Elevator apt, semi-fireproof without stores
2047 RYER AVE
BRONX · BIN 2131077
💬 Discuss this project
2024Year Built
—Stories
D1Building Class
R8Zoning
94,044 sfGross Floor Area
131Units
Rent Stabilized80 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: GW RYER LLC · 14,231 sf lot · 6.61 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionCivil
Roof8p · 6 filings · 20 docs
Bulkhead4p · 3 filings · 20 docs
Floor 184p · 2 filings · 9 docs
Floor 172p · 2 filings · 9 docs
Floor 16
Floor 151p · 1 filing · 5 docs
Floor 141p · 1 filing · 5 docs
Floor 131p · 1 filing · 5 docs
Floor 126p · 4 filings · 20 docs
Floor 117p · 4 filings · 20 docs
Floor 107p · 4 filings · 20 docs
Floor 97p · 4 filings · 20 docs
Floor 84p · 2 filings · 20 docs
Floor 74p · 2 filings · 20 docs
Floor 64p · 2 filings · 20 docs
Floor 54p · 2 filings · 20 docs
Floor 44p · 2 filings · 20 docs
Floor 36p · 4 filings · 20 docs
Floor 27p · 4 filings · 20 docs
Floor 16p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLUE SHINE BUILDERS INC DBA BLUE SK4007/08/2026
SPAXEL607/08/2026
OWNER'S REP2303/22/2026
GW RYER LLC103/22/2026
PROPCO603/21/2026
UA BUILDERS203/21/2026
BLUE SHINE BUILDERS803/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/24/2023$5.7M—2047 RYER AVENUE LLC → GW RYER LLC— not available
07/26/2018$3.0M—Private party → 2047 RYER AVENUE LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC4403/21/2026
MUNICIPAL BUILDING CONSULTANTS703/21/2026
THE GREEN STUDIO703/21/2026
KC EXPEDITING INC103/21/2026
MILLENNIUM DESIGNS703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUE SHINE BUILDERS INCGeneral Contractor2207/08/2026
GWT ENTERPRISES INCGeneral Contractor1203/21/2026
UA BUILDERS CORPGeneral Contractor507/08/2026
TRISTATE FIRE SPRINK INCFire Protection307/08/2026
GREEN STAR ELECTL CONT INElectrical103/22/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
SOLAS ELECTRICAL CORPElectrical103/22/2026
KAO HWA LEE ARCHITECTSGeneral Contractor103/22/2026
SPAXEL BUILDERS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161606/15/2025
Building Lifecycle
All (218)Filed (38)Permit Issued (21)Signed Off (15)Violation (21)Inspection (14)Objection (79)Special Inspection (30)
04/02/2026
Violation issued (ECB, open)
Elevators
08/06/2025
Signed off — Alteration
THE SCOPE OF WORK IS DUCT REWORK OF EXISTING 13 STORY RESIDENTIALUSE BUILDING IN CONJUNCTION WITH BIS JOB NUMBER 220727462
X01241380-I1
08/04/2025
Permit issued — Mechanical Systems
X01241380-I1-MS
07/29/2025
Filed — Alteration
THE SCOPE OF WORK IS DUCT REWORK OF EXISTING 13 STORY RESIDENTIALUSE BUILDING IN CONJUNCTION WITH BIS JOB NUMBER 220727462
X01241380-P1
07/28/2025
Special inspection requirement — Final
07/28/2025
Special inspection requirement — Mechanical Systems
06/17/2025
Violation issued (ECB, closed)
Construction
06/15/2025
Filed — Alteration
THE SCOPE OF WORK IS DUCT REWORK OF EXISTING 13 STORY RESIDENTIALUSE BUILDING IN CONJUNCTION WITH BIS JOB NUMBER 220727462
X01241380-I1
06/11/2025
Signed off — Alteration
SPRINKLER AND STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH BIS NB APPLICATION #220727462
X00977425-S4
06/11/2025
Signed off — Alteration
SPRINKLER AND STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH BIS NB APPLICATION #220727462
X00977425-S2
06/09/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
06/09/2025
Special inspection requirement — Standpipe Systems
FAHAD FATEH
06/09/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
06/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/27/2025
Filed — Alteration
SPRINKLER AND STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH BIS NB APPLICATION #220727462
X00977425-P7
05/23/2025
Signed off — Alteration
SPRINKLER AND STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH BIS NB APPLICATION #220727462
X00977425-S3
05/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/23/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
05/23/2025
Special inspection requirement — Standpipe Systems
FAHAD FATEH
05/23/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
05/13/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/26/2025
Signed off — Alteration
SPRINKLER AND STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH BIS NB APPLICATION #220727462
X00977425-I1
03/19/2025
Signed off — Alteration
(Please assign job to dev HUB, as the underlying NB application is a hub job) MECHANICAL SPECIFICATION FILED IN CONJUNCTION WITH BIS NB APPLICATION #220727462
X00998351-I1
03/13/2025
Signed off — Alteration
SPRINKLER AND STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH BIS NB APPLICATION #220727462
X00977425-S7
03/12/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
03/12/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/12/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
03/12/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
03/11/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/10/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/10/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/07/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/05/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NEEDLE BEAM SHALL COMPLY WITH THE CHAPTER #33 OF THE CODE. NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01034614-I1
03/05/2025
Signed off — Alteration
INSTALLATION OF A SINGLE PERSONNEL/MATERIAL HOISTS. CAR#1 SHALL BE 6000# CAPACITY DURING NEW BUILDING CONST FILED SEP. HOISTS SHALL COMPLY WITH THE 2022 BLDG CODES, CH #33. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP ELEV APPL FILED SEP
X01034623-I1
03/04/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, OVERHEAD PROTECTION, PIPE SCAFFOLDING, SYSTEM BEAM, AND NEEDLE BEAM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01034609-I1
02/26/2025
Signed off — Alteration
SPRINKLER AND STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH BIS NB APPLICATION #220727462
X00977425-S5
02/12/2025
Violation issued (ECB, closed)
Plumbing
02/12/2025
Violation issued (ECB, closed)
Construction
02/12/2025
Violation issued (ECB, closed)
Unknown
02/12/2025
Violation issued (ECB, closed)
Unknown
02/12/2025
Violation issued (ECB, closed)
Construction
02/04/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
02/04/2025
Special inspection requirement — Final
FAHAD FATEH
02/04/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
02/04/2025
Special inspection requirement — Shutoff dampers
FAHAD FATEH
02/04/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
02/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
02/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
02/04/2025
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
02/04/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
02/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/29/2025
Signed off — Alteration
SPRINKLER AND STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH BIS NB APPLICATION #220727462
X00977425-S8
01/22/2025
Filed — Alteration
(Please assign job to dev HUB, as the underlying NB application is a hub job) MECHANICAL SPECIFICATION FILED IN CONJUNCTION WITH BIS NB APPLICATION #220727462
X00998351-P1
01/21/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
01/21/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
01/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
01/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/21/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
Latest 60 of 218 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBLUE SHINE BUILDERS INC08/04/2025
DOB NOWCurb CutSigned-offBLUE SHINE BUILDERS INC10/30/2024
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC09/18/2024
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC09/18/2024
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC09/17/2024
DOB NOWProtection and Mechanical MethodsSigned-offGWT ENTERPRISES INC09/06/2024
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC07/26/2024
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC07/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offGWT ENTERPRISES INC07/22/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN07/05/2024
DOB NOWSupport of ExcavationSigned-offBLUE SHINE BUILDERS INC04/12/2024
DOB NOWSupport of ExcavationSigned-offBLUE SHINE BUILDERS INC03/18/2024
DOB NOWMechanical SystemsSigned-offBLUE SHINE BUILDERS INC03/15/2024
DOB NOWSupport of ExcavationSigned-offBLUE SHINE BUILDERS INC03/04/2024
DOB NOWEarth WorkSigned-offBLUE SHINE BUILDERS INC02/29/2024
DOB NOWStructuralSigned-offBLUE SHINE BUILDERS INC02/29/2024
DOB NOWConstruction FenceSigned-offBLUE SHINE BUILDERS INC01/18/2024
DOB NOWConstruction FenceSigned-offUA BUILDERS CORP01/04/2023
DOB NOWGeneral ConstructionSigned-offSPAXEL BUILDERS LLC12/21/2022
DOB NOWConstruction FenceSigned-offUA BUILDERS CORP12/30/2021
DOB NOWConstruction FenceSigned-offUA BUILDERS CORP04/05/2019
BIS—ISSUEDBLUE SHINE BUILDERS INC04/18/2024
BIS—ISSUEDBLUE SHINE BUILDERS INC04/18/2024
BIS—ISSUEDBLUE SHINE BUILDERS INC03/14/2024
BIS—ISSUEDBLUE SHINE BUILDERS INC03/14/2024
BIS—ISSUEDSPAXEL BUILDERS LLC06/03/2022
2 projects · most recent 05/27/2025
Heating and Air Conditioning Systems Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/27/2025Signed-offBLUE SHINE BUILDERS INCHeating and Air Conditioning Systems
Heat / Cool
Amana PTH073G35 7,600 BTU · Ptac ×135
PTH123G35 12,000 BTU · Ptac ×101
PTH093G35 9,000 BTU · Ptac ×40
PTH153G35 14,700 BTU · Ptac ×30
04/27/2022——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Smartflex DHP24NWB21S/DHP24CSB21S 23,000 BTU · Split System ×1
Heating
Lochinvar FTX725 725,000 BTU · Boiler ×3
Ventilation
Aaon RN-016-8-0-EB09 185,940 BTU · Condensing Unit ×1
2 projects · most recent 05/27/2025
FiledStatusContractorScope
05/27/2025Signed-offTRISTATE FIRE SPRINK INC1,078 heads, 3 outlets
12/07/2020——767 heads, 1 outlets
2 projects · most recent 05/27/2025
Gas Water/Sanitary Storm
FiledStatusContractorScope
05/27/2025Signed-offPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
12/07/2020——Gas, Water/Sanitary
6 projects · most recent 04/10/2025
General Wiring
FiledStatusContractorScope
04/10/2025CompleteINTELOGIC ELECTRIC, INC.General Wiring
04/06/2025CompleteGREEN STAR ELECTL CONT IN—
04/03/2025CompleteGREEN STAR ELECTL CONT INGeneral Wiring
05/22/2024CompleteHIVOLTS ELECTRICAL INC1 meters, 1 new_meters
05/02/2024CompleteSOLAS ELECTRICAL CORP—
04/22/2024CompleteSOLAS ELECTRICAL CORP—
2 projects · most recent 05/27/2025
Concrete Masonry Steel
FiledStatusContractorScope
05/27/2025Signed-offBLUE SHINE BUILDERS INCConcrete, Masonry
01/31/2024——Steel, Concrete, Masonry
1 project · most recent 05/27/2025
Fence
FiledStatusContractorScope
05/27/2025Signed-offBLUE SHINE BUILDERS INCFence
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
05/13/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/12/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
03/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/12/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
03/12/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/11/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
03/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/10/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/07/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
11/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/01/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/27/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/06/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 105
DateRequirementInspectorRole
07/28/2025Final—progress
07/28/2025Mechanical Systems—special
06/09/2025Post-installed AnchorsFAHAD FATEHspecial
06/09/2025Standpipe SystemsFAHAD FATEHspecial
06/09/2025Sprinkler SystemsFAHAD FATEHspecial
06/09/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/23/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/23/2025Standpipe SystemsFAHAD FATEHspecial
05/23/2025Sprinkler SystemsFAHAD FATEHspecial
05/23/2025Post-installed AnchorsFAHAD FATEHspecial
02/04/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
02/04/2025Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
02/04/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
02/04/2025FinalFAHAD FATEHprogress
02/04/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
02/04/2025Mechanical SystemsFAHAD FATEHspecial
02/04/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/04/2025Post-installed AnchorsFAHAD FATEHspecial
02/04/2025Shutoff dampersFAHAD FATEHenergy_progress
02/04/2025Maintenance informationFAHAD FATEHenergy_progress
02/04/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
01/21/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
01/21/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/21/2025Mechanical SystemsFAHAD FATEHspecial
01/21/2025Post-installed AnchorsFAHAD FATEHspecial
Latest 25 of 105.
▾Documents — 322 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch29
08/23/2026X08048065-P2Request digital key ↗
08/23/2026X08048065-P1Request digital key ↗
08/21/2026X00998351-P1Request digital key ↗
Showing 3 of 29 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/26/2026X00351474-I1Request digital key ↗
08/15/2026X00410602-I1Request digital key ↗
08/14/2026X00410602-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/25/2026X00409723-P1Request digital key ↗
08/15/2026X00409723-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/14/2026X00139513-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
08/25/2026X00426379-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/25/2026X00426379-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/25/2026X00426379-I1Request digital key ↗
▸Applications & Permits42
▸BISPLAN / WORK APPROVAL APPLICATION33
07/10/2025220727462Open ↗
06/13/2025220727462Open ↗
03/07/2025220727462Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION8
04/26/2024220727462Open ↗
04/26/2024220727462Open ↗
04/26/2024220727462Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/31/2024220727462Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT I: CERTIFICATION1
05/07/2020220727462Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/07/2020220727462Open ↗
▸BISVERIFY TAX LOT1
11/04/2024220727462Open ↗
▸Seals & Professional Certifications72
▸DOB NOWDPL-1: Design Professional Seal & Signature36
08/26/2026X00139513-I1Open ↗
08/26/2026X00351474-I1Open ↗
08/25/2026X00410602-P1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/10/2026X00977425-S9Open ↗
09/10/2026X00977425-S9Open ↗
09/01/2026X00977425-S7Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026X08048065-P2Open ↗
09/01/2026X00977425-S7Open ↗
09/01/2026X00977425-S8Open ↗
Showing 3 of 15 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/19/2023240358812Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/09/2022220727462Open ↗
▸Trade Schedules & Equipment12
▸BISSTANDPIPE SYSTEMS2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISHEATING SYSTEMS2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISSPRINKLER SYSTEMS2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISSTANDPIPE ALARM DRAWINGS & AI1 (OR AI1 PROOF)1
05/20/2022220727462Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
07/14/2020220727462Open ↗
▸Safety & Tenant Protection4
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISSTREET TREE CHECKLIST2
03/23/2021220727462Open ↗
02/02/2021220727462Open ↗
▸Energy Compliance34
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
03/15/2024220727462Open ↗
05/17/2022220727462Open ↗
02/02/2021220727462Open ↗
Showing 3 of 5 on file for this type
▸BISELECTRICAL ENERGY CONSUMPTION2
03/19/2025220727462Open ↗
03/19/2025220727462Open ↗
▸BISEXTERIOR LIGHTING POWER2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISFENESTRATION AIR LEAKAGE2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISINTERIOR LIGHTING POWER2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISFENESTRATION AREAS2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISINSULATION PLACEMENT & R VALUES2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISLIGHTING IN DWELLING UNITS2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISELECTRIC MOTORS2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISLIGHTING CONTROLS2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BIS* HVAC INSULATION AND SEALING2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00977425-I1Open ↗
08/13/2026X00998351-I1Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
08/08/2025220727462Open ↗
▸Inspections & Test Reports40
▸BISTECHNICAL REPORT: RESPONSIBILITY10
03/15/2024220727462Open ↗
05/27/2022220727462Open ↗
05/17/2022220727462Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
08/08/2025220727462Open ↗
06/09/2022220727462Open ↗
05/27/2022220727462Open ↗
▸DOB NOWSOIL REPORT3
08/13/2026X00977425-P3Open ↗
08/13/2026X00977425-S9Open ↗
08/13/2026X00977425-P2Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
02/02/2021220727462Open ↗
07/20/2020220727462Open ↗
▸BISMECHANICAL SYSTEMS2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
06/09/2022220727462Open ↗
05/20/2022220727462Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
11/01/2024220727462Open ↗
06/02/2022220727462Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISMASONRY2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00977425-S9Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026X00977425-S8Open ↗
▸Approvals, Objections & Sign-offs23
▸BISSCHEDULE A - OCCUPANCY / USE15
11/30/2023220727462Open ↗
11/01/2023220727462Open ↗
10/30/2023220727462Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/19/2024220727462Open ↗
03/18/2024220727462Open ↗
03/18/2024220727462Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER4
04/26/2024220727462Open ↗
04/26/2024220727462Open ↗
04/26/2024220727462Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership6
▸BISPROJECT-SPECIFIC GL INSURANCE4
03/19/2024220727462Open ↗
03/18/2024220727462Open ↗
06/09/2022220727462Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
03/19/2024220727462Open ↗
▸BISATTENDANT PARKING AFFIDAVIT1
07/02/2020220727462Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION11
08/08/2025220727462Open ↗
08/08/2025220727462Open ↗
07/14/2025220727462Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM4
04/26/2024220727462Open ↗
04/26/2024220727462Open ↗
06/09/2022220727462Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
10/19/2020220727462Open ↗
Showing 1 of 3 on file for this type
▸Other Documents15
▸BISPLOT DIAGRAM3
02/02/2021220727462Open ↗
01/08/2021220727462Open ↗
07/14/2020220727462Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISCHIMNEYS AND VENTS2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISSHUTOFF DAMPERS2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISLOWEST FLOOR ELEVATION2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸BISMAINTENANCE INFORMATION2
03/17/2025220727462Open ↗
03/17/2025220727462Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00977425-S8Open ↗
08/13/2026X00977425-S9Open ↗