · 7 docs
Floor 41p · 1 filing · 7 docs
Floor 33p · 2 filings · 20 docs
Floor 2
Floor 11p · 1 filing · 7 docs
Cellar1p · 1 filing · 3 docs
Sub-Basement1 filing · 3 docs
Site & exterior1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TERENZIO REALTY1407/08/2026
CELL TOWER LEASE ACQUISTION503/21/2026
PARLANTI403/21/2026
T-MOBILE307/08/2026
PARLANTI GROUP LLC303/22/2026
B H B CONSTRUCTION303/21/2026
DISH WIRELESS103/22/2026
ELIAS MALLOUK REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NAZZARENO CALLIPO P.E.408/08/2025
KMB DESIGN GROUP, LLC109/11/2023
MICHAEL L. PINSKE105/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES103/21/2026
GZ NC CODE PLANNING ENGINEERING403/21/2026
BILTMORE GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SYCAMORE REALTY GROUP LLCGeneral Contractor507/08/2026
CONTI, EElectrical203/21/2026
DEPT OF CORRECTIONElectrical203/21/2026
C & C IRON WORKSElectrical203/21/2026
ASSOCIATED ELEC CONT OF NElectrical103/22/2026
TRISTRUX LLCGeneral Contractor107/08/2026
MICHAEL BAPTISTEElectrical103/21/2026
RIDGE ELECTRIC CORP.Electrical103/22/2026
GOTHAM COMMUNICATIONS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GZ & NC CODE CONSULTING P7492408/08/2025
KMB DESIGN GROUP, LLC513109/11/2023
ELEVATED ENGINEERING PLLC3692105/25/2022
Building Lifecycle
All (106)Filed (6)Permit Issued (5)Signed Off (5)Violation (60)Objection (18)Special Inspection (12)
04/03/2026
Violation issued (HPD, closed)
C
04/03/2026
Violation issued (HPD, closed)
B
04/03/2026
Violation issued (HPD, closed)
A
04/03/2026
Violation issued (HPD, closed)
B
01/09/2026
Violation issued (HPD, open)
B
01/09/2026
Violation issued (HPD, closed)
C
01/09/2026
Violation issued (HPD, closed)
C
01/09/2026
Violation issued (HPD, open)
B
01/09/2026
Violation issued (HPD, closed)
C
01/09/2026
Violation issued (HPD, closed)
B
01/09/2026
Violation issued (HPD, closed)
B
01/09/2026
Violation issued (HPD, closed)
C
01/09/2026
Violation issued (HPD, open)
B
08/13/2025
Signed off — Alteration
Miscellaneous Renovations in apt3f, third floor. Work to include nonstructural demolition, refurbish floors and ceilings, new kitchen and bathroom. No change in use, egress nor occupancy.
B01229049-I1
08/12/2025
Special inspection requirement — Lighting in dwelling units
Nazzareno Callipo
08/12/2025
Special inspection requirement — Final
Nazzareno Callipo
08/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nazzareno Callipo
08/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
Nazzareno Callipo
08/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nazzareno Callipo
08/12/2025
Special inspection requirement — Insulation placement and R values
Nazzareno Callipo
08/08/2025
Filed — Alteration
Miscellaneous Renovations in apt3f, third floor. Work to include nonstructural demolition, refurbish floors and ceilings, new kitchen and bathroom. No change in use, egress nor occupancy.
B01229049-P1
08/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/04/2025
Special inspection requirement — Lighting in dwelling units
Nazzareno Callipo
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nazzareno Callipo
08/04/2025
Special inspection requirement — Final
Nazzareno Callipo
08/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nazzareno Callipo
08/04/2025
Special inspection requirement — Insulation placement and R values
Nazzareno Callipo
06/12/2025
Permit issued — General Construction
B01229049-I1-GC
05/28/2025
Filed — Alteration
Miscellaneous Renovations in apt3f, third floor. Work to include nonstructural demolition, refurbish floors and ceilings, new kitchen and bathroom. No change in use, egress nor occupancy.
B01229049-I1
10/08/2024
Violation issued (HPD, closed)
B
10/08/2024
Violation issued (HPD, closed)
C
01/25/2024
Signed off — Alteration
DECOMMISSION OF EXISTING SPRINT/CW TELECOM SITE. REMOVE EQUIPMENT PLATFROM AND DUNNAGE, 9 ANTENNAS, 9 RRH 2 GPS FROM ROOF. REMOVE CABLES FROM CELLAR, FACADE AND ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ORIGINAL APP # 300869479
B00928923-I1
11/05/2023
Violation issued (HPD, closed)
B
10/31/2023
Permit issued — Antenna
B00928923-I1-AN
10/17/2023
Objection resolved — Addressed
10/17/2023
Objection resolved — Addressed
09/19/2023
Objection raised — Scope
09/19/2023
Objection raised — Inspections
09/11/2023
Filed — Alteration
DECOMMISSION OF EXISTING SPRINT/CW TELECOM SITE. REMOVE EQUIPMENT PLATFROM AND DUNNAGE, 9 ANTENNAS, 9 RRH 2 GPS FROM ROOF. REMOVE CABLES FROM CELLAR, FACADE AND ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ORIGINAL APP # 300869479
B00928923-I1
02/13/2023
Signed off — Alteration
New antenna installation. Install exterior cabinets on new platform. Related (3) new sectors of antenna on roof (1 ant, 2 RRU's & 1 OVP) per sector & 1 GPS. . All work is in conformance with TPPN#5/98. No change in use, egress, or occupancy. Carrier DISH
B00730123-I1
01/30/2023
Signed off — Alteration
MISC. RENOVATIONS IN APTS 1H, 3E, AND 4B. WORK TO INCLUDE NON STRUCTURAL DEMOLITION, NEW KITCHEN AND BATHROOM FINISHES. PLUBMING TO BE FILED SEPARATELLY. NO CHANGE IN USE EGRESS NOR OCCUPANCY
B00738192-I1
01/17/2023
Signed off — Alteration
MISC. RENOVATIONS IN APTS 1H, 3E, AND 4B. WORK TO INCLUDE NON STRUCTURAL DEMOLITION, NEW KITCHEN AND BATHROOM FINISHES. PLUBMING TO BE FILED SEPARATELLY. NO CHANGE IN USE EGRESS NOR OCCUPANCY
B00738192-S1
01/07/2023
Violation issued (HPD, closed)
A
01/07/2023
Violation issued (HPD, closed)
C
01/07/2023
Violation issued (HPD, closed)
B
01/07/2023
Violation issued (HPD, closed)
A
01/07/2023
Violation issued (HPD, closed)
B
01/07/2023
Violation issued (HPD, closed)
B
12/01/2022
Permit issued — Structural
B00738192-S1-ST
11/21/2022
Filed — Alteration
MISC. RENOVATIONS IN APTS 1H, 3E, AND 4B. WORK TO INCLUDE NON STRUCTURAL DEMOLITION, NEW KITCHEN AND BATHROOM FINISHES. PLUBMING TO BE FILED SEPARATELLY. NO CHANGE IN USE EGRESS NOR OCCUPANCY
B00738192-S1
09/09/2022
Permit issued — General Construction
B00738192-I1-GC
09/09/2022
Violation issued (HPD, closed)
B
09/09/2022
Violation issued (HPD, closed)
B
09/09/2022
Violation issued (HPD, closed)
B
09/09/2022
Violation issued (HPD, closed)
C
09/09/2022
Violation issued (HPD, closed)
C
09/09/2022
Violation issued (HPD, closed)
B
09/09/2022
Violation issued (HPD, closed)
B
09/09/2022
Violation issued (HPD, closed)
B
06/29/2022
Permit issued — Antenna
B00730123-I1-AN
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSYCAMORE REALTY GROUP LLC06/12/2025
DOB NOWAntennaSigned-offTRISTRUX LLC10/31/2023
DOB NOWStructuralSigned-offSYCAMORE REALTY GROUP LLC12/01/2022
DOB NOWGeneral ConstructionSigned-offSYCAMORE REALTY GROUP LLC09/09/2022
DOB NOWAntennaSigned-offGOTHAM COMMUNICATIONS LLC06/29/2022
BISOTISSUEDLEONE CONSTRUCTION, INC09/08/2017
BISOTISSUEDLEONE CONSTRUCTION, INC10/22/2015
BISOTISSUEDAP GENERAL CONTRACTING LL10/08/2014
BISEQISSUEDB H & B CONSTRUCTION INC08/28/2014
BISOTISSUEDAP GENERAL CONTRACTING LL07/11/2014
BISOTISSUEDVERTICAL SOLUTIONS INC07/30/2013
BISOTISSUEDTRANSCEND WIRELESS LLC03/26/2010
BISOTISSUEDODYSSIA_GEN CONTR. INC07/26/1999
BISPLISSUEDJOSEPH FERRIGNO PLUMBING & HEATI05/06/1998
BISFSISSUEDSTAR INDUSTRIAL SERVICE CO INC05/06/1998
5 projects · most recent 06/17/2025
General Wiring
FiledStatusContractorScope
06/17/2025CompleteRIDGE ELECTRIC CORP.General Wiring
10/06/2022Permit IssuedRIDGE ELECTRIC CORP.General Wiring
10/06/2022Permit IssuedRIDGE ELECTRIC CORP.General Wiring
10/05/2022CompleteRIDGE ELECTRIC CORP.General Wiring
09/09/2022Permit IssuedASSOCIATED ELEC CONT OF NGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
08/12/2025Lighting in dwelling unitsNazzareno Callipoenergy_progress
08/12/2025FinalNazzareno Callipoprogress
08/12/2025Fire-Resistance Rated ConstructionNazzareno Callipoprogress
08/12/2025Tenant Protection Plan ComplianceNazzareno Callipospecial
08/12/2025Fire-Resistant Penetrations and JointsNazzareno Callipospecial
08/12/2025Insulation placement and R valuesNazzareno Callipoenergy_progress
08/08/2025Tenant Protection Plan Compliance—special
08/04/2025Lighting in dwelling unitsNazzareno Callipoenergy_progress
08/04/2025Fire-Resistant Penetrations and JointsNazzareno Callipospecial
08/04/2025FinalNazzareno Callipoprogress
08/04/2025Fire-Resistance Rated ConstructionNazzareno Callipoprogress
08/04/2025Insulation placement and R valuesNazzareno Callipoenergy_progress
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/29/2026B00738192-I1Request digital key ↗
08/29/2026B00738192-S1Request digital key ↗
08/21/2026B01229049-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits21
▸BISPLAN / WORK APPROVAL APPLICATION11
10/07/2020321252997Open ↗
04/28/2020321252997Open ↗
03/20/2020321252997Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION8
10/24/2018340642237Open ↗
09/15/2017321252997Open ↗
10/23/2015321252997Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
12/13/2017321202907Open ↗
11/15/2017321202907Open ↗
▸Seals & Professional Certifications30
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
10/08/2015321252997Open ↗
07/22/2014320785771Open ↗
07/22/2013320785771Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/29/2026B00738192-I1Open ↗
08/29/2026B00738192-S1Open ↗
08/21/2026B01229049-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026B01229049-I1Open ↗
09/23/2026B01229049-I1Open ↗
08/25/2026B01229049-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026B01229049-I1Open ↗
09/23/2026B01229049-I1Open ↗
08/25/2026B01229049-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/24/2018340642237Open ↗
08/27/2014340180574Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/24/2018340642237Open ↗
08/27/2014340180574Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/24/2018340642237Open ↗
08/27/2014340180574Open ↗
▸BISProfessional and Owner Certification (POC3)1
07/24/2014321202907Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/24/2014321202907Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
11/24/2015321252997Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
11/17/2017321202907Open ↗
10/24/2018340642237Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/29/2026B00738192-I1Open ↗
08/29/2026B00738192-S1Open ↗
08/21/2026B01229049-P1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/08/2015321252997Open ↗
07/22/2013320785771Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/18/2010320136875Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
07/24/2014321202907Open ↗
▸Energy Compliance13
▸BISAS-BUILT ENERGY ANALYSIS5
02/02/2021321252997Open ↗
01/06/2021321252997Open ↗
10/07/2020340642237Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
10/08/2015321252997Open ↗
07/22/2014320785771Open ↗
07/22/2013320785771Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/07/2020340642237Open ↗
10/24/2018340642237Open ↗
▸BISTR8: Energy Code Progress Inspections1
07/24/2014321202907Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/24/2018340642237Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/29/2026B00738192-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
02/02/2021321252997Open ↗
01/06/2021321252997Open ↗
10/07/2020321252997Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
02/02/2021321252997Open ↗
01/06/2021321252997Open ↗
10/07/2020340642237Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
07/22/2013320785771Open ↗
03/18/2010320136875Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
02/02/2021321252997Open ↗
01/06/2021321252997Open ↗
10/07/2020340642237Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION3
10/30/2020321252997Open ↗
10/20/2020321252997Open ↗
09/26/2014340180574Open ↗
▸BISEFILING COVER SHEET3
10/08/2015321252997Open ↗
07/24/2014321202907Open ↗
07/24/2013320785771Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
10/24/2018340642237Open ↗
08/27/2014340180574Open ↗