Primarily 2 family with 1 store or office
2049 86 STREET
BROOKLYN · BIN 3165862
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
C4-2Zoning
4,200 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: TCC REALTY INC · 2,000 sf lot · 2.1 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 16p · 1 filing · 12 docs
Cellar5p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TCC REALTY INC103/22/2026
EYE CLASSES STATION INC.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LUCID BUILDING ENGINEERING P.C.105/21/2024
NYX ENGINEERING, PLLC106/20/2023
ENTHINK ENGINEERS LLC612/14/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H-BUILDER INCGeneral Contractor303/21/2026
NY BUILDING ASSOCIATES INGeneral Contractor203/21/2026
VOLTRON ELECTRIC LLCElectrical103/22/2026
MES CONSTRUCTION CORPPlumbing107/08/2026
R G M SIGNSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244105/21/2024
ENTHINK ENGINEERS LLC6247511/08/2022
Building Lifecycle
All (36)Filed (8)Permit Issued (4)Signed Off (3)Violation (1)Inspection (6)Objection (7)Special Inspection (7)
06/10/2024
Signed off — Alteration
B01051998-I1
05/29/2024
Permit issued — Mechanical Systems
B01051998-I1-MS
05/21/2024
Filed — Alteration
B01051998-I1
05/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
05/15/2024
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
05/15/2024
Special inspection requirement — Final
YUNHO LEE
06/27/2023
Objection raised — Other
06/27/2023
Objection resolved — Addressed
06/27/2023
Objection raised — Scope
06/27/2023
Objection raised — Mechanical
06/27/2023
Objection resolved — Addressed
06/27/2023
Objection raised — Structural
06/27/2023
Objection resolved — Addressed
06/23/2023
Signed off — Alteration
FILING FOR GENERAL CONSTRUCTION AND MECHANICAL WORK FOR THE INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE AT 1ST FLOOR. WORK INCLUDES THE INSTALLATION OF COMMERCIAL KITCHEN AND KITCHEN EXHAUST. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00747346-I1
06/20/2023
Filed — Alteration
FILE BOILER WORK TYPE IN CONJUNCTION WITH PLUMBING APPLICATION JOB#B00756207. INSTALL ONE GAS BOILER AT CELLAR.
B00852050-I1
01/12/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/06/2023
Signed off — Alteration
Propose new illuminated channel letter on raceway on wall for existing first floor commercial space. No change in use, egress or occupancy.
B08055187-I1
01/03/2023
Permit issued — Sign
B08055187-I1-SG
12/14/2022
Filed — Alteration
Propose new illuminated channel letter on raceway on wall for existing first floor commercial space. No change in use, egress or occupancy.
B08055187-I1
12/14/2022
Special inspection requirement — Final
Sunil Saigal
12/02/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/08/2022
Filed — Alteration
FILING FOR GENERAL CONSTRUCTION AND MECHANICAL WORK FOR THE INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE AT 1ST FLOOR. WORK INCLUDES THE INSTALLATION OF COMMERCIAL KITCHEN AND KITCHEN EXHAUST. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00747346-P1
10/27/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sunil Saigal
10/12/2022
Filed — Alteration
FILING FOR PLUMBING WORK TYPE FOR THE INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE AT CELLAR AND 1ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00756207-P2
10/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sunil Saigal
10/03/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/02/2022
Filed — Alteration
FILING FOR PLUMBING WORK TYPE FOR THE INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE AT CELLAR AND 1ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00756207-P1
09/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sunil Saigal
08/04/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/05/2022
Permit issued — Plumbing
B00756207-I1-PL
06/21/2022
Filed — Alteration
FILING FOR PLUMBING WORK TYPE FOR THE INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE AT CELLAR AND 1ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00756207-I1
06/07/2022
Permit issued — Mechanical Systems
B00747346-I1-GC-CX
06/03/2022
Filed — Alteration
FILING FOR GENERAL CONSTRUCTION AND MECHANICAL WORK FOR THE INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE AT 1ST FLOOR. WORK INCLUDES THE INSTALLATION OF COMMERCIAL KITCHEN AND KITCHEN EXHAUST. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00747346-I1
08/13/2008
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offH-BUILDER INC05/29/2024
DOB NOWSignSigned-offR.G.M. SIGNS INC01/03/2023
DOB NOWPlumbingPermit IssuedMES CONSTRUCTION CORP07/05/2022
DOB NOWMechanical SystemsSigned-offNY BUILDING ASSOCIATES IN06/07/2022
BISOTISSUEDRETAIL REMOLDELING GROUP07/28/2004
BISOTISSUEDHERBERT RUDERMAN/ARCHITECT05/26/1993
1 project · most recent 10/12/2022
Gas Water/Sanitary
FiledStatusContractorScope
10/12/2022Permit IssuedMES CONSTRUCTION CORPGas, Water/Sanitary
5 projects · most recent 09/18/2023
General Wiring HVAC Wiring
FiledStatusContractorScope
09/18/2023CompleteVOLTRON ELECTRIC LLCHVAC Wiring
06/10/2023CompleteVOLTRON ELECTRIC LLCGeneral Wiring
03/14/2023CompleteVOLTRON ELECTRIC LLC4 meters, 4 new_meters
12/20/2022CompleteA ELECTRICAL MAIN SVC INC—
06/09/2022CompleteVOLTRON ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/12/2023Pass-Final General Construction Non-Directive 14PassView ↗
12/02/2022Fail-Final General Construction Non-Directive 14FailView ↗
10/27/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/03/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/04/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
05/15/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
05/15/2024Mechanical SystemsNARESH MAHANGUspecial
05/15/2024FinalYUNHO LEEprogress
12/14/2022FinalSunil Saigalprogress
10/17/2022Fire-Resistant Penetrations and JointsSunil Saigalspecial
10/04/2022Fire-Resistant Penetrations and JointsSunil Saigalspecial
09/29/2022Fire-Resistant Penetrations and JointsSunil Saigalspecial
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/29/2026B00747346-I1Request digital key ↗
08/29/2026B00747346-P1Request digital key ↗
08/28/2026B00756207-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/29/2026B00747346-I1Open ↗
08/28/2026B00756207-I1Open ↗
08/28/2026B00756207-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00756207-P2Open ↗
08/28/2026B00756207-I1Open ↗
08/26/2026B00756207-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B08055187-I1Open ↗
08/24/2026B01051998-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/29/2026B00747346-I1Open ↗
08/28/2026B00756207-P2Open ↗
08/28/2026B00756207-P1Open ↗
Showing 3 of 5 on file for this type