Locations of Work
Plumbing
Floor 27p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Site & exterior7p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/31/2017$700K—Private party → DAZAR ENTERPRISE II, LLC$257/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KEMS ENGINEERING AND CONSTRUCTION311/29/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEWSAN CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G. & S. PLUMBING & HTG COPlumbing407/08/2026
ISLAND ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY V. PEROTTO, P.E.947311/29/2022
Building Lifecycle
All (28)Filed (3)Permit Issued (1)Signed Off (1)Violation (5)Inspection (4)Special Inspection (14)
11/24/2025
Violation issued (HPD, open)
I
12/03/2024
Violation issued (HPD, open)
I
11/28/2023
Violation issued (HPD, open)
I
05/09/2023
Signed off — Alteration
Registering one (1) existing boiler, installing one (1) new boiler, two (2) new hwhs, two (2) new washing machines, two (2) new gas dryers. Relocate one (1) gas meter and install one (1) new meter
X00570671-I1
11/29/2022
Filed — Alteration
Registering one (1) existing boiler, installing one (1) new boiler, two (2) new hwhs, two (2) new washing machines, two (2) new gas dryers. Relocate one (1) gas meter and install one (1) new meter
X00570671-P2
11/17/2022
Violation issued (HPD, open)
I
10/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
10/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
10/26/2022
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
10/26/2022
Special inspection requirement — Maintenance information
Steven Bendoraitis
10/26/2022
Special inspection requirement — Permanent certificate
Steven Bendoraitis
10/26/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
10/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
04/14/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/25/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/21/2021
Filed — Alteration
Registering one (1) existing boiler, installing one (1) new boiler, two (2) new hwhs, two (2) new washing machines, two (2) new gas dryers. Relocate one (1) gas meter and install one (1) new meter
X00570671-P1
09/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
09/21/2021
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
09/21/2021
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
09/21/2021
Special inspection requirement — Maintenance information
Steven Bendoraitis
09/21/2021
Special inspection requirement — Permanent certificate
Steven Bendoraitis
09/21/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
09/21/2021
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
09/17/2021
Permit issued — Plumbing
X00570671-I1-PL
08/18/2021
Filed — Alteration
Registering one (1) existing boiler, installing one (1) new boiler, two (2) new hwhs, two (2) new washing machines, two (2) new gas dryers. Relocate one (1) gas meter and install one (1) new meter
X00570671-I1
04/21/2021
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offG. & S. PLUMBING & HTG CO09/17/2021
BISOTISSUEDPRO CUSTOM SOLAR LLC12/05/2017
1 project · most recent 02/01/2018
FiledStatusContractorScope
02/01/2018CompleteISLAND ELECTRIC CORP1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/14/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
10/26/2022HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
10/26/2022Fire-Resistant Penetrations and JointsGregory Perottospecial
10/26/2022Energy Code Compliance InspectionsSteven Bendoraitisprogress
10/26/2022Maintenance informationSteven Bendoraitisenergy_progress
10/26/2022Permanent certificateSteven Bendoraitisenergy_progress
10/26/2022HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
10/26/2022HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
09/21/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
09/21/2021Energy Code Compliance InspectionsSteven Bendoraitisprogress
09/21/2021HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
09/21/2021Maintenance informationSteven Bendoraitisenergy_progress
09/21/2021Permanent certificateSteven Bendoraitisenergy_progress
09/21/2021HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
09/21/2021HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026X00570671-I1Request digital key ↗
08/25/2026X00570671-P2Request digital key ↗
08/25/2026X00570671-P1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/01/2017240207860Open ↗
▸BISWORK PERMIT APPLICATION1
12/01/2017240207860Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature12
08/30/2026X00570671-P2Open ↗
08/30/2026X00570671-P2Open ↗
08/30/2026X00570671-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026X00570671-I1Open ↗
08/25/2026X00570671-P1Open ↗
08/13/2026X00570671-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026X00570671-P2Open ↗
08/23/2026X00570671-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/01/2017240207860Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/01/2017240207860Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/01/2017240207860Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
12/01/2017240207860Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026X00570671-I1Open ↗
08/25/2026X00570671-P1Open ↗
08/13/2026X00570671-P2Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/01/2017240207860Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/11/2018240207860Open ↗
05/17/2018240207860Open ↗
12/01/2017240207860Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/17/2018240207860Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
12/01/2017240207860Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
10/05/2018240207860Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/01/2017240207860Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00570671-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/11/2018240207860Open ↗
05/17/2018240207860Open ↗
12/01/2017240207860Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/05/2018240207860Open ↗
05/17/2018240207860Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter2
10/05/2018240207860Open ↗
05/17/2018240207860Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/05/2018240207860Open ↗
12/01/2017240207860Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/01/2017240207860Open ↗